BSI PD CEN/TS 18036:2024
$102.76
Light and lighting. Commissioning of lighting systems in buildings
Published By | Publication Date | Number of Pages |
BSI | 2024 | 22 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
7 | 1 Scope 2 Normative references 3 Terms and definitions |
8 | 4 General aspects 4.1 Benefits of commissioning for lighting systems |
9 | 4.2 The need for commissioning 4.3 Overview of commissioning |
10 | 4.4 Content of commissioning for lighting systems 4.5 The acceptance of commissioning deliverables 5 Commissioning methods and selection 5.1 Methods of commissioning |
11 | 5.2 Selection of commissioning methods |
12 | 6 Roles and responsibilities 6.1 General 6.2 Owner or tenant 6.3 Design team |
13 | 6.4 Contractors, subcontractors and suppliers 6.5 Commissioning team |
14 | 7 Commissioning activities 7.1 General 7.2 Pre-commissioning phase 7.3 Installation phase |
15 | 7.4 Field commissioning phase 7.5 Post occupancy phase |
16 | 8 Documentation requirements 8.1 General 8.2 Commissioning plan 8.3 Commissioning specification |
17 | 8.4 Commissioning observation, inspection and calibration report 8.5 Issues log |
18 | 8.6 Training plan 8.7 Commissioning report |
19 | 9 Contractual completion |