BS ISO 28598-1:2017 – TC:2020 Edition
$217.84
Tracked Changes. Acceptance sampling procedures based on the allocation of priorities principle (APP) – Guidelines for the APP approach
Published By | Publication Date | Number of Pages |
BSI | 2020 | 75 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
39 | National foreword |
44 | Foreword |
46 | Introduction |
48 | 1 Scope 2 Normative references |
49 | 3 Terms, definitions, symbols and abbreviated terms 3.1 Terms and definitions |
50 | 3.2 Symbols and abbreviated terms |
51 | 4 General overview of quality 4.1 Quality measures 4.2 Role of information on quality assurance 5 Selection of a sampling system 5.1 Relations between sampling systems |
52 | 5.2 Continuing series of lots 5.3 Separate lots 5.4 Features of the ISO 28598 sampling system |
53 | 6 Requirements for the quality of lots and relationships between the parties 6.1 Lot quality requirements 6.1.1 The form of lot quality requirements 6.1.2 Satisfactory and unsatisfactory lots 6.1.3 Objectives 6.2 Relationships of the parties concerning lot quality 6.3 Preventative measures |
54 | 7 Objective of the inspection conducted by supplier, customer and third party 7.1 General 7.2 Objective of the inspection conducted by the supplier 7.3 Objective of the inspection conducted by the customer 7.4 Objective of the inspection conducted by a third party |
55 | 8 Requirements of the system of sampling inspection conducted by supplier, customer or third party 8.1 Common system requirements 8.2 Reproducibility of decisions made by sampling inspection results 8.3 System flexibility and the possibility to accommodate individual capabilities and interests of the inspecting parties 8.4 Cost efficiency of inspection |
56 | 8.5 Types of information used when organizing inspection and in decision making 9 Prior information 9.1 Types of prior information 9.2 APP approach for considering prior information 9.3 Economic aspects of prior information |
57 | 10 Choosing sampling plans and schemes 10.1 General 10.2 Characteristics of sampling plans and schemes 10.3 Rights of the parties in choosing sampling plans and schemes 10.4 Permissible sampling plans and schemes 10.4.1 General 10.4.2 Constraints of type I |
58 | 10.4.3 Constraints of type II 10.5 Setting the constraints for risks and confidence levels 10.5.1 Constraints of type I |
59 | 10.5.2 Constraints of type II 10.6 Decision-making rules 10.6.1 Decision-making with respect to supplier and customer inspection |
60 | 10.6.2 Constraints of type I 10.6.3 Constraints of type II 11 Re-submission of previously non-accepted lots on supplier inspection |
62 | Annex A (informative) Allocation of priorities principle |
67 | Annex B (informative) Recommendations for setting customer’s risks on supplier inspection |
73 | Bibliography |