Shopping Cart

No products in the cart.

BS ISO 21111-3:2020

$215.11

Road vehicles. In-vehicle Ethernet – Optical 1-Gbit/s physical entity requirements and conformance test plan

Published By Publication Date Number of Pages
BSI 2020 198
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document provides supplemental specifications to a physical layer capable of transmitting 1 Gbit/s over plastic optical fibre compliant with ISO/IEC/IEEE 8802-3:2017/Amd 9:2018, with specific application to communications inside road vehicles.

Additionally, there is a test plan specified for conformance testing. The test plan includes test cases to assure compliance of an IUT with the functionality specified in this document.

ISO/IEC/IEEE 8802-3:2017/Amd 9:2018 is considered indispensable for the application of this document.

The supplemental specifications include wake-up and synchronised link sleep functionality. The specification includes the sublayers, service interfaces, and state diagrams that support the functionality. The supplemental specifications are collected in protocol implementation conformance statement (PICS).

The requirements specified in ISO/IEC/IEEE 8802-3:2017/Amd 9:2018 and in this document constitute the complete PICS that specifies the GEPOF physical entity functionality.

The optical component requirements and test methods for optical 1-Gbit/s transmission of in-vehicle Ethernet are not within the scope of this document.

PDF Catalog

PDF Pages PDF Title
2 undefined
8 Foreword
9 Introduction
11 1 Scope
2 Normative references
12 3 Terms and definitions
4 Abbreviated terms
14 5 Wake-up and synchronised link sleep functionality
5.1 General
15 5.2 PHY service interface for a GEPOF entity
17 5.3 Neighbour PHY service interface for a GEPOF entity
19 5.4 Conciliation service interface
5.4.1 General
21 5.4.2 CON_WakeUpSleepPacket.request
5.4.3 CON_WakeUpSleepPacket.indication
22 5.4.4 CON_WakeUpSleepPacketACK.indication
5.4.5 CON_SignalDetected.indication
5.4.6 CON_OAMActive.indication
23 5.5 FFME service interface
5.5.1 General
25 5.5.2 FFME_PowerDownStatus.request
5.5.3 FFME_PowerDownStatus.indication
5.5.4 FFME_WakeUp.indication
26 5.6 802-3bv service interface
5.6.1 General
28 5.6.2 802-3bv_PowerDownStatus.request
5.6.3 802-3bv_RXDETECT.indication
5.7 WUSME Sublayer
5.7.1 General
5.7.2 WUSME wake-up functionality
31 5.7.3 WUSME synchronised link sleep functionality
33 5.7.4 PHY_SleepStatus.indication generation
5.8 FFME sublayer
5.8.1 General
5.8.2 FFME power state functionality
36 5.9 Conciliation sublayer
5.9.1 General
5.9.2 Conciliation sublayer variables
5.9.3 CRC16 computation
37 5.9.4 Generating ISO/IEC/IEEE 8802-3:2017/Amd 9:2018, Clause 45 stimuli from CON_WakeUpSleepPacket.request
5.9.5 Generating CON_WakeUpSleepPacket.indication from ISO/IEC/IEEE 8802-3:2017/Amd 9:2018, Clause 45 stimuli
38 5.9.6 Generating CON_WakeUpSleepPacketACK.indication from ISO/IEC/IEEE 8802-3:2017/Amd 9:2018, Clause 45 stimuli
5.9.7 Generating CON_SignalDetected.indication from ISO/IEC/IEEE 8802-3:2017/Amd 9:2018, Clause 45 stimuli
5.9.8 Conciliation sublayer constants
39 6 PICS proforma
6.1 General
6.2 Major capabilities/options
6.3 Wake-up and synchronised link sleep PICS items
40 7 Test plan
7.1 Test plan scope
7.2 Test plan architecture
42 7.3 Test plan organization
7.4 Test case sections
43 7.5 Test case reference tables
7.5.1 Block 1: test mode and loopback test cases
44 7.5.2 Block 2: PCS, PMA, PMD and MDI test cases
47 7.5.3 Block 3. EEE, OAM and wake-up and synchronised link sleep test cases
48 7.6 Test setups
7.6.1 General
52 7.6.2 Test setup 1: TS_BASE
53 7.6.3 Test setup 2: TS_EXTEND
54 7.6.4 Test setup 3: TS_SIGPOW
7.6.5 Test setup 4: TS_AOPTX
7.6.6 Test setup 5: TS_ER
7.6.7 Test setup 6: TS_CW
7.6.8 Test setup 7: TS_SW
7.6.9 Test setup 8: TS_RT_FT
7.6.10 Test setup 9: TS_OS
7.6.11 Test setup 10: TS_NOD_POD
55 7.6.12 Test setup 11: TS_DIST
7.6.13 Test setup 12: TS_RIN
7.6.14 Test setup 13: TS_MPD
7.6.15 Test setup 14: TS_TJ
7.6.16 Test setup 15: TS_2LP
7.6.17 Test setup 16: TS_AOPRX
56 7.6.18 Test setup 17: TS_LOOP
57 7.7 Block 1 test cases: test modes and loopbacks
7.7.1 General
7.7.2 LBT_1: Loopback control
58 7.7.3 LBT_2: GMII loopback
60 7.7.4 LBT_3: PMD loopback
62 7.7.5 TMT_1: Test mode configuration general
63 7.7.6 TMT_2: Test mode 1 transmission
65 7.7.7 TMT_4: Test mode 2 transmission
66 7.7.8 TMT_5: Test mode 3 transmission
67 7.7.9 TMT_6: Test mode 4 transmission
68 7.7.10 TMT_7: Test mode 5 transmission
69 7.7.11 TMT_8: Test mode 6 transmission
70 7.7.12 TMT_3: Test mode 1 reception
72 7.7.13 LBT_4: Line loopback
74 7.8 Block 2 test cases: Mandatory functionality
7.8.1 General
7.8.2 PCST_1: PCS transmission signalling
75 7.8.3 PCST_2: PCS transmission PHD
79 7.8.4 PCST_3: Transmission PCS payload data
82 7.8.5 PCST_4: PCS reception header and payload data
83 7.8.6 PCST_5: PCS transmission alignment
85 7.8.7 PCST_6: PCS reception alignment
87 7.8.8 PMAT_1: Transmission PMA power scaling test
90 7.8.9 PMAT_2: THP transmission
92 7.8.10 PMAT_3: State diagrams ‒ Transmit PHD commit point
94 7.8.11 PMAT_4: State diagrams ‒ Receive PHD commit point
96 7.8.12 PMAT_5: State diagrams ‒ TX control
98 7.8.13 PMAT_6: State diagrams ‒ RX control
102 7.8.14 PMAT_7: State diagrams ‒ Link monitor
106 7.8.15 PMAT_8: State diagrams ‒ PHD monitor
110 7.8.16 PMAT_9: State diagrams ‒ Adaptive THP TX
113 7.8.17 PMAT_10: State diagrams ‒ Adaptive THP request
116 7.8.18 PMAT_11: State diagrams ‒ Quality monitor state diagram
120 7.8.19 PMAT_12: Synchronisation
122 7.8.20 PMAT_13: Equalization and BER measurement
124 7.8.21 PMDT_1: PMD transmit function ‒ Electrical to optical
126 7.8.22 PMDT_2: PMD transmit function ‒ Power control
127 7.8.23 PMDT_3: PMD receive function ‒ Optical to electrical
129 7.8.24 PMDT_4: PMD signal detect function
130 7.8.25 PMD_MDIT_1: Transmitter optical specifications ‒ AOP
131 7.8.26 PMD_MDIT_2: Transmitter optical specifications ‒ ER
132 7.8.27 PMD_MDIT_3: Transmitter optical specifications ‒ Centre wavelength
133 7.8.28 PMD_MDIT_4: Transmitter optical specifications ‒ Spectral width
7.8.29 PMD_MDIT_5: Transmitter optical specifications ‒ Rise time
134 7.8.30 PMD_MDIT_6: Transmitter optical specifications ‒ Fall time
135 7.8.31 PMD_MDIT_7: Transmitter optical specifications ‒ Signal overshoot
136 7.8.32 PMD_MDIT_8: Transmitter optical specifications ‒ Positive output droop
137 7.8.33 PMD_MDIT_9: Transmitter optical specifications ‒ Negative output droop
7.8.34 PMD_MDIT_10: Transmitter optical specifications ‒ Signal distortion
138 7.8.35 PMD_MDIT_11: Transmitter optical specifications ‒ Relative intensity noise
139 7.8.36 PMD_MDIT_12: Transmitter optical specifications ‒ Transmitter off transition time
142 7.8.37 PMD_MDIT_13: Transmitter optical specifications ‒ Transmitter on transition time
144 7.8.38 PMD_MDIT_14: Transmitter optical specifications ‒ Modal power distribution
145 7.8.39 PMD_MDIT_15: Transmitter optical specifications ‒ Timing jitter
146 7.8.40 PMD_MDIT_16: Receiver optical specifications ‒ AOP for a minimum BER
147 7.8.41 PMD_MDIT_17: Receiver optical specifications ‒ Damage threshold power
148 7.8.42 DLYT_1: Transmission plus reception delay
149 7.9 Block 3 test cases: Optional functionality
7.9.1 General
150 7.9.2 EEET_1: Enter to LPI mode transmit operation
153 7.9.3 EEET_2: EEE capability exchange
155 7.9.4 EEET_3: Loop test for LPI mode
158 7.9.5 EEET_4: Resume from LPI mode transmit operation
160 7.9.6 OAMT_1: State diagrams ‒ OAM transmit control
165 7.9.7 OAMT_2: State diagrams ‒ OAM receive control
169 7.9.8 OAMT_3: Loop test for OAMPDU transmission and reception
175 7.9.9 WUST_1: WUSME synchronised link sleep state diagram ‒ Synchronised link sleep ACK
179 7.9.10 WUST_2: WUSME synchronised link sleep state diagram ‒ SLEEP_ACK packet reception
183 7.9.11 WUST_3: WUSME synchronised link sleep state diagram ‒ SLEEP packet reception
186 7.9.12 WUST_4: WUSME synchronised link sleep state diagram ‒ Sleep rejection
192 7.9.13 WUST_5: WUSME wake-up state diagram
196 Bibliography
BS ISO 21111-3:2020
$215.11