BS ISO 22932-1:2020
$198.66
Mining. Vocabulary – Planning and surveying
Published By | Publication Date | Number of Pages |
BSI | 2020 | 70 |
This document specifies the commonly used terms in mine planning and surveying. Only those terms that have a specific meaning in this field are included.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
6 | Foreword |
7 | Introduction |
9 | 1 Scope 2 Normative references 3 Terms and definitions 3.1 Planning 3.1.1 General terms |
10 | 3.1.2 Prospecting |
11 | 3.1.3 Exploration |
12 | 3.1.4 Construction 3.1.5 Mine closure |
13 | 3.1.6 Exploitation |
21 | 3.1.7 Safety and rescue 3.1.8 Ventilation 3.2 Surveying 3.2.1 General terms |
27 | 3.2.2 Reference |
35 | 3.2.3 Measurement |
39 | 3.2.4 Results |
40 | 3.2.5 Errors |
42 | 3.2.6 Chain surveying |
43 | 3.2.7 Traverse |
46 | 3.2.8 Angular measurement |
50 | 3.2.9 Leveling and centering an instrument |
52 | 3.2.10 Photogrammetry |
53 | 3.2.11 Planimetry |
54 | 3.2.12 Course determination |
60 | 3.2.13 Types of survey |
64 | 3.3 Mapping |
68 | Bibliography |