BSI PD IEC TR 63176:2019
$142.49
Process analysis technology systems as part of safety instrumented systems
Published By | Publication Date | Number of Pages |
BSI | 2019 | 32 |
This document encompasses recommendations for planning, installation and operation (incl. maintenance) of process analyzer technology measuring equipment in process industry safety instrumented systems. It covers all necessary steps for the qualification of safety equipment and supplements the safety management of safety instrumented system equipment through the addition of special requirements for process analyzer technology equipment. This document does not encompass the entire safety management of safety instrumented system equipment.
The term “qualification” used in this recommendation refers exclusively to the testing of the suitability of the process analyzer technology system for use in a safety instrumented system device. It is different from the term “qualification” used in the pharmaceutical environment.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
4 | CONTENTS |
6 | FOREWORD |
8 | INTRODUCTION |
9 | 1 Scope 2 Normative references 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions |
11 | 3.2 Abbreviated terms |
12 | 4 Qualification process 4.1 Overview |
14 | 4.2 Recommendation for constructor requirements Figures Figure 1 – Qualification process levels for a PAT measuring system |
15 | 4.3 Recommendation for plant operator requirements |
16 | 4.4 Basic testing (analyser only) 4.5 Engineering 4.5.1 General |
17 | 4.5.2 Design data 4.5.3 Analyser including application 4.5.4 Sample conditioning 4.5.5 HFT |
18 | 4.5.6 Failure mode effects and diagnosis analysis of the PAT system (FMEDA) 4.5.7 Estimation of the PFDPAT value Table 1 – Minimum HFT requirements according to SIL |
19 | 4.5.8 Proven performance – from case to case following prior in-service testing of the PAT system 4.5.9 Safety logic in the PAT system |
20 | 4.5.10 Sample switching 4.5.11 Compilation of a plan for periodic inspections during the runtime 4.6 Commissioning of the safety system 4.7 Documentation of the qualification process |
21 | 5 Regular operation 5.1 General 5.2 Periodic testing during runtime 5.3 Documents and records in operation 5.3.1 General 5.3.2 Maintenance schedule 5.3.3 Working instructions 5.3.4 Record of work realised |
22 | 5.3.5 Fault data recording 5.4 Evaluation of fault data and handling of deviations 5.5 Modifications 5.5.1 Modifications to the PAT system 5.5.2 Modifications of the process engineering process |
23 | 5.6 Decommissioning and recommissioning 5.6.1 Decommissioning 5.6.2 Recommissioning 5.7 Grandfathering |
24 | Annex A (informative)Basic testing of analysers |
26 | Figure A.1 – Basic testing process for analysers in SIS |
27 | Annex B (informative)FMEDA – documentation of safety assessment (example) Figure B.1 – FMEDA – documentation of safety assessment (example) |
28 | Annex C (informative)PFD – numerical time-discrete determination |
31 | Bibliography |