BSI 22/30422761 DC:2022 Edition
$13.70
BS ISO 5091-2. Guidelines for structural intervention of existing concrete structures using cement-based materials – Part 2. Top-surface overlaying
Published By | Publication Date | Number of Pages |
BSI | 2022 | 31 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
7 | Foreword |
8 | Introduction |
9 | 1 Scope |
10 | 2 Normative references 3 Terms and definitions |
11 | 4 Investigation of existing structure 4.1 General 4.2 Investigation 4.2.1 Investigation using documents, records, etc. 4.2.2 On-site investigation 5 Intervention design 5.1 General |
12 | 5.2 Structural plan |
13 | 5.3 Structural details |
14 | 6 Materials 6.1 General 6.2 Materials in existing structure 6.3 Materials used in repairing or strengthening parts 6.3.1 Cementitious materials |
15 | 6.3.2 Reinforcing materials 6.3.3 Bonding products 6.3.4 Waterproof materials 6.3.5 Pavement materials 6.4 Characteristic values and design values of materials for repaired or strengthened parts 6.4.1 General |
16 | 6.4.2 Cementitious materials 6.4.3 Reinforcing materials 6.4.4 Bonding products |
17 | 7 Actions 7.1 General 7.2 Actions for intervention design 8 Performance verification for repaired or strengthened structure 8.1 General |
18 | 8.2 Calculation of response 8.2.1 General 8.2.2 Modeling of structure 8.2.3 Structural analysis 8.2.4 Calculation of response values 8.3 Durability verification 8.3.1 General 8.3.2 Verification related to steel corrosion |
19 | 8.4 Safety verification 8.4.1 General 8.4.2 Verification related to failure |
21 | 8.4.3 Verification related to fatigue failure |
23 | 8.5 Serviceability verification 8.5.1 General 8.5.2 Stress level limit 8.5.3 Verification related to appearance 8.6 Restorability verification 8.6.1 General 8.6.2 Structural details related to seismic performance 8.7 Structural details 8.7.1 Thickness of top-surface overlaying parts |
24 | 8.7.2 Cover 8.7.3 Placement of reinforcing materials 8.7.4 Joints for reinforcing materials |
25 | 9 Construction 9.1 General |
26 | 9.2 Prior investigation and construction plan |
27 | 9.3 Mix proportion of cementitious materials 9.4 Preparation |
28 | 9.5 Surface treatment 9.6 Assembly of reinforcing materials 9.7 Manufacture of cementitious materials 9.8 Transportation, placement, compaction and finish |
29 | 9.9 Curing 9.10 Pavement |
30 | 9.11 Quality control 9.12 Inspection |
31 | 10 Records 11 Maintenance |