Shopping Cart

No products in the cart.

BSI 22/30422761 DC:2022 Edition

$13.70

BS ISO 5091-2. Guidelines for structural intervention of existing concrete structures using cement-based materials – Part 2. Top-surface overlaying

Published By Publication Date Number of Pages
BSI 2022 31
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
7 Foreword
8 Introduction
9 1 Scope
10 2 Normative references
3 Terms and definitions
11 4 Investigation of existing structure
4.1 General
4.2 Investigation
4.2.1 Investigation using documents, records, etc.
4.2.2 On-site investigation
5 Intervention design
5.1 General
12 5.2 Structural plan
13 5.3 Structural details
14 6 Materials
6.1 General
6.2 Materials in existing structure
6.3 Materials used in repairing or strengthening parts
6.3.1 Cementitious materials
15 6.3.2 Reinforcing materials
6.3.3 Bonding products
6.3.4 Waterproof materials
6.3.5 Pavement materials
6.4 Characteristic values and design values of materials for repaired or strengthened parts
6.4.1 General
16 6.4.2 Cementitious materials
6.4.3 Reinforcing materials
6.4.4 Bonding products
17 7 Actions
7.1 General
7.2 Actions for intervention design
8 Performance verification for repaired or strengthened structure
8.1 General
18 8.2 Calculation of response
8.2.1 General
8.2.2 Modeling of structure
8.2.3 Structural analysis
8.2.4 Calculation of response values
8.3 Durability verification
8.3.1 General
8.3.2 Verification related to steel corrosion
19 8.4 Safety verification
8.4.1 General
8.4.2 Verification related to failure
21 8.4.3 Verification related to fatigue failure
23 8.5 Serviceability verification
8.5.1 General
8.5.2 Stress level limit
8.5.3 Verification related to appearance
8.6 Restorability verification
8.6.1 General
8.6.2 Structural details related to seismic performance
8.7 Structural details
8.7.1 Thickness of top-surface overlaying parts
24 8.7.2 Cover
8.7.3 Placement of reinforcing materials
8.7.4 Joints for reinforcing materials
25 9 Construction
9.1 General
26 9.2 Prior investigation and construction plan
27 9.3 Mix proportion of cementitious materials
9.4 Preparation
28 9.5 Surface treatment
9.6 Assembly of reinforcing materials
9.7 Manufacture of cementitious materials
9.8 Transportation, placement, compaction and finish
29 9.9 Curing
9.10 Pavement
30 9.11 Quality control
9.12 Inspection
31 10 Records
11 Maintenance
BSI 22/30422761 DC
$13.70