Shopping Cart

No products in the cart.

BS ISO 6963:2024

$167.15

Bunker cargo loading from oil terminal to bunker tanker using Coriolis mass flow meter

Published By Publication Date Number of Pages
BSI 2024 38
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weā€™re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 undefined
7 Foreword
8 Introduction
9 1 Scope
2 Normative references
3 Terms and definitions
14 4 Application
15 5 Metrological requirements
5.1 General
5.2 Mass flow meter requirements
16 5.3 MFM measuring system requirements
17 5.4 Post approval maintenance
5.4.1 Meter zero verification frequency
5.4.2 Zero verification procedure
5.4.3 Meter and ancillary devices verification and/or calibration frequency
5.4.4 Software upgrade or update
6 System integrity requirements
6.1 General
6.2 Metrological control
6.2.1 Documentation
18 6.2.2 Type approval and pattern evaluation
6.3 Security features
6.3.1 Equipment security
6.3.2 Software security
6.3.3 Data security
6.3.4 Critical alarm
6.4 Installation and commissioning
6.4.1 Pre-installation and MFM bunker system sealing plan
19 6.4.2 Installation and re-installation
6.4.3 Commissioning
6.5 Operational security
6.6 Maintenance control
6.6.1 Maintenance control of MFM bunker system
6.6.2 Re-commissioning
7 Meter selection and installation requirements
7.1 General
20 7.2 Site survey at terminals
7.3 Meter selection
7.4 Meter installation
21 7.5 Meter commissioning
8 Site acceptance test requirements
9 Metering procedures
9.1 General
9.2 Documentation
9.2.1 General
22 9.2.2 System documentation
9.2.3 Pre-loading documentation
9.2.4 Post-loading documentation
9.3 Additional documentation at the terminal
9.3.1 Meter totalizer log
23 9.3.2 System documents at the terminal
9.4 Pre-loading procedures
9.4.1 Pre-loading conference
9.4.2 System integrity seals document
9.4.3 Meter reading record
9.5 Loading procedures
9.5.1 General
24 9.5.2 Start of loading
25 9.5.3 End of loading
9.6 Post-loading procedures
9.6.1 Meter reading record
9.6.2 Bunker cargo metering ticket
9.6.3 Determination of loaded quantity
26 9.7 Others
9.7.1 MFM measuring system failure
9.7.2 Disputes
10 Bunker cargo quality
10.1 Bunker cargo specifications
27 10.2 Sampling
10.2.1 Location of sampling equipment
10.2.2 Sampling procedure
10.3 Documentation
28 Annex A (informative) Uncertainty budget table
29 Annex B (normative) Zero verification procedure
30 Annex C (normative) Metrological and system integrity requirements
31 Annex D (informative) Typical schematic diagram for MFM bunker system (for bunker cargo loading)
32 Annex E (informative) Example of letter of protest for bunker cargo loading
33 Annex F (informative) Bunker cargo claims procedure for quantity dispute
34 Annex G (informative) Example of a bunker cargo sample label
35 Annex H (informative) Example of a certificate of quality
36 Bibliography
BS ISO 6963:2024
$167.15