Shopping Cart

No products in the cart.

BSI 13/30288537 DC:2013 Edition

$13.70

BS EN 12697-33. Bituminous mixtures. Test methods for hot mix asphalt. Part 33. Specimen prepared by roller compactor

Published By Publication Date Number of Pages
BSI 2013 21
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
8 1 Scope
2 Normative references
3 Terms, definitions, symbols and abbreviations
3.1 Terms and definitions
9 3.2 Symbols and abbreviations
10 4 Principle
5 Apparatus
5.1 Method using a wheel or two wheels fitted with pneumatic tyres
11 5.2 Methods using a smooth steel roller
5.2.1 Smooth steel roller
12 5.2.2 Steel roller used on wheel fitted with pneumatic tyres
5.3 Method using a roller running on vertical sliding steel plates
5.3.2 A device to compact the bituminous mixture in the moulds (see Figure 2) and which shall comprise:
13 6 Preparation
6.1 Mass of bituminous mixture
14 6.2 Filling the mould
7 Compaction procedure
7.1 Method using wheels fitted with pneumatic tyres
7.1.1 Test conditions
7.1.2 Compaction
7.1.2.1 General
7.1.2.2 Compaction by a specified energy
15 7.1.2.3 Compaction to obtain a specified air voids content or compaction degree
7.1.2.4 Smooth cylinder for final compaction
7.1.3 Timing
7.2 Methods using a smooth steel roller
7.2.1 General
7.2.2 Compaction by a specified energy
7.2.3 Compaction with controlled compaction energy
16 7.2.4 Compaction to obtain a specified air voids content or compaction degree
7.2.4.1 Compaction by a constant energy
7.2.4.2 Compaction with controlled compaction energy
7.3 Method using a roller running on vertical sliding steel plates
7.4 Removing the mould
8 Test report
17 Table 1 — Sweep plan, specimens 500 mm ( 180 mm ( e, light compaction, 1 tyre
18 Table 2 — Sweep plan, specimens 600 mm ( 400 mm ( e, light compaction, 2 tyres
19 Table 3 — Sweep plan, specimens 500 mm ( 180 mm ( e, heavy compaction, 1 tyre
20 Table 4 — Sweep plan, specimens 600 mm ( 400 mm ( e, heavy compaction, 2 tyres
21 Annex A (informative) Example of energy-controlled smooth roller compaction procedure
BSI 13/30288537 DC
$13.70