BSI PD CEN/TR 16958:2017:2018 Edition
$142.49
Road marking materials. Conditions for removing/masking road markings
Published By | Publication Date | Number of Pages |
BSI | 2018 | 28 |
This document provides guidance for removal or/and masking existing road markings. It includes methods of removal and criteria for selecting the removal method, as well as the requirements for the masking materials and the performance requirements of the resulting surface. It does not apply to removable temporary road markings, which shall be removed in accordance to the manufacturer instructions. Some recommendations are given for removing and masking road studs, removing wet paints, removing curing membranes in new cement concrete pavements and cleaning existing road markings.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
6 | 1 Scope 2 Normative references 3 Terms and definitions 4 Criteria for selecting removal or/and masking procedure |
8 | 5 Removal methods and masking materials 5.1 Removal methods |
9 | 5.2 Masking materials |
10 | 6 Performance requirements 6.1 Removal works 6.1.1 General 6.1.2 Test methods |
11 | 6.1.3 Table of performance requirements |
12 | 6.1.4 Environmental prescriptions 6.2 Masking 6.2.1 General |
13 | 6.2.2 Test methods 6.2.3 For visual aspects 6.2.4 For changes on surface properties 6.2.5 Requirements 7 Other works 7.1 Removal and masking road studs 7.2 Wet paint markings |
14 | 7.3 Cleaning/renovation of line markings 7.4 Removal of concrete curing membranes |
15 | Annex A (informative)Methods for removing road markings A.1 General A.2 Removal through clean water A.2.1 General A.2.2 PeelJetting |
17 | A.2.3 Waterblasting A.2.4 High Pressure Water Jetting, others A.2.5 Low pressure water Jetting A.3 Removal through metallic technologies A.3.1 Shot peeling (steel ball technology) |
18 | A.3.2 Rotating metallic disc A.3.3 Grinding or Scrabbling |
20 | A.3.4 Bush Hammer |
21 | A.4 Others A.4.1 Sand Blasting A.4.2 Chemical marking removers A.4.3 Synthetic media system A.4.4 Heat lance A.5 Execution of work |
22 | Annex B (informative)Photographic references |
23 | Annex C (informative)Assessing the damage to the pavement afterthe removal of road markings C.1 Introduction C.2 Raveling C.2.1 General C.2.2 Assessment of the raveling with MTD |
24 | C.2.3 Assessment of the raveling with MPD |
25 | C.3 Grooving |