Shopping Cart

No products in the cart.

BSI PD CEN/TS 15427-1-3:2021

$142.49

Railway applications. Wheel/Rail friction management – Equipment and Application. Adhesion materials

Published By Publication Date Number of Pages
BSI 2021 24
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document is limited to specifying the requirements when applying adhesion material to the interface between the wheel tread and the crown of the rail, and includes both trainborne and trackside solutions.

This document only covers the equipment and application of adhesion material to the active interface.

This document defines:

  1. the characteristics that systems for the application of adhesion materials of the wheel-rail interface shall achieve, together with applicable inspection and test methods to be carried out for verification;

  2. all relevant terminology which is specific to the adhesion materials of the wheel-rail interface.

This document only applies to the mainline railway.

NOTE 1

This document can also be used for other railways, e.g urban rail.

NOTE 2

Where technologies are used to influence the wheel/rail interface, other than the application of a material, this document is out of scope but can be used as guidance.

PDF Catalog

PDF Pages PDF Title
2 undefined
7 1 Scope
2 Normative references
8 3 Terms and definitions
9 4 General
4.1 Purpose
4.2 Application
10 5 Requirements for trainborne equipment
5.1 General
5.2 Design of trainborne equipment
11 5.3 Installation of trainborne equipment
5.4 Operations, Inspection and maintenance
12 5.5 Application
5.6 Verification
13 6 Requirements for trackside equipment
6.1 General
6.2 Design of trackside equipment
14 6.3 Installation of trackside equipment
6.4 Operations, inspection and maintenance
15 6.5 Application
6.6 Verification
16 Annex A (informative)Types of trainborne equipment
A.1 Introduction
A.2 Trainborne equipment – Sand application to the active interface
17 Annex B (informative)Guidance on approvals testing and verification
B.1 General
18 B.2 Trials
B.2.1 General
B.2.2 Monitoring
B.2.3 Outcome of trial
19 Annex C (informative)Guideline braking tests for Adhesion Materials (trainborne and trackside equipment)
C.1 General
C.2 Choosing the right test vehicle:
20 C.3 Trainborne equipment
C.4 Test track
C.5 Test conditions
C.6 Conducted tests
C.7 Testing proactive adhesion material
C.7.1 Test purpose
C.7.2 Test procedure
C.7.3 Reference braking distance
21 C.7.4 Application adhesion material
C.7.5 Assessment criterion
C.8 Testing reactive adhesion material:
C.8.1 Test purpose
C.8.2 Reference braking distance
C.8.3 Application adhesion material
C.8.4 Point of braking
C.8.5 Assessment criterion
C.9 Effect on brake blocks and MTB
BSI PD CEN/TS 15427-1-3:2021
$142.49