Shopping Cart

No products in the cart.

BSI PD IEC TS 63222-1:2021:2022 Edition

$215.11

Power quality management – General guidelines

Published By Publication Date Number of Pages
BSI 2022 84
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 undefined
4 CONTENTS
6 FOREWORD
8 INTRODUCTION
9 1 Scope
10 2 Normative references
Tables
Table 1 – Content of IEC TS 63222-1
12 3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
14 3.2 Abbreviated terms
Table 2 – Abbreviations of IEC TS 63222-1
15 4 Use cases list
4.1 List of business use cases and business roles of the domains
Figure 1 – Organisation of the use cases
16 Table 3 – Lists of business use cases
17 4.2 List of system use cases and system roles
Table 4 – Business roles of IEC TS 63222-1
Table 5 – Lists of the system use cases
18 5 Provisions
5.1 Power quality assessment
5.1.1 General
Table 6 – Lists of system roles
19 5.1.2 Monitoring assessment
5.1.3 Monitoring assessment process
Figure 2 – Overview of the power quality management main functions
20 5.1.4 Predicted assessment
5.1.5 Predicted assessment process
5.1.6 Background description and analysis
5.1.7 Disturbance anticipation
21 5.1.8 Impacts analysis
5.2 PQ monitoring system
5.2.1 General
5.2.2 Monitoring points
22 5.2.3 Monitoring equipment
5.2.4 Related information and communication system
5.3 Economical assessment
5.3.1 General
23 5.3.2 Economical assessment of PQ provisions
24 5.3.3 Economical assessment of unsatisfactory PQ objectives/results
25 5.4 PQ requirement
5.5 Mitigation/Trouble shooting
5.5.1 Total requirements
26 5.5.2 Power quality mitigation scheme
28 Annex A (normative)Use case
A.1 Business use cases
A.1.1 BUC 1: Manage power quality over the grid
30 A.1.2 BUC 2: Manage complaints on power quality over the network
38 A.1.3 BUC 3: Provide reports on network power quality
44 A.1.4 BUC 4: Take into account power quality constraints in connecting a user to the grid
50 A.2 System UCs
A.2.1 SUC1: Measure power quality on a specific point of the network
62 A.2.2 SUC2: Monitor power quality on the network
71 A.2.3 SUC3: Assess the emission limit related to power quality technical parameters in power system
76 Annex B (informative)Main contents and requirements of power quality monitoring assessment report
B.1 Overview
B.2 Basic information of the assessment object
B.3 Basic information of power grid
B.4 Basis of assessment and standard
B.5 Monitoring instructions
B.6 Analysis and conclusion
B.7 Measures and suggestions (as required)
B.8 Attachments
77 Annex C (informative)Main contents and requirements of power quality predicted assessment report
C.1 Overview
C.2 Basic information of the assessment object
C.3 Basic situation of power grid
C.4 Basis of assessment and standard
C.5 Brief description of assessment method
78 C.6 Calculation and analysis
C.7 Measures and suggestions (as required)
C.8 Conclusion
C.9 Attachments
79 Annex D (informative)Economic data of power quality
D.1 Data structure
D.2 Basic data of economic cost of power users
80 D.3 Basic data of economic cost of public distribution network
D.4 Power quality related monitoring data
81 D.5 Equipment and system parameters
82 Bibliography
IEC references
83 Non-IEC references
BSI PD IEC TS 63222-1:2021
$215.11