CA Caltrans StdSpecs 2015
$26.00
California State Transportation Agency – Standard Specifications
Published By | Publication Date | Number of Pages |
CA | 2015 | 1155 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
7 | DIVISION I GENERAL PROVISIONS 1 GENERAL 1-1.01 GENERAL |
8 | 1-1.02 STYLE VARIATIONS 1-1.03–1-1.04 RESERVED 1-1.05 REFERENCES |
9 | 1-1.06 ABBREVIATIONS |
13 | 1-1.07 DEFINITIONS 1-1.07A General 1-1.07B Glossary |
19 | 1-1.08 DISTRICTS |
20 | 1-1.09 FREEZE-THAW AREAS 1-1.10 PAVEMENT CLIMATE REGIONS |
21 | 1-1.11 WEBSITES, ADDRESSES, AND TELEPHONE NUMBERS |
23 | 1-1.12 MISCELLANY 1-1.13–1-1.15 RESERVED |
25 | 2 BIDDING 2-1.01 GENERAL 2-1.02 BID INELIGIBILITY 2-1.03 CONTRACTOR REGISTRATION 2-1.04–2-1.05 RESERVED 2-1.06 BID DOCUMENTS 2-1.06A General 2-1.06B Supplemental Project Information |
26 | 2-1.06C–2-1.06D Reserved 2-1.07 JOB SITE AND DOCUMENT EXAMINATION 2-1.08 RESERVED 2-1.09 BID ITEM LIST 2-1.10 SUBCONTRACTOR LIST 2-1.11 RESERVED 2-1.12 DISADVANTAGED BUSINESS ENTERPRISES 2-1.12A General |
27 | 2-1.12B Disadvantaged Business Enterprise Goal 2-1.12B(1) General |
28 | 2-1.12B(2) DBE Commitment Submittal 2-1.12B(3) DBE Good Faith Efforts Submittal 2-1.13–2-1.14 RESERVED 2-1.15 DISABLED VETERAN BUSINESS ENTERPRISES 2-1.15A General 2-1.15B Projects $5 Million or Less 2-1.15C Projects More Than $5 Million 2-1.15C(1) General |
29 | 2-1.15C(2) DVBE Incentive 2-1.15C(3) Incentive Evaluation 2-1.16–2-1.17 RESERVED 2-1.18 SMALL BUSINESS AND NON–SMALL BUSINESS SUBCONTRACTOR PREFERENCES 2-1.18A General 2-1.18B Small Business Preference |
30 | 2-1.18C Non–Small Business Subcontractor Preference 2-1.19–2-1.26 RESERVED 2-1.27 CALIFORNIA COMPANIES |
31 | 2-1.28–2-1.30 RESERVED 2-1.31 OPT OUT OF PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS 2-1.32 RESERVED 2-1.33 BID DOCUMENT COMPLETION AND SUBMITTAL 2-1.33A General 2-1.33B Electronic Bids 2-1.33C Paper Bids 2-1.33D Bid Form Submittal Schedules 2-1.33D(1) General 2-1.33D(2) Federal-Aid Contracts 2-1.33D(2)(a) General 2-1.33D(2)(b) Contracts with a DBE Goal |
32 | 2-1.33D(2)(c) Contracts without a DBE Goal 2-1.33D(2)(d)–2-1.33D(2)(h) Reserved 2-1.33D(3) Non-Federal-Aid Contracts 2-1.33D(3)(a) General 2-1.33D(3)(b) Contracts with a DVBE Goal |
33 | 2-1.33D(3)(c) Contracts without a DVBE Goal 2-1.33D(3)(d)–2-1.33D(3)(h) Reserved 2-1.33D(4)–2-1.33D(9) Reserved 2-1.34 BIDDER’S SECURITY 2-1.35–2-1.39 RESERVED 2-1.40 BID WITHDRAWAL |
34 | 2-1.41–2-1.42 RESERVED 2-1.43 BID OPENING 2-1.44–2-1.45 RESERVED 2-1.46 DEPARTMENT’S DECISION ON BID 2-1.47 BID RELIEF 2-1.48 RESERVED 2-1.49 SUBMITTAL FAILURE HISTORY 2-1.50 BID RIGGING |
35 | 3 CONTRACT AWARD AND EXECUTION 3-1.01 GENERAL 3-1.02 CONSIDERATION OF BIDS 3-1.02A General 3-1.02B Tied Bids 3-1.03 CONTRACTOR REGISTRATION 3-1.04 CONTRACT AWARD 3-1.05 CONTRACT BONDS (PUB CONT CODE §§ 10221 AND 10222) |
36 | 3-1.06 CONTRACTOR LICENSE 3-1.07 INSURANCE POLICIES 3-1.08 SMALL BUSINESS PARTICIPATION REPORT 3-1.09–3-1.10 RESERVED 3-1.11 PAYEE DATA RECORD 3-1.12 RESERVED 3-1.13 FORM FHWA-1273 3-1.14–3-1.17 RESERVED 3-1.18 CONTRACT EXECUTION |
38 | 3-1.19 BIDDERS’ SECURITIES |
39 | 4 SCOPE OF WORK 4-1.01 GENERAL 4-1.02 INTENT 4-1.03 WORK DESCRIPTION 4-1.04 USE OF MATERIALS FOUND ON THE JOB SITE 4-1.05 CHANGES AND EXTRA WORK 4-1.05A General 4-1.05B Work-Character Changes 4-1.06 DIFFERING SITE CONDITIONS (23 CFR 635.109) 4-1.06A General 4-1.06B Contractor’s Notification |
40 | 4-1.06C Engineer’s Investigation and Decision 4-1.07 VALUE ENGINEERING 4-1.07A General 4-1.07B Value Engineering Change Proposal |
41 | 4-1.07C Value Analysis Workshop |
42 | 4-1.08–4-1.12 RESERVED 4-1.13 CLEANUP |
43 | 5 CONTROL OF WORK 5-1.01 GENERAL 5-1.02 CONTRACT COMPONENTS 5-1.03 ENGINEER’S AUTHORITY |
44 | 5-1.04–5-1.05 RESERVED 5-1.06 PROTESTS 5-1.07–5-1.08 RESERVED 5-1.09 PARTNERING 5-1.09A General |
45 | 5-1.09B Partnering Facilitator, Workshops, and Monthly Evaluation Surveys 5-1.09C Training in Partnering Skills Development 5-1.09D Payment |
46 | 5-1.10–5-1.11 RESERVED 5-1.12 ASSIGNMENT 5-1.13 SUBCONTRACTING 5-1.13A General 5-1.13B Disadvantaged Business Enterprises 5-1.13B(1) General |
47 | 5-1.13B(2) Disadvantaged Business Enterprises |
48 | 5-1.13C Disabled Veteran Business Enterprises 5-1.13D Non–Small Businesses |
49 | 5-1.13E–5-1.13I Reserved 5-1.14–5-1.15 RESERVED 5-1.16 REPRESENTATIVE 5-1.17 CHARACTER OF WORKERS 5-1.18–5.19 RESERVED 5-1.20 COORDINATION WITH OTHER ENTITIES 5-1.20A General 5-1.20B Permits, Licenses, Agreements, and Certifications 5-1.20B(1) General 5-1.20B(2) Before Award 5-1.20B(3) After Award |
50 | 5-1.20B(4) Contractor–Property Owner Agreement 5-1.20C Railroad Relations 5-1.20D Occupied Improvements within the Right-of-Way 5-1.20E Water Meter Charges 5-1.20F Irrigation Water Service Charges 5-1.20G–5-1.20J Reserved 5-1.21–5-1.22 RESERVED 5-1.23 SUBMITTALS 5-1.23A General |
51 | 5-1.23B Action Submittals 5-1.23B(1) General 5-1.23B(2) Shop Drawings |
52 | 5-1.23B(3)–5-1.23B(10) Reserved 5-1.23C Informational Submittals 5-1.24–5-1.25 RESERVED 5-1.26 CONSTRUCTION SURVEYS 5-1.27 RECORDS 5-1.27A General 5-1.27B Record Retention 5-1.27C Record Inspection, Copying, and Auditing |
53 | 5-1.27D Cost Accounting Records 5-1.27E Change Order Bills 5-1.28–5-1.29 RESERVED 5-1.30 NONCOMPLIANT AND UNAUTHORIZED WORK |
54 | 5-1.31 JOB SITE APPEARANCE 5-1.32 AREAS FOR USE 5-1.33 EQUIPMENT 5-1.34–5-1.35 RESERVED 5-1.36 PROPERTY AND FACILITY PRESERVATION 5-1.36A General |
55 | 5-1.36B Landscape 5-1.36C Railroad Property 5-1.36D Nonhighway Facilities |
56 | 5-1.36E Survey Monuments 5-1.37 MAINTENANCE AND PROTECTION 5-1.37A General 5-1.37B Load Limits 5-1.37B(1) General |
57 | 5-1.37B(2) Increased Load Carrying Capacity |
58 | 5-1.37B(3) Material Hauling Equipment Lane on Bridges 5-1.38 MAINTENANCE AND PROTECTION RELIEF 5-1.39 DAMAGE REPAIR AND RESTORATION 5-1.39A General 5-1.39B Damage Caused by an Act of God |
59 | 5-1.39C Landscape Damage 5-1.39C(1) General 5-1.39C(2) Plant Establishment Period of 3 Years or More 5-1.40–5-1.41 RESERVED 5-1.42 REQUESTS FOR INFORMATION 5-1.43 POTENTIAL CLAIMS AND DISPUTE RESOLUTION 5-1.43A General |
60 | 5-1.43B Initial Potential Claim Record 5-1.43C Supplemental Potential Claim Record 5-1.43D Full and Final Potential Claim Record |
61 | 5-1.43E Alternative Dispute Resolution 5-1.43E(1) General 5-1.43E(1)(a) General 5-1.43E(1)(b) Establishment of Procedures |
62 | 5-1.43E(1)(c) Dispute Meetings 5-1.43E(1)(d) Informal Dispute Meetings |
63 | 5-1.43E(1)(e) Recommendations 5-1.43E(1)(f) Completion of Alternative Dispute Resolution 5-1.43E(1)(g) Payment |
64 | 5-1.43E(2) Dispute Resolution Advisor 5-1.43E(2)(a) General 5-1.43E(2)(b) DRA Selection 5-1.43E(2)(c) DRA Replacement 5-1.43E(2)(d) DRA Traditional Dispute Meeting |
65 | 5-1.43E(3) Dispute Resolution Board 5-1.43E(3)(a) General 5-1.43E(3)(b) DRB Member Selection |
66 | 5-1.43E(3)(c) DRB Member Replacement 5-1.43E(3)(d) DRB Progress Meetings 5-1.43E(3)(e) DRB Traditional Dispute Meeting |
67 | 5-1.43F Reserved 5-1.44–5-1.45 RESERVED 5-1.46 FINAL INSPECTION AND CONTRACT ACCEPTANCE 5-1.47 GUARANTEE |
68 | 5-1.48–5-1.50 RESERVED |
69 | 6 CONTROL OF MATERIALS 6-1.01 GENERAL 6-1.02 DEPARTMENT-FURNISHED MATERIALS 6-1.03 LOCAL MATERIALS 6-1.04 BUY AMERICA 6-1.04A General 6-1.04B Crumb Rubber (Pub Res Code § 42703(d)) 6-1.04C Steel and Iron Materials |
70 | 6-1.05 SPECIFIC BRAND OR TRADE NAME AND SUBSTITUTION 6-2.01 GENERAL 6-2.01A General 6-2.01B Authorized Facility Audit Lists |
71 | 6-2.01C Authorized Material Lists 6-2.01D Authorized Material Source Lists 6-2.01E Material Source Inspection and Testing |
72 | 6-2.01F Test Samples 6-2.01G–6-2.01K Reserved 6-2.02 QUALITY CONTROL 6-2.02A General |
73 | 6-2.02B Quality Control Program 6-2.02C Quality Control Manager 6-2.02D Quality Control Plans 6-2.03 DEPARTMENT ACCEPTANCE 6-2.03A General |
74 | 6-2.03B Job Site Inspection and Testing 6-2.03C Certificates of Compliance |
75 | 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC 7-1.01 GENERAL 7-1.02 LAWS 7-1.02A General 7-1.02B US Fair Labor Standards Act 7-1.02C Emissions Reduction 7-1.02D–7-1.02H Reserved 7-1.02I Government Code 7-1.02I(1) General 7-1.02I(2) Nondiscrimination |
77 | 7-1.02J Reserved 7-1.02K Labor Code 7-1.02K(1) General 7-1.02K(2) Wages |
78 | 7-1.02K(3) Certified Payroll Records (Labor Code § 1776) |
80 | 7-1.02K(4) Apprentices 7-1.02K(5) Working Hours |
81 | 7-1.02K(6) Occupational Safety and Health Standards 7-1.02K(6)(a) General 7-1.02K(6)(b) Excavation Safety 7-1.02K(6)(c) Tunnel Safety |
82 | 7-1.02K(6)(d) Confined Space Safety 7-1.02K(6)(e) Scaffolding 7-1.02K(6)(f)–7-1.02K(6)(i) Reserved 7-1.02K(6)(j) Lead Safety 7-1.02K(6)(j)(i) General 7-1.02K(6)(j)(ii) Lead Compliance Plan 7-1.02K(6)(j)(iii) Earth Material Containing Lead 7-1.02K(6)(j)(iv–viii) Reserved 7-1.02K(6)(k)–7-1.02K(6)(t) Reserved 7-1.02L Public Contract Code 7-1.02L(1) General 7-1.02L(2) Antitrust Claims |
83 | 7-1.02M Public Resources Code 7-1.02M(1) General 7-1.02M(2) Fire Protection 7-1.02M(3) Surface Mining and Reclamation Act 7-1.02M(4)–7-1.02M(7) Reserved 7-1.02N Reserved 7-1.02O Vehicle Code 7-1.02P–7-1.02Z Reserved 7-1.03 PUBLIC CONVENIENCE |
84 | 7-1.04 PUBLIC SAFETY |
86 | 7-1.05 INDEMNIFICATION 7-1.05A General 7-1.05B Responsibility to Other Entities |
87 | 7-1.06 INSURANCE 7-1.06A General 7-1.06B Casualty Insurance 7-1.06C Workers’ Compensation and Employer’s Liability Insurance 7-1.06D Liability Insurance 7-1.06D(1) General 7-1.06D(2) Liability Limits/Additional Insureds |
88 | 7-1.06D(3) Contractor’s Insurance Policy is Primary 7-1.06E Automobile Liability Insurance 7-1.06F Policy Forms, Endorsements, and Certificates 7-1.06G Deductibles |
89 | 7-1.06H Enforcement 7-1.06I Self-Insurance 7-1.07 LEGAL ACTIONS AGAINST THE DEPARTMENT 7-1.07A General 7-1.07B Seal Coat Claims |
90 | 7-1.08 PERSONAL LIABILITY 7-1.09–7-1.10 RESERVED 7-1.11 FEDERAL LAWS FOR FEDERAL-AID CONTRACTS 7-1.11A General |
91 | 7-1.11B FHWA-1273 |
102 | 7-1.11C Female and Minority Goals |
104 | 7-1.11D Training |
107 | 8 PROSECUTION AND PROGRESS 8-1.01 GENERAL 8-1.02 SCHEDULE 8-1.02A General 8-1.02B Level 1 Critical Path Method Schedule 8-1.02B(1) General 8-1.02B(2) Schedule Format 8-1.02B(3) Updated Schedule |
108 | 8-1.02C Level 2 Critical Path Method Schedule 8-1.02C(1) General 8-1.02C(2) Schedule Format 8-1.02C(3) Computer Software 8-1.02C(3)(a) General |
109 | 8-1.02C(3)(b) Reserved 8-1.02C(4) Data and Network Diagrams 8-1.02C(5) Baseline Schedule 8-1.02C(6) Updated Schedule 8-1.02C(7) Final Updated Schedule |
110 | 8-1.02D Level 3 Critical Path Method Schedule 8-1.02D(1) General 8-1.02D(2) Schedule Format 8-1.02D(3) Computer Software 8-1.02D(4) Data, Network Diagrams, and Reports |
111 | 8-1.02D(5) Preconstruction Scheduling Conference 8-1.02D(6) Baseline Schedule 8-1.02D(7) Updated Schedule |
112 | 8-1.02D(8) Time Impact Analysis 8-1.02D(8)(a) General 8-1.02D(8)(b) Department-Owned Float 8-1.02D(8)(c) Ordered Changes |
113 | 8-1.02D(9) Final Updated Schedule 8-1.02D(10) Payment 8-1.02E–8-1.02F Reserved 8-1.03 PRECONSTRUCTION CONFERENCE |
114 | 8-1.04 START OF JOB SITE ACTIVITIES 8-1.04A General 8-1.04B Standard Start 8-1.04C Delayed Start 8-1.04D Early Return-Early Start 8-1.04E Next-Day Start 8-1.04F Flexible Start 8-1.04G Potential Budget Impasse Start 8-1.04H–8-1.04J Reserved 8-1.05 TIME |
115 | 8-1.06 SUSPENSIONS 8-1.07 DELAYS 8-1.07A General 8-1.07B Time Adjustments 8-1.07C Payment Adjustments |
116 | 8-1.08–8-1.09 RESERVED 8-1.10 LIQUIDATED DAMAGES 8-1.10A General 8-1.10B Failure to Complete Work Parts within Specified Times 8-1.10C Failure to Complete Work Parts by Specified Dates 8-1.10D Reserved 8-1.11–8-1.12 RESERVED 8-1.13 CONTRACTOR’S CONTROL TERMINATION |
117 | 8-1.14 CONTRACT TERMINATION 8-1.14A General 8-1.14B Relief from Responsibility for Work 8-1.14C Responsibility for Materials 8-1.14D Contract Acceptance after Termination 8-1.14E Payment Adjustment for Termination |
118 | 8-1.15–8-1.16 RESERVED |
119 | 9 PAYMENT 9-1.01 GENERAL 9-1.02 MEASUREMENT 9-1.02A General 9-1.02B Weighing Equipment and Procedures 9-1.02B(1) General 9-1.02B(2) Equipment |
120 | 9-1.02B(3) Procedures 9-1.02C Final Pay Item Quantities 9-1.02D Quantities of Aggregate and Other Roadway Materials 9-1.03 PAYMENT SCOPE |
122 | 9-1.04 FORCE ACCOUNT 9-1.04A General 9-1.04B Labor |
123 | 9-1.04C Materials 9-1.04D Equipment Rental 9-1.04D(1) General |
124 | 9-1.04D(2) Equipment On the Job Site 9-1.04D(3) Equipment Not On the Job Site and Not Required for Original-Contract Work |
125 | 9-1.04D(4) Equipment Not On the Job Site and Required for Original-Contract Work 9-1.04D(5) Non-Owner-Operated Dump Truck Rental 9-1.05 EXTRA WORK PERFORMED BY SPECIALISTS 9-1.06 CHANGED QUANTITY PAYMENT ADJUSTMENTS 9-1.06A General 9-1.06B Increases of More Than 25 Percent 9-1.06C Decreases of More Than 25 Percent |
126 | 9-1.06D Eliminated Items 9-1.07 PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS 9-1.07A General |
127 | 9-1.07B Asphalt Quantities 9-1.07B(1) General 9-1.07B(2) Hot Mix Asphalt 9-1.07B(3) Rubberized Hot Mix Asphalt 9-1.07B(4) Hot Mix Asphalt with Modified Asphalt Binder 9-1.07B(5) Hot Mix Asphalt Containing Reclaimed Asphalt Pavement 9-1.07B(6) Tack Coat |
128 | 9-1.07B(7) Asphaltic Emulsion 9-1.07B(8) Slurry Seal 9-1.07B(9) Modified Asphalt Binder 9-1.07B(10) Other Materials 9-1.07C Payment Adjustments |
129 | 9-1.08–9-1.10 RESERVED 9-1.11 TIME-RELATED OVERHEAD 9-1.11A General 9-1.11B Payment Quantity 9-1.11C Payment Inclusions |
130 | 9-1.11D Payment Schedule 9-1.11E Payment Adjustments |
131 | 9-1.12–9-1.14 RESERVED 9-1.15 WORK-CHARACTER CHANGES 9-1.16 PROGRESS PAYMENTS 9-1.16A General 9-1.16B Schedule of Values 9-1.16C Materials On Hand 9-1.16D Mobilization 9-1.16D(1) General |
132 | 9-1.16D(2) Mobilization for Projects Except for Those Over Water Requiring Marine Access 9-1.16D(3) Mobilization for Projects Over Water Requiring Marine Access 9-1.16E Withholds 9-1.16E(1) General 9-1.16E(2) Progress Withholds 9-1.16E(3) Performance Failure Withholds |
133 | 9-1.16E(4) Stop Notice Withholds 9-1.16E(5) Penalty Withholds 9-1.16E(6)–9-1.16E(10) Reserved 9-1.16F Retentions 9-1.16G–9-1.16M Reserved 9-1.17 PAYMENT AFTER CONTRACT ACCEPTANCE 9-1.17A General 9-1.17B Payment Before Final Estimate 9-1.17C Proposed Final Estimate |
134 | 9-1.17D Final Payment and Claims 9-1.17D(1) General 9-1.17D(2) Claim Statement 9-1.17D(2)(a) General 9-1.17D(2)(b) Overhead Claims |
135 | 9-1.17D(2)(c) Declaration 9-1.17D(2)(d) Waiver |
136 | 9-1.17D(3) Final Determination of Claims 9-1.18–9-1.20 RESERVED 9-1.21 CLERICAL ERRORS 9-1.22 ARBITRATION |
137 | DIVISION II GENERAL CONSTRUCTION 10 GENERAL 10-1.01 GENERAL 10-1.02 WORK SEQUENCING 10-1.02A General 10-1.02B Traffic Elements 10-1.02C Landscaping and Irrigation Facilities 10-1.02C(1) General 10-1.02C(2) Irrigation Facilities 10-1.02C(3) Landscaping 10-1.02D Traffic Stripes, Pavement Markings, and Pavement Markers 10-1.02E Excavation 10-1.03 TIME CONSTRAINTS |
138 | 10-1.04 TRAINING AND MEETINGS 10-1.05–10-1.10 RESERVED |
139 | 11 WELDING 11-1.01 GENERAL 11-1.02 DEFINITIONS 11-1.03 QUALITY CONTROL INSPECTOR 11-1.04 PERSONNEL QUALIFICATIONS AND CERTIFICATIONS |
140 | 11-1.05 WELD JOINT DETAILS 11-1.06 NONDESTRUCTIVE TESTING |
141 | 11-2.01 GENERAL 11-2.02 WELDING QUALITY CONTROL MANAGER 11-2.03 SUBMITTALS 11-2.03A General 11-2.03B Welding Quality Control Plan 11-2.03C Welding Report |
142 | 11-2.03D Certificates of Compliance 11-2.04 PERSONNEL QUALIFICATIONS AND CERTIFICATIONS |
143 | 11-2.05 WELDING INSPECTION 11-2.06 WELDING PROCEDURES QUALIFICATION 11-2.07 REPAIR WORK |
144 | 11-3.01 GENERAL 11-3.02 WELDING INSPECTION 11-3.03 SUBMITTALS |
145 | 12 TEMPORARY TRAFFIC CONTROL 12-1.01 GENERAL 12-1.02 MATERIALS 12-1.03 CONSTRUCTION 12-1.04 PAYMENT 12-3.01 GENERAL 12-3.01A General 12-3.01A(1) Summary 12-3.01A(2) Definitions |
146 | 12-3.01A(3) Submittals 12-3.01A(4) Quality Assurance 12-3.01B Materials |
147 | 12-3.01C Construction 12-3.01D Payment 12-3.02 TRAFFIC CONES 12-3.02A General 12-3.02B Materials 12-3.02C Construction 12-3.02D Payment |
148 | 12-3.03 PLASTIC TRAFFIC DRUMS 12-3.03A General 12-3.03A(1) Summary 12-3.03A(2) Definitions 12-3.03A(3) Submittals 12-3.03A(4) Quality Assurance 12-3.03B Materials 12-3.03C Construction 12-3.03D Payment 12-3.04 PORTABLE DELINEATORS 12-3.04A General 12-3.04B Materials |
149 | 12-3.04C Construction 12-3.04D Payment 12-3.05 CHANNELIZERS 12-3.05A General 12-3.05B Materials 12-3.05C Construction 12-3.05D Payment 12-3.06–12-3.09 RESERVED 12-3.10 BARRICADES 12-3.10A General 12-3.10B Materials 12-3.10C Construction |
150 | 12-3.10D Payment 12-3.11 CONSTRUCTION AREA SIGNS 12-3.11A General 12-3.11A(1) Summary 12-3.11A(2) Definitions 12-3.11A(3) Submittals 12-3.11A(4) Quality Assurance 12-3.11B Materials 12-3.11B(1) General 12-3.11B(2) Stationary-Mounted Signs 12-3.11B(3) Portable Signs |
151 | 12-3.11B(4) Temporary Object Markers 12-3.11B(5) General Information Signs 12-3.11C Construction 12-3.11C(1) General 12-3.11C(2) Stationary-Mounted Signs |
152 | 12-3.11C(3) General Information Signs 12-3.11D Payment 12-3.12 TELESCOPING FLAG TREES 12-3.12A General 12-3.12B Materials 12-3.12C Construction 12-3.12D Payment 12-3.13–12-3.19 RESERVED 12-3.20 TYPE K TEMPORARY RAILING 12-3.20A General 12-3.20A(1) Summary 12-3.20A(2) Definitions 12-3.20A(3) Submittals 12-3.20A(4) Quality Assurance |
153 | 12-3.20B Materials 12-3.20B(1) General 12-3.20B(2) Type K Temporary Terminal Section 12-3.20C Construction 12-3.20C(1) General |
154 | 12-3.20C(2) Type K Temporary Terminal Section 12-3.20D Payment 12-3.21 TEMPORARY TRAFFIC SCREENS 12-3.21A General 12-3.21B Materials 12-3.21C Construction 12-3.21D Payment 12-3.22 TEMPORARY CRASH CUSHION MODULES 12-3.22A General 12-3.22B Materials 12-3.22C Construction |
155 | 12-3.22D Payment 12-3.23 IMPACT ATTENUATOR VEHICLES 12-3.23A General 12-3.23A(1) Summary 12-3.23A(2) Definitions 12-3.23A(3) Submittals 12-3.23A(4) Quality Assurance 12-3.23B Materials |
156 | 12-3.23C Construction 12-3.23D Payment 12-3.24–12-3.29 RESERVED 12-3.30 FLASHING ARROW SIGNS 12-3.30A General 12-3.30B Materials |
157 | 12-3.30C Construction 12-3.30D Payment 12-3.31 PORTABLE FLASHING BEACONS 12-3.31A General |
158 | 12-3.31B Materials 12-3.31C Construction 12-3.31D Payment 12-3.32 PORTABLE CHANGEABLE MESSAGE SIGNS 12-3.32A General 12-3.32A(1) Summary 12-3.32A(2) Definitions 12-3.32A(3) Submittals |
159 | 12-3.32A(4) Quality Assurance 12-3.32B Materials 12-3.32C Construction |
160 | 12-3.32D Payment 12-3.33 TEMPORARY SIGNAL SYSTEMS 12-3.33A General 12-3.33B Materials 12-3.33B(1) General 12-3.33B(2) Generators 12-3.33B(3) Automatic Transfer Switches |
161 | 12-3.33C Construction 12-3.33C(1) General 12-3.33C(2) Commercial Power 12-3.33D Payment 12-3.34 TEMPORARY FLASHING BEACON SYSTEMS 12-3.34A General 12-3.34B Materials 12-3.34B(1) General 12-3.34B(2) Generators 12-3.34B(3) Sign Panels |
162 | 12-3.34C Construction 12-3.34D Payment 12-3.35 AUTOMATED WORK ZONE INFORMATION SYSTEMS 12-3.35A General 12-3.35A(1) Summary 12-3.35A(2) Definitions 12-3.35A(3) Submittals 12-3.35A(4) Quality Assurance 12-3.35B Materials 12-3.35B(1) General 12-3.35B(2) General System Function Requirements |
163 | 12-3.35B(3) Motorist Information Message Requirements 12-3.35B(4) System Communication Requirements 12-3.35B(5) Traffic Data Acquisition Requirements 12-3.35B(6) User Interface |
164 | 12-3.35C Construction 12-3.35D Payment 12-3.36 PORTABLE TRANSVERSE RUMBLE STRIPS 12-3.37–12-3.40 RESERVED 12-4.01 GENERAL 12-4.01A General 12-4.01B Materials 12-4.01C Construction 12-4.01D Payment 12-4.02 TRAFFIC CONTROL SYSTEMS 12-4.02A General 12-4.02A(1) Summary 12-4.02A(2) Definitions |
165 | 12-4.02A(3) Submittals 12-4.02A(3)(a) General 12-4.02A(3)(b) Closure Schedules 12-4.02A(3)(c) Contingency Plans for Closures 12-4.02A(4) Quality Assurance |
166 | 12-4.02B Materials 12-4.02C Construction 12-4.02C(1) General 12-4.02C(2) Lane Closure System Training 12-4.02C(3) Closure Requirements and Charts 12-4.02C(3)(a) General 12-4.02C(3)(b) Complete Freeway or Expressway Closure Requirements |
167 | 12-4.02C(3)(c) HOV, Express, and Bus Lane Closure Requirements 12-4.02C(3)(d) City Street Closure Requirements 12-4.02C(3)(e) Closure Restrictions for Special Events and Venues 12-4.02C(3)(f) Closure Restrictions for Designated Holidays and Special Days 12-4.02C(3)(g) Freeway or Expressway Lane Requirement Charts 12-4.02C(3)(h) Complete Freeway or Expressway Closure Hour Charts 12-4.02C(3)(i) Complete Connector Closure Hour Charts and Connector Lane Requirement Charts 12-4.02C(3)(j) Complete Ramp Closure Hour Charts and Ramp Lane Requirement Charts 12-4.02C(3)(k) Conventional Highway Lane Requirement Charts 12-4.02C(3)(l) Complete Conventional Highway Closure Hour Charts 12-4.02C(3)(m) City Street Closure Hour Charts and City Street Lane Requirement Charts 12-4.02C(3)(n) Concrete Slab and Approach Slab Replacement Closure Hours Table 12-4.02C(3)(o)–12-4.02C(3)(s) Reserved 12-4.02C(4)–12.4.02C(6) Reserved 12-4.02C(7) Traffic Control System Requirements 12-4.02C(7)(a) General 12-4.02C(7)(b) Stationary Closures |
168 | 12-4.02C(7)(c) Moving Closures 12-4.02C(8) Traffic Control System Signs 12-4.02C(8)(a) General 12-4.02C(8)(b) Connector and Ramp Closure Signs 12-4.02C(9)–12-4.02C(12) Reserved 12-4.02D Payment 12-4.03 FALSEWORK OPENINGS 12-4.04 PEDESTRIAN FACILITIES 12-4.04A General 12-4.04B Materials 12-4.04C Construction 12-4.04D Payment |
169 | 12-4.05 BRIDGE CLEANING AND PAINTING ACTIVITIES 12-4.05A General 12-4.05B Materials 12-4.05C Construction 12-4.05D Payment 12-4.06 TOLL BRIDGES 12-4.07–12-4.10 RESERVED 12-6.01 GENERAL 12-6.02 MATERIALS 12-6.02A General |
170 | 12-6.02B Temporary Pavement Markers 12-6.02C Channelizers 12-6.03 CONSTRUCTION 12-6.03A General 12-6.03B Temporary Lane Line and Centerline Delineation |
171 | 12-6.03C Temporary Edge Line Delineation 12-6.03D Temporary Traffic Stripe, Pavement Marking, and Pavement Markers 12-6.03D(1) General 12-6.03D(2) Temporary Traffic Stripe Tape 12-6.03D(3) Temporary Traffic Stripe Paint 12-6.03D(4) Temporary Pavement Marking Tape 12-6.03D(5) Temporary Pavement Marking Paint |
172 | 12-6.03D(6) Temporary Pavement Markers 12-6.04 PAYMENT 12-7.01 GENERAL 12-7.02 MATERIALS 12-7.03 CONSTRUCTION 12-7.04 PAYMENT |
173 | 13 WATER POLLUTION CONTROL 13-1.01 GENERAL 13-1.01A Summary 13-1.01B Definitions 13-1.01C Submittals 13-1.01C(1) General 13-1.01C(2) Training Records |
174 | 13-1.01C(3) Contractor-Support Facilities 13-1.01C(4) Water Quality Monitoring 13-1.01C(4)(a) General 13-1.01C(4)(b) Water Quality Monitor 13-1.01C(4)(c) Water Quality Monitoring Reports 13-1.01C(4)(d) Water Quality Annual Reports |
175 | 13-1.01C(5)–13-1.01C(8) Reserved 13-1.01D Quality Assurance 13-1.01D(1) General 13-1.01D(2) Regulatory Requirements 13-1.01D(3) Training |
176 | 13-1.01D(4) Water Pollution Control Manager 13-1.01D(4)(a) General 13-1.01D(4)(b) Qualifications 13-1.01D(4)(c) Responsibilities |
177 | 13-1.01D(5) Quality Control 13-1.01D(5)(a) General 13-1.01D(5)(b) Water Quality Sampling and Analysis |
178 | 13-1.01D(5)(c) Reserved 13-1.03D(6)–13-1.01D(8) Reserved 13-1.02 MATERIALS 13-1.03 CONSTRUCTION 13-1.03A General 13-1.03B Contractor-Support Facilities |
179 | 13-1.03C Inspections 13-1.03D Deficiencies 13-1.03E–13-1.03H Reserved 13-1.04 PAYMENT 13-2.01 GENERAL 13-2.01A Summary |
180 | 13-2.01B Definitions 13-2.01C Submittals 13-2.01D Quality Assurance 13-2.02 MATERIALS |
181 | 13-2.03 CONSTRUCTION 13-2.04 PAYMENT 13-3.01 GENERAL 13-3.01A Summary 13-3.01B Definitions 13-3.01C Submittals 13-3.01C(1) General |
182 | 13-3.01C(2) Stormwater Pollution Prevention Plan 13-3.01C(2)(a) General |
183 | 13-3.01C(2)(b) Construction Site Monitoring Program 13-3.01C(2)(b)(i) General 13-3.01C(2)(b)(ii) Site Inspection Reports 13-3.01C(2)(b)(iii) Visual Monitoring Reports |
184 | 13-3.01C(2)(b)(iv) Sampling and Analysis Plan |
185 | 13-3.01C(2)(b)(v) Sampling and Analysis Plan for Nonvisible Pollutants 13-3.01C(2)(b)(vi) Sampling and Analysis Reports 13-3.01C(2)(b)(vi)(A) General |
186 | 13-3.01C(2)(b)(vi)(B) Numeric Action Level Exceedance Reports 13-3.01C(2)(b)(vi)(C) Receiving-Water Monitoring Trigger Reports 13-3.01C(2)(b)(vi)(D)–13-3.01C(2)(b)(vi)(F) Reserved 13-3.01C(2)(b)(vii)–13-3.01C(2)(b)(x) Reserved 13-3.01C(3) Rain Event Action Plan |
187 | 13-3.01C(4) Stormwater Annual Report 13-3.01C(5) Annual Certification 13-3.01D Quality Assurance 13-3.01D(1) General 13-3.01D(2) Regulatory Requirements |
188 | 13-3.01D(3) Water Quality 13-3.01D(3)(a) General 13-3.01D(3)(b) Numeric Action Levels 13-3.01D(3)(c) Receiving-Water Monitoring Triggers 13-3.01D(3)(d) Numeric Effluent Limitations |
189 | 13-3.01D(4) Water Quality Control 13-3.01D(5)–13-3.01D(6) Reserved 13-3.02 MATERIALS 13-3.03 CONSTRUCTION 13-3.04 PAYMENT |
190 | 13-4.01 GENERAL 13-4.01A Summary 13-4.01B Definitions 13-4.01C Submittals 13-4.01D Quality Assurance 13-4.02 MATERIALS |
191 | 13-4.03 CONSTRUCTION 13-4.03A General 13-4.03B Spill Prevention and Control 13-4.03B(1) General 13-4.03B(2) Minor Spills 13-4.03B(3) Semisignificant Spills 13-4.03B(4) Significant or Hazardous Spills |
192 | 13-4.03B(5)–13-4.03B(6) Reserved 13-4.03C Material Management 13-4.03C(1) General 13-4.03C(2) Material Storage 13-4.03C(3) Stockpile Management |
193 | 13-4.03C(4)–13-4.03C(6) Reserved 13-4.03D Waste Management 13-4.03D(1) General 13-4.03D(2) Paint Waste 13-4.03D(3) Concrete Waste 13-4.03D(4) Sanitary and Septic Waste 13-4.03D(5) Liquid Waste |
194 | 13-4.03D(6)–13-4.03D(8) Reserved 13-4.03E Nonstormwater Management 13-4.03E(1) General 13-4.03E(2) Illicit Connection and Illegal Discharge Detection and Reporting 13-4.03E(3) Vehicle and Equipment Cleaning 13-4.03E(4) Vehicle and Equipment Fueling and Maintenance |
195 | 13-4.03E(5) Material and Equipment Used Over Water 13-4.03E(6) Structure Removal Over or Adjacent to Water 13-4.03E(7) Paving, Sealing, Saw Cutting, Grooving, and Grinding Activities |
196 | 13-4.03E(8) Thermoplastic Striping and Pavement Markers 13-4.03E(9) Pile Driving 13-4.03E(10) Concrete Curing 13-4.03E(11) Concrete Finishing 13-4.03E(12)–13-4.03E(15) Reserved 13-4.03F Sweeping |
197 | 13-4.03G Dewatering 13-4.03H–13-4.03J Reserved 13-4.04 PAYMENT 13-5.01 GENERAL 13-5.02 MATERIALS 13-5.02A General 13-5.02B Erosion Control Blankets 13-5.02C Mulch 13-5.02D Cementitious Binder |
198 | 13-5.02E Soil Binder 13-5.02F Temporary Covers 13-5.02G Gravel-Filled Bags 13-5.02H–13-5.02J Reserved 13-5.03 CONSTRUCTION 13-5.03A General 13-5.03B Temporary Erosion Control Blankets 13-5.03C Temporary Mulch 13-5.03D Temporary Hydraulic Mulch |
199 | 13-5.03E Temporary Bonded Fiber Matrix Hydraulic Mulch 13-5.03F Reserved 13-5.03G Temporary Cementitious Binder Hydraulic Mulch 13-5.03H Temporary Tacked Straw 13-5.03I Temporary Hydroseed 13-5.03J Temporary Soil Binder 13-5.03K Temporary Covers |
200 | 13-5.03L–13-5.03N Reserved 13-5.04 PAYMENT 13-6.01 GENERAL 13-6.02 MATERIALS 13-6.02A General 13-6.02B Rigid Plastic Barriers |
201 | 13-6.02C Sediment Filter Bags 13-6.02D–13-6.02F Reserved 13-6.03 CONSTRUCTION 13-6.03A General |
202 | 13-6.03B Temporary Check Dams 13-6.03C Temporary Drainage Inlet Protection |
203 | 13-6.03D Reserved 13-6.03E Temporary Fiber Rolls 13-6.03F Temporary Gravel Bag Berms 13-6.03F Rigid Plastic Barriers 13-6.03G–13-6.03J Reserved 13-6.04 PAYMENT 13-7.01 GENERAL 13-7.01A General 13-7.01B Materials 13-7.01C Construction 13-7.01D Payment 13-7.02 STREET SWEEPING 13-7.02A General 13-7.02A(1) Summary 13-7.02A(2) Definitions 13-7.02A(3) Submittals |
204 | 13-7.02A(4) Quality Assurance 13-7.02B Materials 13-7.02C Construction 13-7.02D Payment 13-7.03 TEMPORARY CONSTRUCTION ROADWAYS AND ENTRANCES 13-7.03A General 13-7.03A(1) Summary 13-7.03A(2) Definitions 13-7.03A(3) Submittals 13-7.03A(4) Quality Assurance 13-7.03B Materials 13-7.03B(1) General 13-7.03B(2) Rock |
205 | 13-7.03B(3) Corrugated Steel Panels 13-7.03C Construction 13-7.03D Payment 13-8.01 GENERAL 13-8.01A Summary |
206 | 13-8.01B Definitions 13-8.01C Submittals 13-8.01C(1) General 13-8.01C(2) Active Treatment System Plan |
207 | 13-8.01C(3) Inspection Reports 13-8.01C(4) Notice of Discharge Reports 13-8.01C(5) Numeric Effluent Limitation Violation Reports 13-8.01C(6)–13-8.01C(8) Reserved 13-8.01D Quality Assurance 13-8.01D(1) General 13-8.01D(2) Regulatory Requirements |
208 | 13-8.01D(3) Training 13-8.01D(4) Equipment Calibration 13-8.01D(5) Quality Control |
209 | 13-8.02 MATERIALS 13-8.02A General |
210 | 13-8.02B Treatment System 13-8.02C Collection and Conveyance System 13-8.02D Monitoring Equipment 13-8.03 CONSTRUCTION 13-8.03A General 13-8.03B Monitoring 13-8.03B(1) General |
211 | 13-8.03B(2) Corrective Measures 13-8.04 PAYMENT 13-9.01 GENERAL 13-9.01A Summary 13-9.01B Definitions 13-9.01C Submittals 13-9.01D Quality Assurance 13-9.02 MATERIALS 13-9.02A General 13-9.02B Temporary Concrete Washout Facilities |
212 | 13-9.02C Portable Temporary Concrete Washouts 13-9.02D Temporary Concrete Washout Bins 13-9.02E–13-9.02G Reserved 13-9.03 CONSTRUCTION 13-9.04 PAYMENT 13-10.01 GENERAL 13-10.01A Summary |
213 | 13-10.01B Definitions 13-10.01C Submittals 13-10.01D Quality Assurance 13-10.02 MATERIALS 13-10.02A General 13-10.02B Fiber Rolls 13-10.02C Posts 13-10.02D High-Visibility Fabric 13-10.02E Wire Mesh 13-10.02F Wire 13-10.02G Anchors 13-10.02H Straw Bales |
214 | 13-10.02I Foam Barriers 13-10.02J Gravel-filled Bags 13-10.02K–13-10.02M Reserved 13-10.03 CONSTRUCTION 13-10.03A General |
215 | 13-10.03B Temporary Fiber Rolls 13-10.03C Temporary Gravel Bag Berms 13-10.03D Temporary Large Sediment Barriers 13-10.03E Temporary Reinforced Silt Fences 13-10.03F Temporary Silt Fences |
216 | 13-10.03G Temporary Straw Bale Barriers 13-10.03H Temporary Foam Barriers 13-10.03I Temporary Earthen Berms 13-10.03J–13-10.03L Reserved 13-10.04 PAYMENT |
217 | 14 ENVIRONMENTAL STEWARDSHIP 14-1.01 GENERAL 14-1.02 ENVIRONMENTALLY SENSITIVE AREA 14-1.03–14.1.06 RESERVED 14-2.01 GENERAL 14-2.02 DEFINITIONS 14-2.03 ARCHAEOLOGICAL RESOURCES 14-2.03A General 14-2.03B Archaeological Monitoring Area |
218 | 14-2.04 HISTORIC STRUCTURES 14-2.05–14-2.10 RESERVED 14-6.01 GENERAL 14-6.02 DEFINITIONS |
219 | 14-6.03 SPECIES PROTECTION 14-6.03A General 14-6.03B Bird Protection 14-6.03C Fish Protection |
220 | 14-6.03D Contractor-Supplied Biologist 14-6.03D(1) General 14-6.03D(2) Natural Resource Protection Plan |
221 | 14-6.03D(3) Biological Resource Information Program 14-6.04 WETLAND PROTECTION 14-6.05–14-6.10 RESERVED 14-7.01 GENERAL 14-7.02 DEFINITIONS 14-7.03 DISCOVERY OF UNANTICIPATED PALEONTOLOGICAL RESOURCES 14-7.04 PALEONTOLOGICAL RESOURCES MITIGATION 14-7.05–14.7.08 RESERVED 14-8.01 GENERAL 14-8.02 NOISE CONTROL 14-8.03–14.8.06 RESERVED 14-9.01 GENERAL |
222 | 14-9.02 AIR POLLUTION CONTROL 14-9.03 AIR MONITORING 14-9.04–14-9.10 RESERVED 14-10.01 GENERAL 14-10.02 SOLID WASTE DISPOSAL AND RECYCLING REPORT |
223 | 14-10.03–14-10.05 RESERVED 14-11.01 GENERAL 14-11.02 DISCOVERY OF UNANTICIPATED ASBESTOS AND HAZARDOUS SUBSTANCES 14-11.03 HAZARDOUS WASTE MANAGEMENT |
224 | 14-11.04 DUST CONTROL 14-11.05 STOCKPILING 14-11.05A General 14-11.05B Liner 14-11.06 CONTRACTOR-GENERATED HAZARDOUS WASTE 14-11.06A General |
225 | 14-11.06B Contractor-Generated Contaminated Soil 14-11.07 DEPARTMENT-GENERATED HAZARDOUS WASTE 14-11.07A General 14-11.07B Storage of Department-Generated Hazardous Waste 14-11.07C Transport and Disposal of Department-Generated Hazardous Waste |
226 | 14-11.08 MATERIAL CONTAINING HAZARDOUS WASTE CONCENTRATIONS OF AERIALLY DEPOSITED LEAD 14-11.08A General 14-11.08B Definitions |
227 | 14-11.08C Site Conditions 14-11.08D Submittals 14-11.08D(1) General 14-11.08D(2) Excavation and Transportation Plan 14-11.08D(3) Burial Location Report 14-11.08D(4) Bill of Lading 14-11.08E Dust Control 14-11.08F Air Monitoring 14-11.08G Material Management 14-11.08H Surveying Type Y-1 or Y-2 Material Burial Locations |
228 | 14-11.08I Material Transportation 14-11.08J Disposal 14-11.09 MINIMAL DISTURBANCE OF MATERIAL CONTAINING HAZARDOUS WASTE CONCENTRATIONS OF AERIALLY DEPOSITED LEAD 14-11.09A General 14-11.09B Material Management 14-11.10 NATURALLY OCCURRING ASBESTOS 14-11.11 DEPARTMENT-GENERATED CONTAMINATED SOIL |
229 | 14-11.12 REMOVAL OF YELLOW TRAFFIC STRIPE AND PAVEMENT MARKING WITH HAZARDOUS WASTE RESIDUE 14-11.12A General 14-11.12B Submittals 14-11.12B(1) General 14-11.12B(2) Work Plan 14-11.12B(3) Analytical Test Results |
230 | 14-11.12B(4) Disposal Documentation 14-11.12C Removal 14-11.12D Sampling and Testing of Residue 14-11.12E Transport and Disposal of Residue 14-11.13 DISTURBANCE OF EXISTING PAINT SYSTEMS ON BRIDGES 14-11.13A General |
231 | 14-11.13B Submittals 14-11.13B(1) General 14-11.13B(2) Debris Containment and Collection Plan 14-11.13B(3) Air Monitoring Reports 14-11.13B(4) Soil Sampling Results for Debris Containment Verification 14-11.13B(5) Waste Characterization Test Results 14-11.13B(6) Disposal Documentation |
232 | 14-11.13C Safety and Health Protection Measures 14-11.13D Work Area Monitoring 14-11.13E Debris Storage 14-11.13F Debris Waste Characterization 14-11.13G Debris Transport and Disposal 14-11.13G(1) General 14-11.13G(2) Hazardous Waste Debris 14-11.13G(3) Nonhazardous Waste Debris |
233 | 14-11.14 TREATED WOOD WASTE 14-11.14A General 14-11.14B Submittals 14-11.14C Training 14-11.14D Storage of Treated Wood Waste |
234 | 14-11.14E Transport and Disposal of Treated Wood Waste 14-11.15 DISPOSAL OF ELECTRICAL EQUIPMENT REQUIRING SPECIAL HANDLING 14-11.16–14-11.20 RESERVED 14-12.01 GENERAL 14-12.02 STATE PARKS 14-12.03 STATE RECLAMATION BOARD |
235 | 14-12.04–14.12.08 RESERVED |
237 | 15 EXISTING FACILITIES 15-1.01 GENERAL 15-1.02 MATERIALS 15-1.03 CONSTRUCTION 15-1.03A General 15-1.03B Removing Concrete |
238 | 15-1.03C Salvaging Facilities 15-1.03D–15-1.03K Reserved 15-1.04 PAYMENT |
239 | 16 TEMPORARY FACILITIES 16-1.01 GENERAL 16-1.02 MATERIALS 16-1.03 CONSTRUCTION 16-1.04 PAYMENT 16-2.01 GENERAL 16-2.01A General 16-2.01B Materials 16-2.01C Construction 16-2.01D Payment 16-2.02 TEMPORARY PEDESTRIAN FACILITIES 16-2.02A General 16-2.02A(1) Summary 16-2.02A(2) Definitions 16-2.02A(3) Submittals |
240 | 16-2.02A(4) Quality Assurance 16-2.02B Materials 16-2.02B(1) General 16-2.02B(2) Design Requirements 16-2.02C Construction 16-2.02D Payment 16-2.03 HIGH-VISIBILITY FENCES 16-2.03A General 16-2.03A(1) Summary 16-2.03A(2) Definitions 16-2.03A(3) Submittals 16-2.03A(4) Quality Assurance 16-2.03B Materials |
241 | 16-2.03C Construction 16-2.03D Payment 16-2.04 TEMPORARY CONSTRUCTION MATS 16-2.04A General 16-2.04A(1) General 16-2.04A(1)(a) Summary 16-2.04A(1)(b) Definitions 16-2.04A(1)(c) Submittals 16-2.04A(1)(d) Quality Assurance 16-2.04A(2) Materials |
242 | 16-2.04A(3) Construction 16-2.04A(4) Payment 16-2.04B HDPE Mats 16-2.04B(1) General 16-2.04B(2) Materials 16-2.04B(3) Construction 16-2.04B(4) Payment 16-2.04C–16-2.04G Reserved 16-2.05 JOB SITE WATER CONTROL 16-2.05A General 16-2.05A(1) General 16-2.05A(2) Materials 16-2.05A(3) Construction 16-2.05A(4) Payment 16-2.05B Water-Filled Cofferdam 16-2.05C–16-2.05G Reserved |
243 | DIVISION III EARTHWORK AND LANDSCAPE 17 GENERAL 17-1.01 GENERAL 17-1.02 MATERIALS 17-1.03 CONSTRUCTION 17-1.04 PAYMENT 17-2.01 GENERAL 17-2.02 MATERIALS 17-2.03 CONSTRUCTION 17-2.03A General 17-2.03B Clearing |
244 | 17-2.03C Grubbing 17-2.03D Disposal of Materials 17-2.04 PAYMENT |
245 | 18 DUST PALLIATIVES 18-1.01 GENERAL 18-1.01A Summary 18-1.01B Definitions 18-1.01C Submittals 18-1.01D Quality Assurance |
246 | 18-1.02 MATERIALS 18-1.02A General 18-1.02B Dust Suppressants 18-1.02B(1) General |
247 | 18-1.02B(2) Petroleum-Based Organic Products 18-1.02B(3) Nonpetroleum-Based Organic Products |
248 | 18-1.02B(4) Hygroscopic Products |
249 | 18-1.02B(5) Synthetic Polymer Emulsions 18-1.02C Dust Control Binders 18-1.03 CONSTRUCTION 18-1.03A General 18-1.03B Equipment |
250 | 18-1.03C Mixing and Application Rates |
251 | 18-1.04 PAYMENT |
253 | 19 EARTHWORK 19-1.01 GENERAL 19-1.01A Summary 19-1.01B Definitions 19-1.01C Submittals 19-1.01D Quality Assurance 19-1.02 MATERIALS 19-1.03 CONSTRUCTION 19-1.03A General 19-1.03B Unsuitable Material 19-1.03C Grade Tolerance 19-1.03D Buried Man-Made Objects |
254 | 19-1.04 PAYMENT 19-2.01 GENERAL 19-2.01A Summary 19-2.01B Definitions 19-2.01C Submittals 19-2.01D Quality Assurance 19-2.02 MATERIALS 19-2.03 CONSTRUCTION 19-2.03A General 19-2.03B Surplus Material |
255 | 19-2.03C Deficiency Material 19-2.03D Selected Material 19-2.03E Blasting 19-2.03F Slides and Slipouts |
256 | 19-2.03G Slopes 19-2.03H Ditch Excavation 19-2.04 PAYMENT |
257 | 19-3.01 GENERAL 19-3.01A Summary 19-3.01B Definitions 19-3.01C Submittals 19-3.01C(1) General 19-3.01C(2) Cofferdams 19-3.01C(3) Soldier Pile Walls |
258 | 19-3.01C(4) Ground Anchor and Soil Nail Walls 19-3.01C(5) Test Results 19-3.01C(6) Controlled Low-Strength Material 19-3.01D Quality Assurance 19-3.01D(1) General 19-3.01D(2) Stability Test for Ground Anchor and Soil Nail Walls |
259 | 19-3.02 MATERIALS 19-3.02A General 19-3.02B Cofferdam 19-3.02C Structure Backfill |
260 | 19-3.02D Pervious Backfill Material 19-3.02E Slurry Cement Backfill |
261 | 19-3.02F Culvert Beddings 19-3.02F(1) General 19-3.02F(2) Sand Beddings 19-3.02F(3) Soil Cement Beddings 19-3.02G Controlled Low-Strength Material |
262 | 19-3.02H Concrete Backfill 19-3.02I Lean Concrete Backfill 19-3.02J Filter Fabric 19-3.03 CONSTRUCTION 19-3.03A General 19-3.03B Structure Excavation 19-3.03B(1) General 19-3.03B(2) Soldier Pile Walls |
263 | 19-3.03B(3) Pier Column Excavation 19-3.03B(4) Cofferdams 19-3.03B(5) Water Control and Foundation Treatment |
264 | 19-3.03C–19-3.03D Reserved 19-3.03E Structure Backfill 19-3.03E(1) General |
265 | 19-3.03E(2) Crib Walls 19-3.03E(3) Soldier Pile Walls 19-3.03F Slurry Cement Backfill 19-3.03G Pervious Backfill Material 19-3.03H Culvert Bedding |
266 | 19-3.03I Controlled Low-Strength Material 19-3.03J Soldier Pile Walls 19-3.03K Ground Anchor and Soil Nail Walls |
267 | 19-3.04 PAYMENT 19-5.01 GENERAL 19-5.02 MATERIALS |
268 | 19-5.03 CONSTRUCTION 19-5.03A General 19-5.03B Relative Compaction (95 Percent) 19-5.03C Relative Compaction (90 Percent) 19-5.03D Foundation Preparation 19-5.04 PAYMENT 19-6.01 GENERAL 19-6.01A Summary 19-6.01B Definitions |
269 | 19-6.01C Submittals 19-6.01D Quality Assurance 19-6.02 MATERIALS 19-6.02A General 19-6.02B Geosynthetic Reinforced Embankment 19-6.03 CONSTRUCTION 19-6.03A General |
270 | 19-6.03B Subsidence 19-6.03C Placing and Compacting |
271 | 19-6.03D Settlement Periods and Surcharges |
272 | 19-6.03E Geosynthetic Reinforced Embankment |
273 | 19-6.04 PAYMENT 19-7.01 GENERAL 19-7.01A Summary 19-7.01B Definitions 19-7.01C Submittals 19-7.01D Quality Assurance 19-7.02 MATERIALS 19-7.02A General 19-7.02B Local Borrow 19-7.02C Imported Borrow 19-7.03 CONSTRUCTION 19-7.03A General 19-7.03B Local Borrow |
274 | 19-7.03C Imported Borrow 19-7.04 PAYMENT 19-9.01 GENERAL 19-9.02 MATERIALS |
275 | 19-9.03 CONSTRUCTION |
276 | 19-9.04 PAYMENT 19-10.01 GENERAL 19-10.02 MATERIALS 19-10.03 CONSTRUCTION 19-10.03A General |
277 | 19-10.03C Subgrade Enhancement Geotextile 19-10.04 PAYMENT |
279 | 20 LANDSCAPE 20-1.01 GENERAL 20-1.01A Summary 20-1.01B Definitions 20-1.01C Submittals 20-1.01D Quality Assurance 20-1.01D(1) General 20-1.01D(2) Progress Inspections 20-1.02 MATERIALS 20-1.02A General |
280 | 20-1.02B Water 20-1.02C Pesticides 20-1.02D–20-1.02H Reserved 20-1.03 CONSTRUCTION 20-1.03A General 20-1.03B Pesticides |
281 | 20-1.03C Roadside Clearing 20-1.03C(1) General 20-1.03C(2) Remove Existing Plants 20-1.03C(3) Weed Control 20-1.03C(4) Disposal of Removed Groundcover, Weeds, and Mowed Material 20-1.03D Cultivation |
282 | 20-1.03E Weed Germination 20-1.03F–20-1.03K Reserved 20-1.04 PAYMENT 20-2.01 GENERAL 20-2.01A General 20-2.01A(1) Summary 20-2.01A(2) Definitions 20-2.01A(3) Submittals 20-2.01A(3)(a) General 20-2.01A(3)(b) Manufacturer’s Instructions 20-2.01A(4) Quality Assurance 20-2.01A(4)(a) General |
283 | 20-2.01A(4)(b) Pressure Testing 20-2.01A(4)(b)(i) General 20-2.01A(4)(b)(ii) Method A 20-2.01A(4)(b)(iii) Method B 20-2.01A(4)(c) Sprinkler Coverage Check 20-2.01A(4)(d) Irrigation System Functional Tests |
284 | 20-2.01A(4)(e) Final Irrigation System Check 20-2.01B Materials 20-2.01B(1) General 20-2.01B(2) Garden Valves 20-2.01B(3) Recycled Water Identification 20-2.01B(4) Location Markers 20-2.01B(5) Pull Boxes |
285 | 20-2.01B(6) Unions 20-2.01B(7) Valve Boxes and Covers 20-2.01B(8) Wye Strainers 20-2.01C Construction 20-2.01C(1) General 20-2.01C(2) Trenching and Backfilling |
286 | 20-2.01C(3) Pull Boxes 20-2.01C(4) Valve Boxes and Covers 20-2.01C(5) Recycled Water Warning Signs 20-2.01C(6) Garden Valves 20-2.01D Payment 20-2.02 BACKFLOW PREVENTER ASSEMBLIES 20-2.02A General 20-2.02A(1) Summary |
287 | 20-2.02A(2) Definitions 20-2.02A(3) Submittals 20-2.02A(4) Quality Assurance 20-2.02B Materials 20-2.02B(1) General 20-2.02B(2) Backflow Preventers 20-2.02B(3) Backflow Preventer Blankets 20-2.02B(4) Backflow Preventer Enclosures |
288 | 20-2.02C Construction 20-2.02D Payment 20-2.03 CAM COUPLER ASSEMBLIES 20-2.03A General 20-2.03B Materials 20-2.03C Construction 20-2.03D Payment 20-2.04 CONTROL AND NEUTRAL CONDUCTORS 20-2.04A General 20-2.04A(1) Summary 20-2.04A(2) Definitions 20-2.04A(3) Submittals 20-2.04A(4) Quality Assurance 20-2.04B Materials |
289 | 20-2.04C Construction 20-2.04C(1) General 20-2.04C(2) Conductors in Open Trenches 20-2.04C(3) Conductors in Conduits 20-2.04C(4) Splicing |
290 | 20-2.04C(5) Marking 20-2.04D Payment 20-2.05 FLOW SENSORS 20-2.05A General 20-2.05B Materials 20-2.05C Construction 20-2.05D Payment 20-2.06 IRRIGATION CONTROLLERS 20-2.06A General 20-2.06A(1) Summary |
291 | 20-2.06A(2) Definitions 20-2.06A(3) Submittals 20-2.06A(4) Quality Assurance 20-2.06B Materials 20-2.06B(1) General |
292 | 20-2.06B(2) Irrigation Controllers 20-2.06B(2)(a) General 20-2.06B(2)(b) Battery Powered Irrigation Controllers 20-2.06B(2)(c) Solar Powered Irrigation Controllers 20-2.06B(2)(d) Two-wire Irrigation Controllers 20-2.06B(3) Irrigation Controller Enclosure Cabinets |
293 | 20-2.06B(4) Rain Sensors 20-2.06C Construction 20-2.06D Payment 20-2.07 IRRIGATION CONDUIT 20-2.07A General 20-2.07A(1) Summary 20-2.07A(2) Definitions 20-2.07A(3) Submittals |
294 | 20-2.07A(4) Quality Assurance 20-2.07B Materials 20-2.07B(1) General 20-2.07B(2) ABS Composite Pipe Conduit 20-2.07B(3) Corrugated HDPE Pipe Conduit 20-2.07B(4) Corrugated Steel Pipe Conduit 20-2.07B(5) PVC Pipe Conduit 20-2.07B(6) Welded Steel Pipe Conduit 20-2.07C Construction 20-2.07C(1) General |
295 | 20-2.07C(2) Welded Steel Pipe Conduit 20-2.07C(2)(a) General 20-2.07C(2)(b) Directional Boring 20-2.07C(2)(c) Jack and Drill 20-2.07C(3) Schedule 40 PVC Pipe Conduit 20-2.07D Payment |
296 | 20-2.08 IRRIGATION SUPPLY LINE 20-2.08A General 20-2.08A(1) Summary 20-2.08A(2) Definitions 20-2.08A(3) Submittals 20-2.08A(4) Quality Assurance 20-2.08B Materials 20-2.08B(1) General 20-2.08B(2) Copper Pipe Supply Line 20-2.08B(3) Galvanized Steel Pipe Supply Line 20-2.08B(4) Drip Irrigation Tubing 20-2.08B(5) Plastic Pipe Supply Line |
297 | 20-2.08C Construction 20-2.08C(1) General 20-2.08C(2) Galvanized Steel Pipe Supply Line 20-2.08C(3) Drip Irrigation Tubing 20-2.08C(4) Plastic Pipe Supply Line |
298 | 20-2.08D Payment 20-2.09 SPRINKLER ASSEMBLIES 20-2.09A General 20-2.09B Materials 20-2.09B(1) General 20-2.09B(2) Pop-Up Sprinkler Assemblies 20-2.09B(3) Riser Sprinkler Assemblies 20-2.09B(4) Tree Well Sprinkler Assemblies 20-2.09C Construction |
299 | 20-2.09D Payment 20-2.10 VALVES 20-2.10A General 20-2.10B Materials 20-2.10B(1) General 20-2.10B(2) Ball Valves 20-2.10B(3) Check Valves 20-2.10B(4) Drip Valve Assemblies 20-2.10B(5) Garden Valve Assemblies 20-2.10B(6) Gate Valves |
300 | 20-2.10B(7) Pressure Regulating Valves 20-2.10B(8) Pressure Relief Valves 20-2.10B(9) Quick Coupling Valves 20-2.10B(10) Remote Control Valves 20-2.10B(10)(a) General 20-2.10B(10)(b) Remote Control Valves with Flow Sensor 20-2.10B(10)(c) Remote Control Valves with Pressure Regulator 20-2.10C Construction 20-2.10C(1) General |
301 | 20-2.10C(2) Control Valves 20-2.10C(3) Check Valves 20-2.10C(4) Garden Valve Assemblies 20-2.10C(5) Gate Valves 20-2.10C(6) Pressure Regulating Valves 20-2.10C(7) Quick Coupling Valves 20-2.10D Payment 20-2.11 WYE STRAINER ASSEMBLIES 20-2.11A General 20-2.11B Materials 20-2.11C Construction 20-2.11D Payment 20-2.12 RESERVED 20-2.13 SUPPLY LINE ON STRUCTURES 20-2.13A General 20-2.13A(1) General 20-2.13A(1)(a) Summary 20-2.13A(1)(b) Definitions |
302 | 20-2.13A(1)(c) Submittals 20-2.13A(1)(d) Quality Assurance 20-2.13A(1)(d)(i) General 20-2.13A(1)(d)(ii) Regulatory Requirements 20-2.13A(1)(d)(iii) Quality Control 20-2.13A(2) Materials 20-2.13A(2)(a) General 20-2.13A(2)(b) Air Release Valve Assemblies 20-2.13A(2)(c) Casings |
303 | 20-2.13A(2)(d) Pipe Wrap Tape 20-2.13A(2)(e) Pipe Hangers 20-2.13A(2)(f) Epoxy Adhesives 20-2.13A(2)(g) Concrete Pipe Supports 20-2.13A(2)(h) Pipe Clamps and Anchors 20-2.13A(2)(i) Pull Boxes 20-2.13A(3) Construction 20-2.13A(3)(a) General 20-2.13A(3)(b) Preparation 20-2.13A(3)(c) Installation 20-2.13A(3)(c)(i) General 20-2.13A(3)(c)(ii) Casings 20-2.13A(3)(c)(iii) Wrapping Water Supply Line 20-2.13A(3)(c)(iv) Pipe Clamps and Anchors |
304 | 20-2.13A(3)(d) Sequences of Operation 20-2.13A(4) Payment 20-2.13B Supply Line on Structures, Less than 4 Inches 20-2.13B(1) General 20-2.13B(1)(a) Summary 20-2.13B(1)(b) Definitions 20-2.13B(1)(c) Submittals 20-2.13B(1)(d) Quality Assurance 20-2.13B(2) Materials 20-2.13B(2)(a) General 20-2.13B(2)(b) Water Supply Line 20-2.13B(2)(c) Expansion Assemblies |
305 | 20-2.13B(2)(d) Casing Insulators 20-2.13B(2)(e) Pipe Anchorages 20-2.13B(2)(f) Pipe End Seals 20-2.13B(3) Construction 20-2.13B(4) Payment 20-2.13C Supply Line on Structures, 4 Inches and Larger 20-2.13C(1) General 20-2.13C(1)(a) Summary 20-2.13C(1)(b) Definitions 20-2.13C(1)(c) Submittals |
306 | 20-2.13C(1)(d) Quality Assurance 20-2.13C(2) Materials 20-2.13C(2)(a) General 20-2.13C(2)(b) Water Supply Line 20-2.13C(2)(c) Expansion Assemblies 20-2.13C(2)(d) Flange Insulating Gaskets 20-2.13C(2)(e) Casing Insulators |
307 | 20-2.13C(2)(f) Dirt Stops 20-2.13C(2)(g) Seismic Expansion Assemblies 20-2.13C(2)(h) Lateral Restraint Assemblies 20-2.13C(3) Construction 20-2.13C(4) Payment 20-2.14 TEMPORARY IRRIGATION SYSTEMS 20-2.15–20-2.18 RESERVED 20-3.01 GENERAL 20-3.01A General 20-3.01A(1) Summary |
308 | 20-3.01A(2) Definitions 20-3.01A(3) Submittals 20-3.01A(3)(a) General 20-3.01A(3)(b) Vendor Statements 20-3.01A(3)(c) Certificates of Compliance 20-3.01A(4) Quality Assurance 20-3.01B Materials 20-3.01B(1) General 20-3.01B(2) Plants 20-3.01B(2)(a) General |
309 | 20-3.01B(2)(b) Cuttings 20-3.01B(2)(b)(i) General 20-3.01B(2)(b)(ii) Carpobrotus and Delosperma Cuttings 20-3.01B(2)(b)(iii) Willow Cuttings 20-3.01B(2)(b)(iv) Cottonwood Cuttings |
310 | 20-3.01B(2)(b)(v)–20-3.01B(2)(b)(viii) Reserved 20-3.01B(2)(c) Sod 20-3.01B(3) Soil Amendments 20-3.01B(4) Fertilizers 20-3.01B(4)(a) General 20-3.01B(4)(b) Slow-release Fertilizers 20-3.01B(4)(c) Packet Fertilizers 20-3.01B(4)(d) Organic Fertilizers |
311 | 20-3.01B(5) Root Stimulants 20-3.01B(6) Plaster Sand 20-3.01B(7) Root Barrier 20-3.01B(8) Root Protectors 20-3.01B(9) Foliage Protectors 20-3.01B(10) Wood Plant Stakes |
312 | 20-3.01B(11) Plant Ties 20-3.01C Construction 20-3.01C(1) General 20-3.01C(2) Pruning 20-3.01C(3) Watering 20-3.01C(4) Replacement Plants 20-3.01C(5) Maintain Plants 20-3.01D Payment 20-3.02 PLANTING WORK 20-3.02A General 20-3.02B Materials 20-3.02C Construction 20-3.02C(1) General 20-3.02C(2) Preparing Planting Areas |
313 | 20-3.02C(3) Planting Plants 20-3.02C(3)(a) General 20-3.02C(3)(b) Trees, Shrubs, and Vines |
314 | 20-3.02C(3)(c) Groundcover Plants 20-3.02C(3)(d) Cuttings, Liners, Plugs, and Seedling Plants 20-3.02C(3)(d)(i) General 20-3.02C(3)(d)(ii) Willow Cuttings |
315 | 20-3.02C(3)(d)(iii) Cottonwood Cuttings 20-3.02C(3)(d)(iv) Carpobrotus and Delosperma Cuttings 20-3.02C(3)(d)(v) Liner Plants 20-3.02C(3)(d)(vi) Plug Plants 20-3.02C(3)(d)(vii) Seedling Plants 20-3.02C(3)(e) Sod |
316 | 20-3.02D Payment 20-3.03–20-3.07 RESERVED 20-4.01 GENERAL 20-4.01A Summary 20-4.01B Definitions 20-4.01C Submittals 20-4.01C(1) General |
317 | 20-4.01C(2) Notification 20-4.01D Quality Assurance 20-4.02 MATERIALS 20-4.02A General 20-4.02B Fertilizers 20-4.03 CONSTRUCTION 20-4.03A General 20-4.03B Plant Growth Control |
318 | 20-4.03C Fertilizing 20-4.03D Weed Control 20-4.03E Plant Staking 20-4.03F Replacement Plants 20-4.03G Watering 20-4.04 PAYMENT 20-5.01 GENERAL 20-5.01A General |
319 | 20-5.01B Materials 20-5.01C Construction 20-5.01D Payment 20-5.02 EDGING 20-5.02A General 20-5.02B Materials 20-5.02B(1) General 20-5.02B(2) Header Board Edging 20-5.02B(3) Metal Edging 20-5.02B(4) HDPE Edging 20-5.02B(5) Concrete Edging 20-5.02B(6)–20-5.02B(10) Reserved 20-5.02C Construction 20-5.02C(1) General |
320 | 20-5.02C(2) Header Board Edging 20-5.02C(3) Metal and HDPE Edging 20-5.02C(4) Concrete Edging 20-5.02C(5)–20-5.02C(9) Reserved 20-5.02D Payment 20-5.03 INERT GROUND COVERS AND MULCHES 20-5.03A General 20-5.03A(1) General 20-5.03A(1)(a) Summary 20-5.03A(1)(b) Definitions 20-5.03A(1)(c) Submittals 20-5.03A(1)(d) Quality Assurance 20-5.03A(2) Materials 20-5.03A(3) Construction 20-5.03A(3)(a) General 20-5.03A(3)(b) Earthwork 20-5.03A(3)(c) Treatment of Soil |
321 | 20-5.03A(3)(d) Filter Fabric 20-5.03A(4) Payment 20-5.03B Rock Blanket 20-5.03B(1) General 20-5.03B(1)(a) Summary 20-5.03B(1)(b) Definitions 20-5.03B(1)(c) Submittals 20-5.03B(1)(d) Quality Assurance 20-5.03B(2) Materials 20-5.03B(2)(a) General 20-5.03B(2)(b) Concrete 20-5.03B(2)(c) Rock 20-5.03B(2)(d) Mortar 20-5.03B(3) Construction |
322 | 20-5.03B(4) Payment 20-5.03C Gravel Mulch 20-5.03C(1) General 20-5.03C(1)(a) Summary 20-5.03C(1)(b) Definitions 20-5.03C(1)(c) Submittals 20-5.03C(1)(d) Quality Assurance 20-5.03C(2) Materials 20-5.03C(3) Construction 20-5.03C(4) Payment 20-5.03D Decomposed Granite 20-5.03D(1) General 20-5.03D(1)(a) Summary 20-5.03D(1)(b) Definitions 20-5.03D(1)(c) Submittals |
323 | 20-5.03D(1)(d) Quality Assurance 20-5.03D(2) Materials 20-5.03D(2)(a) General 20-5.03D(2)(b) Solidifying Emulsion 20-5.03D(3) Construction |
324 | 20-5.03D(4) Payment 20-5.03E Wood Mulch 20-5.03E(1) General 20-5.03E(1)(a) Summary 20-5.03E(1)(b) Definitions 20-5.03E(1)(c) Submittals 20-5.03E(1)(d) Quality Assurance 20-5.03E(2) Materials 20-5.03E(2)(a) General 20-5.03E(2)(b) Tree Bark Mulch 20-5.03E(2)(c) Wood Chip Mulch 20-5.03E(2)(d) Shredded Bark Mulch 20-5.03E(2)(e) Tree Trimming Mulch |
325 | 20-5.03E(2)(f)–20-5.03E(2)(j) Reserved 20-5.03E(3) Construction 20-5.03E(4) Payment 20-5.03F–20-5.03J Reserved 20-5.04 RESERVED 20-5.05 SITE FURNISHINGS 20-5.05A General 20-5.05B Materials 20-5.05C Construction 20-5.05D Payment 20-5.05E–20-5.05Z Reserved 20-5.06–20-5.10 RESERVED 20-10.01 GENERAL 20-10.01A General 20-10.01B Materials 20-10.01C Construction 20-10.01D Payment |
326 | 20-10.02 EXISTING IRRIGATION FACILITIES 20-10.02A General 20-10.02A(1) Summary 20-10.02A(2) Definitions 20-10.02A(3) Submittals 20-10.02A(4) Quality Assurance 20-10.02B Materials 20-10.02C Construction 20-10.02C(1) General 20-10.02C(2) Check and Test Existing Irrigation Facilities 20-10.02C(3) Operate Existing Irrigation Facilities 20-10.02C(4) Remove Irrigation Facilities |
327 | 20-10.02C(5) Replace Valve Box Covers 20-10.02C(6) Relocate Backflow Preventer Assemblies 20-10.02C(7) Relocate Water Meters 20-10.02C(8) Relocate Irrigation Controllers 20-10.02C(9) Salvage Irrigation Facilities 20-10.02D Payment 20-10.03 EXISTING PLANTING 20-10.03A General 20-10.03A(1) Summary 20-10.03A(2) Definitions 20-10.03A(3) Submittals 20-10.03A(4) Quality Assurance 20-10.03B Materials |
328 | 20-10.03C Construction 20-10.03C(1) General 20-10.03C(2) Prune Existing Plants 20-10.03C(3) Transplant Trees 20-10.03C(4) Maintain Existing Planted Areas 20-10.03D Payment 20-10.04–20-10.08 RESERVED |
329 | 21 EROSION CONTROL 21-1.01 GENERAL 21-1.02 MATERIALS 21-1.03 CONSTRUCTION 21-1.04 PAYMENT 21-2.01 GENERAL 21-2.01A Summary 21-2.01B Definitions 21-2.01C Submittals 21-2.01C(1) General 21-2.01C(2) Compost 21-2.01C(3) Seed |
330 | 21-2.01C(4) Tackifier 21-2.01D Quality Assurance 21-2.01D(1) General 21-2.01D(2) Compost 21-2.01D(3) Seed 21-2.02 MATERIALS 21-2.02A General 21-2.02B Duff 21-2.02C Topsoil 21-2.02C(1) General |
331 | 21-2.02C(2) Local Topsoil 21-2.02C(3) Imported Topsoil 21-2.02D Fiber 21-2.02E Tackifier |
332 | 21-2.02F Seed 21-2.02G Fertilizer 21-2.02H Straw 21-2.02I Reserved 21-2.02J Bonded Fiber Matrix 21-2.02K Compost |
333 | 21-2.02L–21-2.02N Reserved 21-2.02O Rolled Erosion Control Products 21-2.02O(1) General 21-2.02O(2) Jute Mesh |
334 | 21-2.02O(3) Netting 21-2.02O(4) Erosion Control Blankets 21-2.02O(5) Turf Reinforcement Mats |
335 | 21-2.02P Fiber Rolls 21-2.02Q Compost Socks 21-2.02R Fasteners 21-2.02S–21-2.02V Reserved 21-2.03 CONSTRUCTION 21-2.03A General |
336 | 21-2.03B Duff 21-2.03C Topsoil 21-2.03D Hydromulch and Hydroseed |
337 | 21-2.03E Dry Seed 21-2.03F Drill Seed 21-2.03G Straw 21-2.03H Bonded Fiber Matrix 21-2.03I Compost 21-2.03J Incorporate Materials 21-2.03K–21-2.03N Reserved 21-2.03O Rolled Erosion Control Products |
338 | 21-2.03P Fiber Rolls 21-2.03Q Compost Socks 21-2.03R–21-2.03T Reserved 21-2.04 PAYMENT |
341 | 22 FINISHING ROADWAY 22-1.01 GENERAL 22-1.02 MATERIALS 22-1.03 CONSTRUCTION 22-1.04 PAYMENT |
343 | DIVISION IV SUBBASES AND BASES 23 GENERAL 23-1.01 GENERAL 23-1.02 MATERIALS 23-1.03 CONSTRUCTION 23-1.04 PAYMENT |
345 | 24 STABILIZED SOILS 24-1.01 GENERAL 24-1.01A Summary 24-1.01B Definitions 24-1.01C Submittals 24-1.01C(1) General 24-1.01C(2) Samples 24-1.01D Quality Assurance 24-1.01D(1) General 24-1.01D(2) Quality Control 24-1.01D(2)(a) General 24-1.01D(2)(b) Preparing Basement Material 24-1.01D(2)(c) Mixing 24-1.01D(2)(d) Compaction 24-1.01D(3) Department Acceptance |
346 | 24-1.02 MATERIALS 24-1.02A General 24-1.02B Water 24-1.02C Curing Seal 24-1.02D Stabilizing Agent 24-1.03 CONSTRUCTION 24-1.03A General 24-1.03B Preparing Basement Material 24-1.03C Applying Stabilizing Agent 24-1.03D Mixing 24-1.03E Compaction |
347 | 24-1.03F Finish Grading 24-1.03G Curing 24-1.03G(1) General 24-1.03G(2) Water Cure 24-1.03G(3) Curing Seal 24-1.03G(4) Moist Material Blanket 24-1.04 PAYMENT |
348 | 24-2.01 GENERAL 24-2.01A Summary 24-2.01B Definitions 24-2.01C Submittals 24-2.01D Quality Assurance 24-2.01D(1) General 24-2.01D(1)(a) Preparing Basement Material 24-2.01D(1)(b) Applying Lime 24-2.01D(1)(c) Test Result Disputes |
349 | 24-2.01D(2) Quality Control 24-2.01D(2)(a) General 24-2.01D(2)(b) Mixing 24-2.01D(2)(c) Compaction 24-2.02 MATERIALS |
350 | 24-2.03 CONSTRUCTION 24-2.03A General 24-2.03B Preparing Basement Material 24-2.03C Applying Lime 24-2.03D Mixing 24-2.03E Compaction |
351 | 24-2.03F Finish Grading 24-2.03G Curing 24-2.04 PAYMENT |
353 | 25 AGGREGATE SUBBASES 25-1.01 GENERAL 25-1.01A Summary 25-1.01B Definitions 25-1.01C Submittals 25-1.01D Quality Assurance 25-1.01D(1) General 25-1.01D(2) Quality Control 25-1.01D(3) Department Acceptance 25-1.02 MATERIALS 25-1.02A General 25-1.02B Class 1, Class 2, and Class 3 Aggregate Subbases |
354 | 25-1.02C Class 4 Aggregate Subbase 25-1.02D Class 5 Aggregate Subbase 25-1.03 CONSTRUCTION 25-1.03A General 25-1.03B Subgrade 25-1.03C Placing Geosynthetics Materials |
355 | 25-1.03D Spreading 25-1.03E Compacting 25-1.04 PAYMENT |
357 | 26 AGGREGATE BASES 26-1.01 GENERAL 26-1.01A Summary 26-1.01B Definitions 26-1.01C Submittals 26-1.01D Quality Assurance 26-1.01D(1) General 26-1.01D(2) Quality Control 26-1.01D(3) Department Acceptance 26-1.02 MATERIALS 26-1.02A General 26-1.02B Class 2 Aggregate Base |
358 | 26-1.02C Class 3 Aggregate Base 26-1.03 CONSTRUCTION 26-1.03A General 26-1.03B Subgrade |
359 | 26-1.03C Placing Geosynthetic Materials 26-1.03D Spreading 26-1.03E Compacting |
360 | 26-1.04 PAYMENT |
361 | 27 CEMENT TREATED BASES 27-1.01 GENERAL 27-1.01A Summary 27-1.01B Definitions 27-1.01C Submittals 27-1.01D Quality Assurance 27-1.01D(1) General 27-1.01D(2) Aggregate 27-1.01D(3) Road-Mixed Cement Treated Base Moisture Content 27-1.01D(4) Plant-Mixed Cement Treated Base Moisture Content 27-1.02 MATERIALS |
362 | 27-1.03 CONSTRUCTION 27-1.03A General 27-1.03B Subgrade 27-1.03C Depositing Aggregate and Mixing Road-Mixed Cement Treated Base 27-1.03C(1) General 27-1.03C(2) Depositing Aggregate 27-1.03C(3) Mixing |
363 | 27-1.03D Proportioning and Mixing Plant-Mixed Cement Treated Base 27-1.03D(1) General 27-1.03D(2) Batch Mixing |
364 | 27-1.03D(3) Continuous Mixing 27-1.03E Spreading Treated Mixture |
365 | 27-1.03F Compacting |
366 | 27-1.03G Operation Time Requirement 27-1.03H Contact Joints 27-1.03I Curing |
367 | 27-1.04 PAYMENT |
369 | 28 CONCRETE BASES 28-1.01 GENERAL 28-1.01A Summary 28-1.01B Definitions 28-1.01C Submittals 28-1.01D Quality Assurance 28-1.02 MATERIALS 28-1.03 CONSTRUCTION 28-1.03A General 28-1.03B Subgrade Preparation 28-1.03C Placing |
370 | 28-1.04 PAYMENT 28-2.01 GENERAL 28-2.01A Summary 28-2.01B Definitions 28-2.01C Submittals 28-2.01C(1) General 28-2.01C(2) Field Qualification 28-2.01D Quality Assurance 28-2.01D(1) General |
371 | 28-2.01D(2) Qualifications 28-2.01D(3) Aggregate Qualification Testing 28-2.01D(4) Field Qualification Testing 28-2.01D(5) Quality Control |
372 | 28-2.01D(6) Department Acceptance 28-2.02 MATERIALS 28-2.02A General 28-2.02B Cementitious Material 28-2.02C Aggregate |
373 | 28-2.03 CONSTRUCTION 28-2.03A General 28-2.03B Subgrade 28-2.03C Proportioning, Mixing, and Transporting 28-2.03D Placing |
374 | 28-2.03E Finishing 28-2.03F Curing 28-2.03G Surfaces Not Within Tolerance 28-2.04 PAYMENT 28-3.01 GENERAL 28-3.01A Summary |
375 | 28-3.01B Definitions 28-3.01C Submittals 28-3.01C(1) General 28-3.01C(2) Quality Assurance Submittals 28-3.01C(3) Quality Control Plan 28-3.01D Quality Assurance 28-3.01D(1) General |
376 | 28-3.01D(2) Preconstruction Meeting 28-3.01D(3) Test Strip 28-3.01D(4) Quality Control 28-3.01D(4)(a) General 28-3.01D(4)(b) Quality Control Manager 28-3.01D(4)(c) Quality Control Testing 28-3.01D(5) Department Acceptance 28-3.02 MATERIALS 28-3.02A General 28-3.02B Rapid Strength Concrete Base |
377 | 28-3.02C Curing Seal 28-3.03 CONSTRUCTION 28-3.03A General 28-3.03B Subgrade 28-3.03C Placing, Spreading, and Shaping 28-3.03D Curing 28-3.03E Surfaces Not Within Tolerance |
378 | 28-3.04 PAYMENT 28-4.01 GENERAL 28-4.01A Summary 28-4.01B Definitions 28-4.01C Submittals 28-4.01C(1) General 28-4.01C(2) Mix Design 28-4.01C(3) Field Qualification |
379 | 28-4.01D Quality Assurance 28-4.01D(1) General 28-4.01D(2) Field Qualification 28-4.01D(3) Quality Control 28-4.01D(4) Department Acceptance |
380 | 28-4.02 MATERIALS 28-4.02A General 28-4.02B Cement 28-4.02C Chemical Admixtures 28-4.02D Aggregates 28-4.03 CONSTRUCTION 28-4.03A General 28-4.03B Proportioning, Mixing, and Transporting |
381 | 28-4.03C Spreading, Compacting and Shaping 28-4.04 PAYMENT 28-5.01 GENERAL 28-5.01A Summary 28-5.01B Definitions 28-5.01C Submittals 28-5.01D Quality Assurance 28-5.01D(1) General 28-5.01D(2) Department Acceptance |
382 | 28-5.02 MATERIALS 28-5.02A General 28-5.02B Portland Cement Concrete 28-5.02C Curing Seal 28-5.03 CONSTRUCTION 28-5.03A General 28-5.03B Placing, Spreading, and Shaping 28-5.04 PAYMENT |
383 | 28-15.01 GENERAL 28-15.01A General 28-15.01B Materials 28-15.01C Construction 28-15.01D Payment 28-15.02 REPLACE BASES 28-15.03–28-15.08 RESERVED |
385 | 29 TREATED PERMEABLE BASES 29-1.01 GENERAL 29-1.02 MATERIALS 29-1.03 CONSTRUCTION 29-1.03A General 29-1.03B Surfaces Out of Tolerance 29-1.04 PAYMENT 29-2.01 GENERAL 29-2.01A Summary 29-2.01B Definitions |
386 | 29-2.01C Submittals 29-2.01D Quality Assurance 29-2.02 MATERIALS 29-2.02A General 29-2.02B Aggregate 29-2.03 CONSTRUCTION |
387 | 29-2.04 PAYMENT 29-3.01 GENERAL 29-3.02 MATERIALS 29-3.02A General 29-3.02B Aggregate 29-3.03 CONSTRUCTION 29-3.04 PAYMENT |
389 | 30 RECLAIMED PAVEMENT 30-1.01 GENERAL 30-1.01A Summary 30-1.01B Definitions 30-1.01C Submittals 30-1.01C(1) General 30-1.01C(2) Asphaltic Emulsion 30-1.01C(3) Quality Assurance Submittals 30-1.01C(3)(a) General 30-1.01C(3)(b) Test Strip 30-1.01C(3)(c) Quality Control Reporting |
390 | 30-1.01D Quality Assurance 30-1.01D(1) General 30-1.01D(2) Preoperation Meeting |
391 | 30-1.01D(3) Test Strip 30-1.01D(4) Quality Control 30-1.01D(4)(a) General 30-1.01D(4)(b) Sampling and Testing 30-1.01D(5) Department Acceptance 30-1.02 MATERIALS 30-1.02A General 30-1.02B Supplementary Aggregate 30-1.02C Water 30-1.02D Cement |
392 | 30-1.02E Asphaltic Emulsion 30-1.03 CONSTRUCTION 30-1.03A General 30-1.03B Equipment 30-1.03C Surface Preparation 30-1.03D Pulverizing and Mixing 30-1.03E Compacting and Grading 30-1.03F Finishing 30-1.04 PAYMENT |
393 | 30-2.01 GENERAL 30-2.01A Summary 30-2.01B Definitions 30-2.01C Submittals 30-2.01D Quality Assurance 30-2.01D(1) General 30-2.01D(2) Quality Control 30-2.01D(2)(a) General 30-2.01D(2)(b) Test Strip 30-2.01D(3) Department Acceptance |
394 | 30-2.02 MATERIALS 30-2.02A General 30-2.02B Sand Cover 30-2.02C Supplementary Aggregate 30-2.03 CONSTRUCTION 30-2.03A General 30-2.03B Equipment |
395 | 30-2.03C Spreading 30-2.03D Compacting and Grading 30-2.03E Finishing 30-2.04 PAYMENT 30-3.01 GENERAL 30-3.01A Summary 30-3.01B Definitions 30-3.01C Submittals 30-3.01C(1) General 30-3.01C(2) Quality Assurance Submittals 30-3.01C(2)(a) General 30-3.01C(2)(b) Mix Design 30-3.01C(2)(c) Quality Control Reporting |
396 | 30-3.01D Quality Assurance 30-3.01D(1) General 30-3.01D(1)(a) General 30-3.01D(1)(b) Preoperation Meeting |
397 | 30-3.01D(1)(c) Test Strip 30-3.01D(2) Quality Control 30-3.01D(2)(a) General 30-3.01D(2)(b) Mix Design Sampling and Testing 30-3.01D(2)(c) Quality Control Sampling and Testing |
398 | 30-3.01D(3) Department Acceptance 30-3.02 MATERIALS 30-3.02A General |
399 | 30-3.02B Asphalt Binder 30-3.02C Core Backfill Material 30-3.03 CONSTRUCTION 30-3.03A General 30-3.03B Equipment |
400 | 30-3.03C Spreading Materials 30-3.03D Pulverizing and Mixing |
401 | 30-3.03E Compacting and Grading 30-3.03F Finishing 30-3.04 PAYMENT 30-4.01 GENERAL 30-4.01A Summary 30-4.01B Definitions |
402 | 30-4.01C Submittals 30-4.01C(1) General 30-4.01C(2) Quality Assurance Submittals 30-4.01C(2)(a) General 30-4.01C(2)(b) Mix Design 30-4.01C(2)(c) Quality Control Reporting 30-4.01D Quality Assurance 30-4.01D(1) General |
403 | 30-4.01D(2) Mix Design 30-4.01D(3) Quality Control 30-4.01D(3)(a) General 30-4.01D(3)(b) Sampling, and Testing |
404 | 30-4.01D(4) Department Acceptance 30-4.02 MATERIALS 30-4.02A General |
405 | 30-4.02B Cement 30-4.02C Water 30-4.02D Supplementary Aggregate 30-4.02E Core Backfill Material 30-4.03 CONSTRUCTION 30-4.03A General 30-4.03B Equipment |
406 | 30-4.03C Pulverizing 30-4.03D Spreading Materials 30-4.03E Mixing 30-4.03F Compacting and Grading 30-4.03G Finishing |
407 | 30-4.04 PAYMENT 30-10.01 GENERAL 30-10.01A Summary 30-10.01B Definitions 30-10.01C Submittals 30-10.01D Quality Assurance 30-10.01D(1) General 30-10.01D(2) Test Section 30-10.01D(3) Quality Control |
408 | 30-10.01D(4) Department Acceptance 30-10.02 MATERIALS 30-10.02A General 30-10.03 CONSTRUCTION 30-10.03A General 30-10.03B Cracking 30-10.03C Seating 30-10.03D Surface Preparation |
409 | 30-10.03E Reserved 30-10.04 PAYMENT 31–35 RESERVED |
411 | DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 36-1.01 GENERAL 36-1.01A Summary 36-1.01B Definitions 36-1.01C Submittals 36-1.01D Quality Assurance 36-1.01D(1) General 36-1.01D(2) Preconstruction Meetings 36-1.02 MATERIALS |
412 | 36-1.03 CONSTRUCTION 36-1.04 PAYMENT 36-2.01 GENERAL 36-2.01A Summary 36-2.01B Definitions 36-2.01C Submittals 36-2.01D Quality Assurance 36-2.02 MATERIALS 36-2.03 CONSTRUCTION 36-2.03A General 36-2.03B Applying and Placing Base Bond Breaker |
413 | 36-2.04 PAYMENT 36-3.01 GENERAL 36-3.01A Summary 36-3.01B Definitions 36-3.01C Submittals 36-3.01C(1) General 36-3.01C(2) Inertial Profiler Certification 36-3.01C(3) Inertial Profiler Data |
414 | 36-3.01C(4) Straightedge Measurements 36-3.01D Quality Assurance 36-3.01D(1) General 36-3.01D(2) Certifications 36-3.01D(3) Quality Control 36-3.01D(3)(a) General |
415 | 36-3.01D(3)(b) Smoothness 36-3.01D(3)(b)(i) General 36-3.01D(3)(b)(ii) Inertial Profiler Calibration and Verification Tests 36-3.01D(3)(b)(iii) Performing, Analyzing and Collecting Data |
416 | 36-3.01D(4) Department Acceptance 36-3.02 MATERIALS 36-3.03 CONSTRUCTION 36-3.04 PAYMENT |
417 | 37 BITUMINOUS SEALS 37-1.01 GENERAL 37-1.01A Summary 37-1.01B Definitions 37-1.01C Submittals 37-1.01D Quality Assurance 37-1.02 MATERIALS 37-1.03 CONSTRUCTION 37-1.03A General 37-1.03B Equipment |
418 | 37-1.04 PAYMENT 37-2.01 GENERAL 37-2.01A General 37-2.01A(1) Summary 37-2.01A(2) Definitions 37-2.01A(3) Submittals 37-2.01A(4) Quality Assurance 37-2.01A(4)(a) General 37-2.01A(4)(b) Quality Control 37-2.01A(4)(c) Department Acceptance 37-2.01B Materials 37-2.01C Construction 37-2.01C(1) General |
419 | 37-2.01C(2) Equipment 37-2.01C(3) Surface Preparation 37-2.01C(4) Applying Emulsion and Asphalt Binder |
420 | 37-2.01C(5) Spreading Screenings 37-2.01C(6) Finishing 37-2.01C(7) Seal Coat Brooming |
421 | 37-2.01D Payment 37-2.02 FOG SEAL COAT 37-2.02A General 37-2.02A(1) Summary 37-2.02A(2) Definitions 37-2.02A(3) Submittals 37-2.02A(4) Quality Assurance 37-2.02B Materials 37-2.02C Construction |
422 | 37-2.02D Payment 37-2.03 FLUSH COATS 37-2.03A General 37-2.03B Materials 37-2.03C Construction 37-2.03D Payment 37-2.04 ASPHALTIC EMULSION SEAL COAT 37-2.04A General 37-2.04A(1) General 37-2.04A(1)(a) Summary 37-2.04A(1)(b) Definitions 37-2.04A(1)(c) Submittals |
423 | 37-2.04A(1)(d) Quality Assurance 37-2.04A(2) Materials 37-2.04A(3) Construction 37-2.04A(4) Payment 37-2.04B Nonpolymer Asphaltic Emulsion Seal Coat 37-2.04B(1) General 37-2.04B(1)(a) Summary 37-2.04B(1)(b) Definitions 37-2.04B(1)(c) Submittals 37-2.04B(1)(d) Quality Assurance 37-2.04B(1)(d)(i) General 37-2.04B(1)(d)(ii) Quality Control |
424 | 37-2.04B(1)(d)(iii) Department Acceptance 37-2.04B(2) Materials 37-2.04B(3) Construction |
425 | 37-2.04B(4) Payment 37-2.04C Polymer Asphaltic Emulsion Seal Coat 37-2.04C(1) General 37-2.04C(1)(a) Summary 37-2.04C(1)(b) Definitions 37-2.04C(1)(c) Submittals |
426 | 37-2.04C(1)(d) Quality Assurance |
427 | 37-2.04C(2) Materials 37-2.04C(3) Construction |
428 | 37-2.04C(4) Payment |
429 | 37-2.05 ASPHALT BINDER SEAL COATS 37-2.05A General 37-2.05B Asphalt Rubber Binder Seal Coats 37-2.05B(1) General 37-2.05B(1)(a) Summary 37-2.05B(1)(b) Definitions 37-2.05B(1)(c) Submittals |
430 | 37-2.05B(1)(d) Quality Assurance 37-2.05B(1)(d)(i) General 37-2.05B(1)(d)(ii) Quality Control 37-2.05B(1)(d)(ii)(A) General 37-2.05B(1)(d)(ii)(B) Asphalt Modifier 37-2.05B(1)(d)(ii)(C) Crumb Rubber Modifier 37-2.05B(1)(d)(ii)(D) Asphalt Rubber Binder |
431 | 37-2.05B(1)(d)(iii) Department Acceptance 37-2.05B(1)(d)(iii)(A) General 37-2.05B(1)(d)(iii)(B) Crumb Rubber Modifier 37-2.05B(1)(d)(iii)(C) Asphalt Rubber Binder |
432 | 37-2.05B(1)(d)(iii)(D) Precoated Screenings 37-2.05B(2) Materials 37-2.05B(2)(a) General 37-2.05B(2)(b) Asphalt Binder 37-2.05B(2)(c) Asphalt Modifier 37-2.05B(2)(d) Crumb Rubber Modifier |
433 | 37-2.05B(2)(e) Asphalt Rubber Binder |
434 | 37-2.05B(2)(f) Screenings |
435 | 37-2.05B(3) Construction 37-2.05B(3)(a) General 37-2.05B(3)(b) Equipment 37-2.05B(3)(c) Precoating Screenings 37-2.05B(3)(d) Asphalt Rubber Binder Application |
436 | 37-2.05B(3)(e) Screenings Application 37-2.05B(3)(f) Rolling and Sweeping 37-2.05B(4) Payment 37-2.05C Reserved 37-2.06 STRESS ABSORBING MEMBRANE INTERLAYER 37-2.06A General 37-2.06B Materials 37-2.06C Construction |
437 | 37-2.06D Payment 37-2.07–37-2.10 RESERVED 37-3.01 GENERAL 37-3.01A Summary 37-3.01B Definitions 37-3.01C Submittals 37-3.01C(1) General 37-3.01C(2) Slurry Seal 37-3.01C(3) Micro-surfacing |
438 | 37-3.01D Quality Assurance 37-3.01D(1) General 37-3.01D(2) Slurry Seal 37-3.01D(3) Micro-surfacing 37-3.01D(4) Department Acceptance |
439 | 37-3.02 MATERIALS 37-3.02A General 37-3.02B Slurry Seal 37-3.02B(1) General 37-3.02B(2) Aggregate |
440 | 37-3.02B(3) Polymer Modified Asphaltic Emulsion 37-3.02C Micro-surfacing 37-3.02C(1) General |
441 | 37-3.02C(2) Aggregate 37-3.02C(3) Micro-surfacing Emulsion |
442 | 37-3.02C(4) Mineral Filler 37-3.03 CONSTRUCTION 37-3.03A General 37-3.03B Proportioning 37-3.03B(1) General 37-3.03B(2) Slurry Seal 37-3.03B(3) Micro-surfacing 37-3.03C Mixing and Spreading Equipment 37-3.03C(1) General 37-3.03C(2) Truck Mounted Mixer Spreaders |
443 | 37-3.03C(3) Continuous Self-Loading Mixing Machine 37-3.03C(4) Slurry Seal Equipment 37-3.03C(4)(a) General 37-3.03C(4)(b) Spreader Box 37-3.03C(5) Micro-surfacing Equipment 37-3.03C(5)(a) General 37-3.03C(5)(b) Spreader Box |
444 | 37-3.03C(5)(c) Shoulder Equipment 37-3.03C(5)(d) Scratch Course Box 37-3.03C(5)(e) Wheel Path Depression Boxes 37-3.03D Placing 37-3.03D(1) General 37-3.03D(2) Surface Preparation 37-3.03D(2)(a) General 37-3.03D(2)(b) Slurry Seal |
445 | 37-3.03D(2)(c) Micro-surfacing 37-3.03D(2)(c)(i) General 37-3.03D(2)(c)(ii) Repair Wheel Path Depression 37-3.03D(3) Test Strips 37-3.03D(3)(a) General 37-3.03D(3)(b) Slurry Seal 37-3.03D(3)(c) Micro-surfacing 37-3.03D(4) Placement 37-3.03D(4)(a) General 37-3.03D(4)(a)(i) General |
446 | 37-3.03D(4)(a)(ii) Weather Conditions 37-3.03D(4)(b) Slurry Seal 37-3.03D(4)(c) Micro-surfacing 37-3.03D(4)(c)(i) General |
447 | 37-3.03D(4)(c)(ii) Joints 37-3.03D(4)(c)(iii) Finished Surface 37-3.03D(4)(c)(iv) Repair of Early Distress 37-3.04 PAYMENT 37-4.01 GENERAL 37-4.01A Summary 37-4.01B Definitions 37-4.01C Submittals |
448 | 37-4.01D Quality Assurance 37-4.02 MATERIALS 37-4.02A General 37-4.02B Mix Design 37-4.02C Proportioning |
449 | 37-4.03 CONSTRUCTION 37-4.03A General 37-4.03C Surface Preparation 37-4.03D Placement 37-4.04 PAYMENT 37-5.01 GENERAL 37-5.01A Summary 37-5.01B Definitions |
450 | 37-5.01C Submittals 37-5.01D Quality Assurance 37-5.02 MATERIALS |
451 | 37-5.03 CONSTRUCTION |
452 | 37-5.04 PAYMENT 38 RESERVED |
453 | 39 ASPHALT CONCRETE 39-1.01 GENERAL 39-1.02 MATERIALS 39-1.03 CONSTRUCTION 39-1.04 PAYMENT 39-2.01 GENERAL 39-2.01A General 39-2.01A(1) Summary |
454 | 39-2.01A(2) Definitions |
455 | 39-2.01A(3) Submittals 39-2.01A(3)(a) General 39-2.01A(3)(b) Job Mix Formula 39-2.01A(3)(b)(i) General 39-2.01A(3)(b)(ii) Job Mix Formula Renewal 39-2.01A(3)(b)(iii) Job Mix Formula Modification |
456 | 39-2.01A(3)(c) Quality Control Plan 39-2.01A(3)(d) Test Results |
457 | 39-2.01A(3)(e) Reserved 39-2.01A(3)(f) Liquid Antistrip Treatment 39-2.01A(3)(g) Lime Treatment |
458 | 39-2.01A(3)(h) Warm Mix Asphalt Technology |
459 | 39-2.01A(3)(i) Samples 39-2.01A(3)(j)–39-2.01A(3)(k) Reserved 39-2.01A(3)(l) Data Cores |
460 | 39-2.01A(3)(m)–39-2.01A(3)(o) Reserved 39-2.01A(4) Quality Assurance 39-2.01A(4)(a) General 39-2.01A(4)(b) Job Mix Formula Verification |
461 | 39-2.01A(4)(c) Job Mix Formula Authorization 39-2.01A(4)(d) Job Mix Formula Renewal |
462 | 39-2.01A(4)(e) Job Mix Formula Modification 39-2.01A(4)(f) Certifications 39-2.01A(4)(f)(i) General 39-2.01A(4)(f)(ii) Hot Mix Asphalt Plants 39-2.01A(4)(f)(iii)–39-2.01A(4)(f)(v) Reserved 39-2.01A(4)(g) Reserved 39-2.01A(4)(h) Quality Control 39-2.01A(4)(h)(i) General |
463 | 39-2.01A(4)(h)(ii) Reserved 39-2.01A(4)(h)(iii) Aggregates 39-2.01A(4)(h)(iii)(A) General 39-2.01A(4)(h)(iii)(B) Aggregate Lime Treatments |
464 | 39-2.01A(4)(h)(iv) Liquid Antistrip Treatment 39-2.01A(4)(h)(v) Production Start-up Evaluation 39-2.01A(4)(h)(vi) Hot Mix Asphalt Density 39-2.01A(4)(h)(vii) Tapered Notched Wedge 39-2.01A(4)(h)(viii) Density Cores |
465 | 39-2.01A(4)(h)(ix) Pavement Smoothness 39-2.01A(4)(h)(x) Reserved 39-2.01A(4)(i) Department Acceptance 39-2.01A(4)(i)(i) General |
466 | 39-2.01A(4)(i)(ii) In-Place Density 39-2.01A(4)(i)(iii) Pavement Smoothness |
467 | 39-2.01A(4)(i)(iv) Dispute Resolution 39-2.01B Materials 39-2.01B(1) General 39-2.01B(2) Mix Design 39-2.01B(2)(a) General 39-2.01B(2)(b) Hot Mix Asphalt Treatments |
468 | 39-2.01B(2)(c) Warm Mix Asphalt Technology 39-2.01B(3) Asphalt Binder 39-2.01B(4) Aggregates 39-2.01B(4)(a) General 39-2.01B(4)(b) Aggregate Gradations 39-2.01B(4)(c) Aggregate Lime Treatments 39-2.01B(4)(c)(i) General |
469 | 39-2.01B(4)(c)(ii) Dry Lime 39-2.01B(4)(c)(iii) Lime Slurry |
470 | 39-2.01B(5) Liquid Antistrip Treatment 39-2.01B(6)–39-2.01B(7) Reserved 39-2.01B(8) Hot Mix Asphalt Production 39-2.01B(8)(a) General 39-2.01B(8)(b) Liquid Antistrip |
471 | 39-2.01B(8)(c) Warm Mix Asphalt Technology |
472 | 39-2.01B(9) Geosynthetic Pavement Interlayer 39-2.01B(10) Tack Coat 39-2.01B(11) Miscellaneous Areas and Dikes 39-2.01C Construction 39-2.01C(1) General 39-2.01C(2) Spreading and Compacting Equipment 39-2.01C(2)(a) General |
473 | 39-2.01C(2)(b) Material Transfer Vehicle 39-2.01C(2)(c) Method Compaction Equipment 39-2.01C(2)(d)–39-2.01C(2)(f) Reserved 39-2.01C(3) Surface Preparation 39-2.01C(3)(a) General 39-2.01C(3)(b) Subgrade 39-2.01C(3)(c) Reserved 39-2.01C(3)(d) Prepaving Inertial Profiler |
474 | 39-2.01C(3)(e) Prepaving Grinding 39-2.01C(3)(f) Tack Coat |
475 | 39-2.01C(3)(g) Geosynthetic Pavement Interlayer |
476 | 39-2.01C(4) Longitudinal Joints 39-2.01C(4)(a) General 39-2.01C(4)(b) Tapered Notched Wedge |
477 | 39-2.01C(5) Pavement Edge Treatments 39-2.01C(6) Widening Existing Pavement 39-2.01C(7) Shoulders, Medians, and Other Road Connections 39-2.01C(8) Leveling |
478 | 39-2.01C(9) Miscellaneous Areas and Dikes 39-2.01C(10)–39-2.01C(14) Reserved 39-2.01C(15) Compaction 39-2.01C(15)(a) General 39-2.01C(15)(b) Method Compaction 39-2.01C(15)(c)–39-2.01C(15)(e) Reserved 39-2.01C(16) Smoothness Corrections |
479 | 39-2.01C(17) Data Cores 39-2.01D Payment |
480 | 39-2.02 TYPE A HOT MIX ASPHALT 39-2.02A General 39-2.02A(1) Summary 39-2.02A(2) Definitions 39-2.02A(3) Submittals 39-2.02A(3)(a) General 39-2.02A(3)(b) Job Mix Formula 39-2.02A(3)(c) Reclaimed Asphalt Pavement 39-2.02A(3)(d)–39-2.02A(3)(f) Reserved 39-2.02A(4) Quality Assurance 39-2.02A(4)(a) General 39-2.02A(4)(b) Quality Control 39-2.02A(4)(b)(i) General 39-2.02A(4)(b)(ii) Aggregates |
481 | 39-2.02A(4)(b)(iii) Reclaimed Asphalt Pavement 39-2.02A(4)(b)(iv)–39-2.02A(4)(b)(viii) Reserved 39-2.02A(4)(b)(ix) Type A Hot Mix Asphalt Production |
482 | 39-2.02A(4)(c)–39-2.02A(4)(d) Reserved 39-2.02A(4)(e) Department Acceptance |
484 | 39-2.02B Materials 39-2.02B(1) General 39-2.02B(2) Type A Hot Mix Asphalt Mix Design |
485 | 39-2.02B(3) Asphalt Binder 39-2.02B(4) Aggregates 39-2.02B(4)(a) General 39-2.02B(4)(b) Aggregate Gradations |
486 | 39-2.02B(5) Reclaimed Asphalt Pavement |
487 | 39-2.02B(6)–39-2.02B(10) Reserved 39-2.02B(11) Type A Hot Mix Asphalt Production 39-2.02C Construction |
488 | 39-2.02D Payment 39-2.03 RUBBERIZED HOT MIX ASPHALT–GAP GRADED 39-2.03A General 39-2.03A(1) Summary 39-2.03A(2) Definitions 39-2.03A(3) Submittals 39-2.03A(3)(a) General 39-2.03A(3)(b) Job Mix Formula 39-2.03A(3)(c) Asphalt Rubber Binder |
489 | 39-2.03A(4) Quality Assurance 39-2.03A(4)(a) General 39-2.03A(4)(b) Job Mix Formula Verification 39-2.03A(4)(c) Quality Control 39-2.03A(4)(c)(i) General 39-2.03A(4)(c)(ii) Asphalt Rubber Binder 39-2.03A(4)(c)(ii)(A) General 39-2.03A(4)(c)(ii)(B) Asphalt Modifier 39-2.03A(4)(c)(ii)(C) Crumb Rubber Modifier |
490 | 39-2.03A(4)(c)(ii)(D) Asphalt Rubber Binder 39-2.03A(4)(c)(iii) Aggregates 39-2.03A(4)(c)(iv)–39-2.03A(4)(c)(viii) Reserved 39-2.03A(4)(c)(ix) Rubberized Hot Mix Asphalt–Gap Graded Production |
491 | 39-2.03A(4)(d) Reserved 39-2.03A(4)(e) Department Acceptance 39-2.03A(4)(e)(i) General |
492 | 39-2.03A(4)(e)(ii) Asphalt Rubber Binder 39-2.03A(4)(e)(ii)(A) General 39-2.03A(4)(e)(ii)(B) Asphalt Modifier |
493 | 39-2.03A(4)(e)(ii)(C) Crumb Rubber Modifier 39-2.03A(4)(e)(ii)(D) Asphalt Rubber Binder 39-2.03A(4)(e)(iii)–39-2.03A(4)(e)(v) Reserved 39-2.03B Materials 39-2.03B(1) General |
494 | 39-2.03B(2) Rubberized Hot Mix Asphalt–Gap Graded Mix Design |
495 | 39-2.03B(3) Asphalt Rubber Binder 39-2.03B(3)(a) General 39-2.03B(3)(b) Asphalt Modifier 39-2.03B(3)(c) Crumb Rubber Modifier 39-2.03B(3)(d) Design and Profile |
496 | 39-2.03B(3)(e) Asphalt Rubber Binder Production 39-2.03B(3)(e)(i) General 39-2.03B(3)(e)(ii) Mixing 39-2.03B(4) Aggregates 39-2.03B(4)(a) General |
497 | 39-2.03B(4)(b) Aggregate Gradations |
498 | 39-2.03B(5) Rubberized Hot Mix Asphalt–Gap Graded Production 39-2.03C Construction |
499 | 39-2.03D Payment 39-2.04 OPEN GRADED FRICTION COURSES 39-2.04A General 39-2.04A(1) Summary 39-2.04A(2) Definitions 39-2.04A(3) Submittals 39-2.04A(4) Quality Assurance 39-2.04A(4)(a) General 39-2.04A(4)(b) Quality Control 39-2.04A(4)(b)(i) General 39-2.04A(4)(b)(ii) Asphalt Rubber Binder 39-2.04A(4)(b)(iii) Aggregates 39-2.04A(4)(b)(iv) Open Graded Friction Course Production |
500 | 39-2.04A(4)(c) Department Acceptance 39-2.04A(4)(c)(i) General 39-2.04A(4)(c)(ii) Asphalt Rubber Binder 39-2.04A(4)(c)(iii) Pavement Smoothness 39-2.04A(4)(c)(iv)–39-2.04A(4)(c)(v) Reserved 39-2.04B Materials 39-2.04B(1) General 39-2.04B(2) Open Graded Friction Course Mix Design 39-2.04B(3) Asphalt Binder |
501 | 39-2.04B(4) Aggregates 39-2.04B(4)(a) General 39-2.04B(4)(b) Aggregate Gradations |
502 | 39-2.04B(5) Sand 39-2.04C Construction |
503 | 39-2.04D Payment 39-2.05 BONDED WEARING COURSES 39-2.05A General 39-2.05A(1) General 39-2.05A(1)(a) Summary 39-2.05A(1)(b) Definitions 39-2.05A(1)(c) Submittals |
504 | 39-2.05A(1)(d) Quality Assurance 39-2.05A(1)(d)(i) General 39-2.05A(1)(d)(ii) Quality Control 39-2.05A(1)(d)(iii) Department Acceptance 39-2.05A(2) Materials 39-2.05A(2)(a) General 39-2.05A(2)(b) Asphaltic Emulsion |
505 | 39-2.05A(2)(c) Reserved 39-2.05A(3) Construction 39-2.05A(3)(a) General 39-2.05A(3)(b) Spreading and Compacting Equipment 39-2.05A(3)(c) Applying Asphaltic Emulsion 39-2.05A(3)(d) Placing and Compacting Hot Mix Asphalt |
506 | 39-2.05A(4) Payment 39-2.05B Bonded Wearing Courses–Gap Graded 39-2.05B(1) General 39-2.05B(1)(a) Summary 39-2.05B(1)(b) Definitions 39-2.05B(1)(c) Submittals 39-2.05B(1)(d) Quality Assurance 39-2.05B(1)(d)(i) General 39-2.05B(1)(d)(ii) Quality Control 39-2.05B(1)(d)(ii)(A) General 39-2.05B(1)(d)(ii)(B) Aggregates |
507 | 39-2.05B(1)(d)(ii)(C) Bonded Wearing Course–Gap Graded Production 39-2.05B(1)(d)(ii)(D)–39-2.05B(1)(d)(ii)(G) Reserved 39-2.05B(1)(d)(iii) Department Acceptance 39-2.05B(2) Materials 39-2.05B(2)(a) General 39-2.05B(2)(b) Bonded Wearing Course–Gap Graded Mix Design |
508 | 39-2.05B(2)(c) Asphalt Binder 39-2.05B(2)(d) Aggregates |
509 | 39-2.05B(3) Construction 39-2.05B(4) Payment |
510 | 39-2.06 HOT MIX ASPHALT ON BRIDGE DECKS 39-2.06A General 39-2.06B Materials 39-2.06C Construction 39-2.06D Payment 39-2.07 MINOR HOT MIX ASPHALT 39-2.07A General 39-2.07A(1) Summary 39-2.07A(2) Definitions 39-2.07A(3) Submittals 39-2.07A(4) Quality Assurance 39-2.07A(4)(a) General |
511 | 39-2.07A(4)(b) Quality Control 39-2.07A(4)(c) Department Acceptance 39-2.07B Materials 39-2.07B(1) General 39-2.07B(2) Minor Hot Mix Asphalt Mix Design 39-2.07B(3) Asphalt Binder 39-2.07B(4) Liquid Antistrip Treatment 39-2.07C Construction 39-2.07D Payment 39-2.08–39-2.10 RESERVED 39-3.01 GENERAL 39-3.01A General 39-3.01B Materials 39-3.01C Construction 39-3.01D Payment |
512 | 39-3.02 REPLACE ASPHALT CONCRETE SURFACING 39-3.02A General 39-3.02B Materials 39-3.02C Construction 39-3.02D Payment 39-3.03 REMOVE ASPHALT CONCRETE DIKES 39-3.03A General 39-3.03B Materials 39-3.03C Construction 39-3.03D Payment 39-3.04 COLD PLANING ASPHALT CONCRETE PAVEMENT 39-3.04A General 39-3.04B Materials 39-3.04C Construction 39-3.04C(1) General |
513 | 39-3.04C(2) Grade Control and Surface Smoothness 39-3.04C(3) Planed Material 39-3.04C(4) Temporary HMA Tapers 39-3.04D Payment 39-3.05 REMOVE BASE AND SURFACING 39-3.05A General 39-3.05B Materials |
514 | 39-3.05C Construction 39-3.05D Payment 39-3.06–39-3.08 RESERVED |
515 | 40 CONCRETE PAVEMENT 40-1.01 GENERAL 40-1.01A Summary 40-1.01B Definitions 40-1.01C Submittals 40-1.01C(1) General 40-1.01C(2) Certificates of Compliance 40-1.01C(3) Quality Control Plan 40-1.01C(4) Mix Design 40-1.01C(5) Just-In-Time Training |
516 | 40-1.01C(6) Concrete Field Qualification 40-1.01C(7) Test Strips 40-1.01C(8) Cores 40-1.01C(9) Coefficient of Thermal Expansion 40-1.01C(10)–40-1.01C(15) Reserved 40-1.01D Quality Assurance 40-1.01D(1) General 40-1.01D(2) Just-In-Time Training 40-1.01D(3) Quality Control Plan |
517 | 40-1.01D(4) Qualifications 40-1.01D(5) Mix Designs 40-1.01D(6) Test Strips |
518 | 40-1.01D(7) Quality Control 40-1.01D(7)(a) General |
519 | 40-1.01D(7)(b) Concrete Field Qualification 40-1.01D(7)(c)–40-1.01D(7)(h) Reserved 40-1.01D(8) Department Acceptance 40-1.01D(8)(a) General 40-1.01D(8)(b) Verification Testing 40-1.01D(8)(b)(i) General 40-1.01D(8)(b)(ii) Air Content |
520 | 40-1.01D(8)(c) Acceptance Testing 40-1.01D(8)(c)(i) General |
522 | 40-1.01D(8)(c)(ii) Dowel and Tie Bar Placement 40-1.01D(8)(c)(iii) Pavement Smoothness 40-1.01D(8)(c)(iv) Thickness |
523 | 40-1.01D(8)(c)(v)–40-1.01D(8)(c)(viii) Reserved 40-1.02 MATERIALS 40-1.02A General 40-1.02B Concrete 40-1.02B(1) General 40-1.02B(2) Cementitious Material 40-1.02B(3) Aggregate 40-1.02B(4) Air Entrainment 40-1.02B(5)–40-1.02B(8) Reserved 40-1.02C Reinforcement, Bars, and Baskets 40-1.02C(1) General 40-1.02C(2) Bar Reinforcement |
524 | 40-1.02C(3) Dowel Bars 40-1.02C(4) Tie Bars 40-1.02C(5) Dowel and Tie Bar Baskets |
525 | 40-1.02D Dowel Bar Lubricant 40-1.02E Joint Filler 40-1.02F Nonshrink Hydraulic-Cement Grout 40-1.02G–40-1.02N Reserved 40-1.03 CONSTRUCTION 40-1.03A General 40-1.03B Joints 40-1.03B(1) General |
526 | 40-1.03B(2) Construction Joints 40-1.03B(3) Contraction Joints 40-1.03B(4) Isolation Joints 40-1.03C Bar Reinforcement 40-1.03D Dowel Bar Placement |
527 | 40-1.03E Tie Bar Placement |
528 | 40-1.03F Placing Concrete 40-1.03F(1) General 40-1.03F(2) Paving Adjacent to Existing Concrete Pavement 40-1.03F(3) Concrete Pavement Transition Panel 40-1.03F(4) Stationary Side-Form Construction |
529 | 40-1.03F(5) Slip form Construction 40-1.03G Edge Treatment |
530 | 40-1.03H Finishing 40-1.03H(1) General 40-1.03H(2) Preliminary Finishing 40-1.03H(2)(a) General 40-1.03H(2)(b) Stationary Side Form Finishing 40-1.03H(2)(c) Slip form Finishing 40-1.03H(3) Final Finishing |
531 | 40-1.03I Curing 40-1.03J Protecting Concrete Pavement 40-1.03K Early Use of Concrete Pavement 40-1.03L Reserved 40-1.03M Drilling Cores |
532 | 40-1.03N Correcting Noncompliant Pavement Work 40-1.03N(1) General 40-1.03N(2) Spall and Ravel Repair 40-1.03N(3) Crack Repair 40-1.03O Smoothness and Friction Correction |
533 | 40-1.03P–40-1.03U Reserved 40-1.04 PAYMENT 40-2.01 GENERAL 40-2.01A Summary 40-2.01B Definitions 40-2.01C Submittals 40-2.01D Quality Assurance 40-2.02 MATERIALS 40-2.02A General |
534 | 40-2.02B Transverse Bar Assembly 40-2.02C Wide Flange Beam 40-2.02D Joints 40-2.03 CONSTRUCTION 40-2.03A General 40-2.03B Bar Reinforcement 40-2.03C Construction Joints 40-2.03D Wide-Flange Beams 40-2.03E Correcting Noncompliant Pavement Work 40-2.03E(1) General 40-2.03E(2) Partial Depth Repair |
535 | 40-2.03E(3) Full-Depth Repair 40-2.03E(3)(a) General 40-2.03E(3)(b) Transverse Cracks 40-2.03E(3)(c) Longitudinal Cracks 40-2.03F Reserved 40-2.04 PAYMENT 40-4.01 GENERAL 40-4.01A Summary 40-4.01B Definitions 40-4.01C Submittals 40-4.01D Quality Assurance 40-4.02 MATERIALS |
536 | 40-4.03 CONSTRUCTION 40-4.03A General 40-4.03B Correcting Noncompliant Pavement Work 40-4.03C–40-4.03G Reserved 40-4.04 PAYMENT |
537 | 41 EXISTING CONCRETE PAVEMENT 41-1.01 GENERAL 41-1.01A General 41-1.01B Definitions 41-1.01C Submittals 41-1.01D Quality Assurance 41-1.02 MATERIALS 41-1.02A General 41-1.02B Fast-Setting Concrete |
538 | 41-1.02C Polyester Concrete |
540 | 41-1.02D Bonding Agent 41-1.02E Temporary Pavement Structure 41-1.02F Reserved 41-1.03 CONSTRUCTION 41-1.03A General 41-1.03B Mixing and Applying Bonding Agent 41-1.03C Mixing Concrete 41-1.03C(1) General |
541 | 41-1.03C(2) Polyester Concrete 41-1.03D Placing Concrete 41-1.03E Curing Concrete 41-1.03F Reserved 41-1.04 PAYMENT 41-2.01 GENERAL 41-2.01A Summary 41-2.01B Definitions 41-2.01C Submittals |
542 | 41-2.01D Quality Assurance 41-2.01D(1) General 41-2.01D(2) Quality Control 41-2.01D(3) Department Acceptance 41-2.02 MATERIALS 41-2.02A General 41-2.02B Grout 41-2.02C Mortar 41-2.02D Reserved 41-2.03 CONSTRUCTION 41-2.03A General 41-2.03B Injecting Grout 41-2.03B(1) General |
543 | 41-2.03B(2) Subsealing 41-2.03B(3) Jacking 41-2.03C Finishing 41-2.03D Tolerances 41-2.04 PAYMENT |
544 | 41-3.01 GENERAL 41-3.01A Summary 41-3.01B Definitions 41-3.01C Submittals 41-3.01C(1) General 41-3.01C(2) Public Safety and Application Plans 41-3.01C(3) Reserved 41-3.01D Quality Assurance 41-3.01D(1) General |
545 | 41-3.01D(2) Test Area 41-3.01D(3) Department Acceptance 41-3.02 MATERIALS 41-3.03 CONSTRUCTION |
546 | 41-3.04 PAYMENT 41-4.01 GENERAL 41-4.01A Summary 41-4.01B Definitions 41-4.01C Submittals 41-4.01D Quality Assurance 41-4.02 MATERIALS 41-4.03 CONSTRUCTION 41-4.03A General |
547 | 41-4.03B Remove Pavement 41-4.03C Cleaning 41-4.03D Compression Relief at Joints and Cracks 41-4.03D(1) General 41-4.03D(2) Form Board Installation 41-4.03D(3) Saw Cut Method 41-4.03E–41-4.03H Reserved 41-4.04 PAYMENT |
548 | 41-5.01 GENERAL 41-5.01A Summary 41-5.01B Definitions 41-5.01C Submittals 41-5.01D Quality Assurance 41-5.01D(1) General 41-5.01D(2) Department Acceptance 41-5.02 MATERIALS 41-5.02A General 41-5.02B Silicone Joint Sealant 41-5.02C Asphalt Rubber Joint Sealant 41-5.02D Backer Rods |
549 | 41-5.02E Preformed Compression Joint Seals 41-5.02F–41-5.02K Reserved 41-5.03 CONSTRUCTION 41-5.03A General 41-5.03B Joint Cleaning 41-5.03B(1) General 41-5.03B(2) Removing Debris 41-5.03B(3) Drying 41-5.03B(4) Sandblasting 41-5.03B(5) Air Blasting 41-5.03B(6) Vacuuming |
550 | 41-5.03B(7) Reserved 41-5.03C Installing Liquid Joint Sealant 41-5.03D Installing Preformed Compression Joint Seals 41-5.03E Reserved 41-5.04 PAYMENT 41-7.01 GENERAL |
551 | 41-7.02 MATERIALS 41-7.03 CONSTRUCTION 41-7.04 PAYMENT 41-9.01 GENERAL 41-9.01A Summary 41-9.01B Definitions 41-9.01C Submittals 41-9.01C(1) General |
552 | 41-9.01C(2) Quality Control Plan 41-9.01C(3) Mix Design |
553 | 41-9.01C(4) Reserved 41-9.01D Quality Assurance 41-9.01D(1) General 41-9.01D(2) Just-In-Time Training 41-9.01D(3) Preconstruction Meeting 41-9.01D(4) Trial Slabs |
554 | 41-9.01D(5) Quality Control 41-9.01D(5)(a) General 41-9.01D(5)(b) Rapid Strength Concrete |
555 | 41-9.01D(5)(c) Modulus of Rupture 41-9.01D(6) Department Acceptance 41-9.01D(6)(a) General 41-9.01D(6)(b) Modulus of Rupture |
556 | 41-9.01D(6)(c) Concrete Pavement Smoothness 41-9.01D(6)(d) Cracking and Raveling 41-9.01D(6)(e) Reserved 41-9.02 MATERIALS 41-9.02A General 41-9.02B Rapid Strength Concrete 41-9.02C Dowel Bars 41-9.02D–41-9.02E Reserved 41-9.03 CONSTRUCTION 41-9.03A General 41-9.03B Removing Existing Pavement 41-9.03C Placing Dowel Bars |
557 | 41-9.03D Placing Rapid Strength Concrete 41-9.03E Joints 41-9.03E(1) General 41-9.03E(2) Construction Joints 41-9.03E(3) Contraction Joints 41-9.03F Final Finishing |
558 | 41-9.03G Temporary Pavement Structure 41-9.03H Noncompliant Individual Slab Replacement 41-9.03I Replace Pavement Delineation 41-9.03J Reserved 41-9.04 PAYMENT 41-10.01 GENERAL 41-10.01A Summary 41-10.01B Definitions |
559 | 41-10.01C Submittals 41-10.01D Quality Assurance 41-10.01D(1) General 41-10.01D(2) Quality Control 41-10.01D(3) Department Acceptance 41-10.01D(4) Reserved 41-10.02 MATERIALS 41-10.02A General 41-10.02B Reserved 41-10.03 CONSTRUCTION 41-10.03A General |
560 | 41-10.03B Tie Bar Tolerance 41-10.03C Dowel Bar Tolerance 41-10.03D Reserved 41-10.04 PAYMENT 41-11.01 GENERAL 41-11.02 MATERIALS 41-11.03 CONSTRUCTION 41-11.03A General 41-11.03B Remove Concrete Pavement |
561 | 41-11.03C Remove Base 41-11.04 PAYMENT |
563 | 42 GROOVE AND GRIND CONCRETE 42-1.01 GENERAL 42-1.02 MATERIALS 42-1.03 CONSTRUCTION 42-1.04 PAYMENT 42-2.01 GENERAL 42-2.01A Summary 42-2.01B Definitions 42-2.01C Submittals 42-2.01D Quality Assurance 42-2.01D(1) General 42-2.01D(2) Department Acceptance 42-2.02 MATERIALS 42-2.03 CONSTRUCTION |
564 | 42-2.04 PAYMENT 42-3.01 GENERAL 42-3.01A Summary 42-3.01B Definitions 42-3.01C Submittals 42-3.01D Quality Assurance 42-3.01D(1) General 42-3.01D(2) Quality Control 42-3.01D(3) Department Acceptance 42-3.02 MATERIALS 42-3.03 CONSTRUCTION 42-3.03A General |
565 | 42-3.03B Pavement 42-3.03C Bridge Decks, Approach Slabs, and Approach Pavement 42-3.04 PAYMENT 43–44 RESERVED |
567 | DIVISION VI STRUCTURES 45 GENERAL 45-1.01 GENERAL 45-1.02 MATERIALS 45-1.03 CONSTRUCTION 45-1.04 PAYMENT |
569 | 46 GROUND ANCHORS AND SOIL NAILS 46-1.01 GENERAL 46-1.01A Summary 46-1.01B Definitions 46-1.01C Submittals 46-1.01C(1) General 46-1.01C(2) Shop Drawings 46-1.01C(2)(a) General 46-1.01C(2)(b) Ground Anchor Shop Drawings 46-1.01C(2)(c) Soil Nail Shop Drawings |
570 | 46-1.01C(3) Test Data 46-1.01D Quality Assurance 46-1.01D(1) General 46-1.01D(2) Quality Control 46-1.01D(2)(a) General 46-1.01D(2)(b) Load Testing 46-1.01D(2)(b)(i) General 46-1.01D(2)(b)(ii) Jacking Equipment and Calibration 46-1.01D(2)(b)(iii) Measuring Movements |
571 | 46-1.01D(2)(b)(iv) Procedure 46-1.01D(3) Department Acceptance 46-1.02 MATERIALS 46-1.02A General 46-1.02B Sheathing 46-1.02C Grout 46-1.03 CONSTRUCTION 46-1.03A General 46-1.03B Drilling |
572 | 46-1.03C Installation 46-1.03D Grouting 46-1.03E Research Investigation 46-1.04 PAYMENT 46-2.01 GENERAL 46-2.01A Summary 46-2.01B Definitions |
573 | 46-2.01C Submittals 46-2.01D Quality Assurance 46-2.01D(1) General 46-2.01D(2) Quality Control 46-2.01D(2)(a) General 46-2.01D(2)(b) Load Testing 46-2.01D(2)(b)(i) General 46-2.01D(2)(b)(ii) Test Procedure |
574 | 46-2.01D(3) Department Acceptance 46-2.01D(3)(a) General 46-2.01D(3)(b) Load Testing 46-2.01D(3)(b)(i) General 46-2.01D(3)(b)(ii) Acceptance Criteria |
575 | 46-2.02 MATERIALS 46-2.02A General 46-2.02B Steel 46-2.02C Sheathing 46-2.02C(1) General 46-2.02C(2) Smooth Plastic Sheathing 46-2.02C(3) Corrugated Plastic Sheathing 46-2.02D Strand Coating and Encapsulation |
576 | 46-2.02E Grout 46-2.03 CONSTRUCTION 46-2.03A General |
577 | 46-2.03B Bar Tendons 46-2.03C Strand Tendons 46-2.03D Lock-off |
578 | 46-2.04 PAYMENT 46-3.01 GENERAL 46-3.01A Summary 46-3.01B Definitions 46-3.01C Submittals 46-3.01C(1) General 46-3.01C(2) Test Boring Report 46-3.01D Quality Assurance 46-3.01D(1) General 46-3.01D(2) Quality Control 46-3.01D(2)(a) General |
579 | 46-3.01D(2)(b) Load Testing 46-3.01D(2)(b)(i) General 46-3.01D(2)(b)(ii) Test Procedure 46-3.01D(2)(b)(ii)(1) General 46-3.01D(2)(b)(ii)(2) Verification Test |
580 | 46-3.01D(2)(b)(ii)(3) Proof Test |
581 | 46-3.01D(2)(b)(ii)(4) Supplemental Test 46-3.01D(2)(c) Grout 46-3.01D(3) Department Acceptance 46-3.01D(3)(a) General 46-3.01D(3)(b) Load Testing 46-3.01D(3)(b)(i) General 46-3.01D(3)(b)(ii) Acceptance Criteria |
582 | 46-3.02 MATERIALS 46-3.02A General 46-3.02B Steel 46-3.02C Bar Reinforcement 46-3.02D Sheathing 46-3.02E Grout 46-3.03 CONSTRUCTION 46-3.03A General |
583 | 46-3.03B Test Soil Nails 46-3.03C Installation 46-3.04 PAYMENT |
585 | 47 EARTH RETAINING SYSTEMS 47-1.01 GENERAL 47-1.02 MATERIALS 47-1.03 CONSTRUCTION 47-1.04 PAYMENT 47-2.01 GENERAL 47-2.01A Summary 47-2.01B Definitions 47-2.01C Submittals 47-2.01D Quality Assurance 47-2.01D(1) General 47-2.01D(2) Quality Control 47-2.02 MATERIAL 47-2.02A General |
586 | 47-2.02B Face Panels 47-2.02C Structure Backfill |
587 | 47-2.02D Permeable Material |
588 | 47-2.02E Soil Reinforcement 47-2.03 CONSTRUCTION 47-2.03A General 47-2.03B Earthwork 47-2.03B(1) General |
589 | 47-2.03B(2) Soil Reinforcement 47-2.03B(3) Face Panels 47-2.03C Filter Fabric |
590 | 47-2.03D Leveling Pads 47-2.04 PAYMENT 47-3.01 GENERAL 47-3.02 MATERIALS 47-3.02A General 47-3.02B Crib Members 47-3.02B(1) General 47-3.02B(2) Reinforcement |
591 | 47-3.02B(3) Concrete 47-3.03 CONSTRUCTION 47-3.04 PAYMENT 47-5.01 GENERAL 47-5.02 MATERIALS 47-5.03 CONSTRUCTION |
592 | 47-5.04 PAYMENT 47-6.01 GENERAL 47-6.01A Summary 47-6.01B Definitions 47-6.01C Submittals 47-6.01C(1) General 47-6.01C(2) Shop Drawings 47-6.01C(3) Certificates 47-6.01D Quality Assurance |
593 | 47-6.02 MATERIALS 47-6.03 CONSTRUCTION 47-6.04 PAYMENT |
595 | 48 TEMPORARY STRUCTURES 48-1.01 GENERAL 48-1.02 MATERIALS 48-1.03 CONSTRUCTION 48-1.04 PAYMENT 48-2.01 GENERAL 48-2.01A Summary 48-2.01B Definitions 48-2.01C Submittals 48-2.01C(1) General |
596 | 48-2.01C(2) Shop Drawings |
597 | 48-2.01D Quality Assurance 48-2.01D(1) General 48-2.01D(2) Welding and Nondestructive Testing 48-2.02 MATERIALS 48-2.02A General 48-2.02B Design Criteria 48-2.02B(1) General |
598 | 48-2.02B(2) Loads |
599 | 48-2.02B(3) Stresses, Loadings, and Deflections 48-2.02B(3)(a) General 48-2.02B(3)(b) Timber |
600 | 48-2.02B(3)(c) Steel 48-2.02B(3)(d) Manufactured Assemblies 48-2.02B(4) Special Locations |
601 | 48-2.03 CONSTRUCTION 48-2.03A General 48-2.03B Foundations |
602 | 48-2.03C Erection 48-2.03D Removal |
603 | 48-2.03E Falsework Lighting 48-2.03E(1) General |
604 | 48-2.03E(2) Pavement Illumination 48-2.03E(3) Portal Illumination 48-2.03E(4) Pedestrian Walkway Illumination 48-2.04 PAYMENT 48-3.01 GENERAL 48-3.01A Summary |
605 | 48-3.01B Definitions 48-3.01C Submittals 48-3.01C(1) General 48-3.01C(2) Shop Drawings 48-3.01D Quality Assurance 48-3.01D(1) General |
606 | 48-3.01D(2) Displacement Monitoring 48-3.02 MATERIALS 48-3.02A General 48-3.02B Design Criteria |
607 | 48-3.03 CONSTRUCTION 48-3.04 PAYMENT |
608 | 48-4.01 GENERAL 48-4.01A Summary 48-4.01B Definitions 48-4.01C Submittals 48-4.01D Quality Assurance 48-4.02 MATERIALS 48-4.03 CONSTRUCTION |
609 | 48-4.04 PAYMENT 48-5.01 GENERAL 48-5.01A Summary 48-5.01B Definitions 48-5.01C Submittals |
610 | 48-5.01D Quality Assurance 48-5.01D(1) General 48-5.01D(2) Displacement Monitoring 48-5.02 MATERIALS 48-5.02A General 48-5.02B Design Criteria 48-5.03 CONSTRUCTION |
611 | 48-5.04 PAYMENT |
613 | 49 PILING 49-1.01 GENERAL 49-1.01A Summary 49-1.01B Definitions 49-1.01C Submittals 49-1.01C(1) General 49-1.01C(2) Test Borings 49-1.01D Quality Assurance 49-1.01D(1) General 49-1.01D(2) Determination of Length |
614 | 49-1.01D(3) Load Test Piles |
615 | 49-1.01D(4) Dynamic Monitoring 49-1.01D(5) Test Borings |
616 | 49-1.02 MATERIALS 49-1.03 CONSTRUCTION 49-1.04 PAYMENT 49-2.01 GENERAL 49-2.01A General 49-2.01A(1) Summary |
617 | 49-2.01A(2) Definitions 49-2.01A(3) Submittals 49-2.01A(3)(a) General 49-2.01A(3)(b) Driving System Submittal |
618 | 49-2.01A(4) Quality Assurance 49-2.01A(4)(a) General 49-2.01A(4)(b) Quality Control 49-2.01A(4)(c) Department Acceptance 49-2.01B Materials 49-2.01C Construction 49-2.01C(1) General 49-2.01C(2) Driving Equipment |
619 | 49-2.01C(3) Drilling 49-2.01C(4) Predrilled Holes 49-2.01C(5) Driving 49-2.01C(6) Pile Cutoff 49-2.01D Payment 49-2.02 STEEL PIPE PILING 49-2.02A General 49-2.02A(1) Summary 49-2.02A(2) Definitions |
620 | 49-2.02A(3) Submittals 49-2.02A(3)(a) General 49-2.02A(3)(b) Shop Drawings 49-2.02A(3)(c) Inspection Request Form 49-2.02A(3)(d) Certificate of Compliance 49-2.02A(4) Quality Assurance 49-2.02A(4)(a) General 49-2.02A(4)(b) Quality Control 49-2.02A(4)(b)(i) General 49-2.02A(4)(b)(ii) Plant Audit 49-2.02A(4)(b)(iii) Nondestructive Testing 49-2.02A(4)(b)(iii)(A) General 49-2.02A(4)(b)(iii)(B) Shop Welds |
621 | 49-2.02A(4)(b)(iii)(C) Field Welds 49-2.02A(4)(c) Department Acceptance 49-2.02B Materials 49-2.02B(1) General 49-2.02B(1)(a) General |
622 | 49-2.02B(1)(b) Circumferential Welds 49-2.02B(1)(c) Tolerances 49-2.02B(1)(d) Markings |
623 | 49-2.02B(1)(e) Substitutions 49-2.02B(2) Class N Steel Pipe Piling 49-2.02B(3) Class R Steel Pipe Piling 49-2.02C Construction 49-2.02C(1) General 49-2.02C(2) Field Welds |
624 | 49-2.02D Payment 49-2.03 STRUCTURAL SHAPE STEEL PILING 49-2.03A General 49-2.03A(1) Summary 49-2.03A(2) Definitions 49-2.03A(3) Submittals 49-2.03A(4) Quality Assurance 49-2.03B Materials 49-2.03C Construction 49-2.03D Payment 49-2.04 PRECAST PRESTRESSED CONCRETE PILING 49-2.04A General 49-2.04A(1) Summary 49-2.04A(2) Definitions 49-2.04A(3) Submittals |
625 | 49-2.04A(4) Quality Assurance 49-2.04B Materials 49-2.04B(1) General 49-2.04B(2) Fabrication 49-2.04B(3) Substitutions 49-2.04C Construction 49-2.04C(1) General 49-2.04C(2) Handling 49-2.04C(3) Splicing Precast Prestressed Concrete Piles |
626 | 49-2.04D Payment 49-2.05 STEEL SHEET PILING 49-2.05A General 49-2.05B Materials 49-2.05C Construction 49-2.05D Payment 49-3.01 GENERAL 49-3.01A General 49-3.01B Materials 49-3.01B(1) General 49-3.01B(2) Mass Concrete |
627 | 49-3.01C Construction 49-3.01D Payment 49-3.02 CAST-IN-DRILLED-HOLE CONCRETE PILING 49-3.02A General 49-3.02A(1) Summary 49-3.02A(2) Definitions 49-3.02A(3) Submittals 49-3.02A(3)(a) General 49-3.02A(3)(b) Pile Installation Plan |
628 | 49-3.02A(3)(c) Inspection Pipe Coupler Log 49-3.02A(3)(d) Concrete Placement Log 49-3.02A(3)(e) Coring Logs and Concrete Cores 49-3.02A(3)(f) Testing Report 49-3.02A(3)(g) Mitigation Plans |
629 | 49-3.02A(3)(h) Mitigation Report 49-3.02A(3)(i) Plastic Spacer Manufacturer’s Data and Sample 49-3.02A(4) Quality Assurance 49-3.02A(4)(a) General 49-3.02A(4)(b) Preconstruction Meeting |
630 | 49-3.02A(4)(c) Quality Control 49-3.02A(4)(d) Department Acceptance 49-3.02A(4)(d)(i) General 49-3.02A(4)(d)(ii) Gamma-Gamma Logging 49-3.02A(4)(d)(iii) Rejected Piles |
631 | 49-3.02B Materials 49-3.02B(1) General 49-3.02B(2) Concrete |
632 | 49-3.02B(3) Aggregate Gradation 49-3.02B(4) Permanent Steel Casings 49-3.02B(5) Grout 49-3.02B(6) Slurry 49-3.02B(6)(a) General 49-3.02B(6)(b) Mineral Slurry |
633 | 49-3.02B(6)(c) Synthetic Slurry |
634 | 49-3.02B(6)(d) Water Slurry 49-3.02B(7) Reserved 49-3.02B(8) Spacers 49-3.02B(9)–49-3.02B(10) Reserved 49-3.02C Construction 49-3.02C(1) General 49-3.02C(2) Drilled Holes |
635 | 49-3.02C(3) Temporary Steel Casings 49-3.02C(4) Reinforcement 49-3.02C(5) Vertical Inspection Pipes |
636 | 49-3.02C(6) Permanent Steel Casing Installation |
637 | 49-3.02C(7) Construction Joint 49-3.02C(8) Placing Concrete 49-3.02C(9) Placing Concrete Under Slurry |
638 | 49-3.02D Payment 49-3.03 DRIVEN STEEL SHELLS FILLED WITH CONCRETE AND REINFORCEMENT 49-3.03A General 49-3.03A(1) Summary |
639 | 49-3.03A(2) Definitions 49-3.03A(3) Submittals 49-3.03A(4) Quality Assurance 49-3.03B Materials 49-3.03C Construction 49-3.03C(1) General 49-3.03C(2) Open-Ended Steel Shells |
640 | 49-3.03C(3) Close-Ended Steel Shells 49-3.03D Payment 49-4.01 GENERAL 49-4.02 MATERIALS 49-4.03 CONSTRUCTION 49-4.03A General 49-4.03B Drilled Holes 49-4.04 PAYMENT |
641 | 50 PRESTRESSING CONCRETE 50-1.01 GENERAL 50-1.01A Summary 50-1.01B Definitions 50-1.01C Submittals 50-1.01C(1) General 50-1.01C(2) Certifications 50-1.01C(3) Shop Drawings |
642 | 50-1.01C(4) Alternative Prestressing Systems for Cast-In-Place Prestressed Box Girder Bridges 50-1.01C(5) Test Samples |
643 | 50-1.01C(6) Grouting Plan 50-1.01C(7) Daily Grouting Report 50-1.01D Quality Assurance 50-1.01D(1) General 50-1.01D(2) Quality Control 50-1.01D(2)(a) General |
644 | 50-1.01D(2)(b) Equipment and Calibration 50-1.01D(2)(c) Pressure Testing Ducts 50-1.01D(2)(d) Duct Demonstrations for Post-Tensioned Members |
645 | 50-1.01D(2)(e) Void Investigation 50-1.01D(2)(f) Personnel Qualifications 50-1.01D(3) Department Acceptance 50-1.02 MATERIALS 50-1.02A General 50-1.02B Prestressing Steel |
646 | 50-1.02C Grout 50-1.02D Ducts |
647 | 50-1.02E Vents 50-1.02F Permanent Grout Caps 50-1.02G Debonding Sheathing 50-1.02H Anchorage System 50-1.03 CONSTRUCTION 50-1.03A General 50-1.03A(1) General |
648 | 50-1.03A(2) Epoxy-Coated Strand 50-1.03A(3) Ducts 50-1.03A(4) Vents 50-1.03B Prestressing 50-1.03B(1) General 50-1.03B(2) Post-Tensioned Members 50-1.03B(2)(a) General |
649 | 50-1.03B(2)(b) Losses 50-1.03B(2)(c) Anchorages and Distribution 50-1.03B(2)(d) Bonding and Grouting 50-1.03B(2)(d)(i) General |
650 | 50-1.03B(2)(d)(ii) Grouting Equipment 50-1.03B(2)(d)(iii) Mixing and Proportioning 50-1.03B(2)(d)(iv) Placing 50-1.03B(2)(d)(v) Weather Conditions 50-1.03B(2)(d)(vi) Curing |
651 | 50-1.03B(2)(d)(vii) Grout Storage 50-1.03B(2)(d)(viii) Blockages 50-1.03B(2)(d)(ix) Secondary Grouting 50-1.03B(2)(d)(x) Vertical Tendon Grouting 50-1.03B(3) Pretensioned Members 50-1.03B(3)(a) General |
652 | 50-1.03B(3)(b) Debonding Prestressing Strands 50-1.04 PAYMENT |
653 | 51 CONCRETE STRUCTURES 51-1.01 GENERAL 51-1.01A Summary 51-1.01B Definitions 51-1.01C Submittals 51-1.01C(1) General 51-1.01C(2) Permanent Steel Deck Forms |
654 | 51-1.01C(3) Bonding Materials 51-1.01C(4) Rapid Strength Concrete 51-1.01C(5) Chemical Adhesives 51-1.01C(6) Colored Concrete 51-1.01C(7) Hinge Tiedowns 51-1.01D Quality Assurance 51-1.01D(1) General 51-1.01D(2) Quality Control 51-1.01D(2)(a) General 51-1.01D(2)(b) Rapid Strength Concrete |
655 | 51-1.01D(2)(c) Test Panels 51-1.01D(3) Department Acceptance 51-1.01D(3)(a) General 51-1.01D(3)(b) Testing Concrete Surfaces 51-1.01D(3)(b)(i) General 51-1.01D(3)(b)(ii) Surface Smoothness |
656 | 51-1.01D(3)(b)(iii) Coefficient of Friction 51-1.01D(3)(b)(iv) Crack Intensity 51-1.02 MATERIALS 51-1.02A General 51-1.02B Concrete |
657 | 51-1.02C Bonding Materials 51-1.02D Rapid Strength Concrete |
658 | 51-1.02E Colored Concrete 51-1.02F Mortar 51-1.02G Grout 51-1.02H Chemical Adhesives 51-1.02I Miscellaneous Metal 51-1.02J Miscellaneous Materials 51-1.03 CONSTRUCTION 51-1.03A General 51-1.03B Methods and Equipment |
659 | 51-1.03C Preparation 51-1.03C(1) General 51-1.03C(2) Forms 51-1.03C(2)(a) General |
660 | 51-1.03C(2)(b) Removing Forms 51-1.03C(2)(c) Permanent Steel Deck Forms 51-1.03C(2)(c)(i) General |
661 | 51-1.03C(2)(c)(ii) Design Requirements 51-1.03C(2)(c)(iii) Installation 51-1.03D Placing Concrete 51-1.03D(1) General |
662 | 51-1.03D(2) Concrete Bridge Decks 51-1.03D(3) Concrete Placed Under Water |
663 | 51-1.03D(4) Construction Joints 51-1.03D(5) Colored Concrete 51-1.03D(6) Bearing Surfaces |
664 | 51-1.03D(7) Pier Columns 51-1.03E Miscellaneous Construction 51-1.03E(1) General 51-1.03E(2) Placing Mortar 51-1.03E(3) Drill and Bond Dowels 51-1.03E(4) Drill and Grout Dowels |
665 | 51-1.03E(5) Drill and Bond Dowels (Chemical Adhesive) 51-1.03E(6) Nonskid Abrasive Finish 51-1.03E(7) Drains in Walls 51-1.03E(8) Deck Bleeder Drains 51-1.03E(9) Utility Facilities |
666 | 51-1.03E(10) Concrete Headers and Steel Plates 51-1.03E(11) Diaphragm Bolsters 51-1.03E(12) Hinge Tiedowns 51-1.03F Finishing Concrete 51-1.03F(1) General 51-1.03F(2) Ordinary Surface Finish 51-1.03F(3) Class 1 Surface Finish |
667 | 51-1.03F(4) Class 2 Surface Finish 51-1.03F(5) Finishing Roadway Surfaces 51-1.03F(5)(a) General |
668 | 51-1.03F(5)(b) Bridge Deck Surface Texture 51-1.03F(5)(b)(i) General 51-1.03F(5)(b)(ii) Grinding and Grooving 51-1.03F(5)(b)(iii) Longitudinal Tining |
669 | 51-1.03F(6) Finishing Pedestrian Overcrossing Surfaces 51-1.03G Concrete Surface Textures 51-1.03G(1) General 51-1.03G(2) Form Liners |
670 | 51-1.03H Curing Concrete Structures |
671 | 51-1.03I Protecting Concrete Structures 51-1.04 PAYMENT 51-2.01 GENERAL 51-2.01A General 51-2.01A(1) Summary 51-2.01A(2) Definitions 51-2.01A(3) Submittals 51-2.01A(4) Quality Assurance 51-2.01B Materials 51-2.01B(1) General 51-2.01B(2) Snowplow Deflectors |
672 | 51-2.01C Construction 51-2.01C(1) General 51-2.01C(2) Snowplow Deflectors 51-2.01D Payment 51-2.02 SEALED JOINTS 51-2.02A General 51-2.02A(1) General 51-2.02A(1)(a) Summary 51-2.02A(1)(b) Definitions |
673 | 51-2.02A(1)(c) Submittals 51-2.02A(1)(d) Quality Assurance 51-2.02A(2) Materials 51-2.02A(3) Construction 51-2.02A(4) Payment 51-2.02B Type A and AL Joint Seals 51-2.02B(1) General 51-2.02B(1)(a) Summary 51-2.02B(1)(b) Definitions 51-2.02B(1)(c) Submittals |
674 | 51-2.02B(1)(d) Quality Assurance 51-2.02B(1)(d)(i) General 51-2.02B(1)(d)(ii) Department Acceptance 51-2.02B(2) Materials 51-2.02B(3) Construction 51-2.02B(3)(a) General 51-2.02B(3)(b) Type A Seal Preparation |
675 | 51-2.02B(3)(c) Type AL Seal Preparation 51-2.02B(4) Payment 51-2.02C Type B Joint Seals 51-2.02C(1) General 51-2.02C(1)(a) Summary 51-2.02C(1)(b) Definitions 51-2.02C(1)(c) Submittals 51-2.02C(1)(d) Quality Assurance 51-2.02C(1)(d)(i) General 51-2.02C(1)(d)(ii) Quality Control 51-2.02C(1)(d)(iii) Department Acceptance 51-2.02C(2) Materials |
676 | 51-2.02C(3) Construction 51-2.02C(4) Payment 51-2.02D Joint Seal Assemblies with a Movement Rating of 4 inches or Less 51-2.02D(1) General 51-2.02D(1)(a) Summary 51-2.02D(1)(b) Definitions 51-2.02D(1)(c) Submittals 51-2.02D(1)(c)(i) General |
677 | 51-2.02D(1)(c)(ii) Shop Drawings 51-2.02D(1)(d) Quality Assurance 51-2.02D(2) Materials 51-2.02D(2)(a) General 51-2.02D(2)(b) Alternative Joint Seal Assemblies |
678 | 51-2.02D(3) Construction 51-2.02D(4) Payment 51-2.02E Joint Seal Assemblies with a Movement Rating Over 4 inches 51-2.02E(1) General 51-2.02E(1)(a) Summary 51-2.02E(1)(b) Definitions 51-2.02E(1)(c) Submittals 51-2.02E(1)(c)(i) General 51-2.02E(1)(c)(ii) Shop Drawings |
679 | 51-2.02E(1)(c)(iii) Certificate of Compliance 51-2.02E(1)(d) Quality Assurance 51-2.02E(1)(d)(i) General 51-2.02E(1)(d)(ii) Quality Control 51-2.02E(1)(d)(iii) Department Acceptance 51-2.02E(2) Materials 51-2.02E(2)(a) General 51-2.02E(2)(b) Design Requirements |
680 | 51-2.02E(3) Construction 51-2.02E(4) Payment 51-2.02F Asphaltic Plug Joint Seals 51-2.02F(1) General 51-2.02F(1)(a) Summary 51-2.02F(1)(b) Definitions 51-2.02F(1)(c) Submittals 51-2.02F(1)(c)(i) General 51-2.02F(1)(c)(ii) Shop Drawings 51-2.02F(1)(c)(iii) Product Data 51-2.02F(1)(c)(iv) Certificate of Compliance 51-2.02F(1)(c)(v) Samples 51-2.02F(1)(d) Quality Assurance 51-2.02F(1)(d)(i) General |
681 | 51-2.02F(1)(d)(ii) Quality Control 51-2.02F(2) Materials 51-2.02F(3) Construction |
682 | 51-2.02F(4) Payment 51-2.03 SLIDING JOINTS 51-2.03A General 51-2.03B Materials 51-2.03C Construction 51-2.03D Payment 51-2.04 WATERSTOPS 51-2.04A General 51-2.04A(1) Summary 51-2.04A(2) Definitions |
683 | 51-2.04A(3) Submittals 51-2.04A(4) Quality Assurance 51-2.04B Materials 51-2.04C Construction |
684 | 51-2.04D Payment 51-2.05 STRIP WATERSTOPS 51-2.05A General 51-2.05B Materials 51-2.05C Construction 51-2.05D Payment 51-3.01 GENERAL 51-3.01A General 51-3.01B Materials 51-3.01C Construction 51-3.01D Payment |
685 | 51-3.02 ELASTOMERIC BEARING PADS 51-3.02A General 51-3.02A(1) Summary 51-3.02A(2) Definitions 51-3.02A(3) Submittals 51-3.02A(3)(a) General 51-3.02A(3)(b) Samples 51-3.02A(3)(b)(i) General 51-3.02A(3)(b)(ii) Plain Elastomeric Bearing Pads 51-3.02A(3)(b)(iii) Steel-Reinforced Elastomeric Bearing Pads 51-3.02A(3)(c) Certificate of Compliance 51-3.02A(3)(c)(i) General 51-3.02A(3)(c)(ii) Plain Elastomeric Bearing Pads 51-3.02A(3)(c)(iii) Steel-Reinforced Elastomeric Bearing Pads 51-3.02A(4) Quality Assurance 51-3.02A(4)(a) General 51-3.02A(4)(b) Department Acceptance 51-3.02A(4)(b)(i) General |
686 | 51-3.02A(4)(b)(ii) Plain Elastomeric Bearing Pads 51-3.02A(4)(b)(iii) Steel-Reinforced Elastomeric Bearing Pads 51-3.02B Materials 51-3.02B(1) General 51-3.02B(2) Plain Elastomeric Bearing Pads |
687 | 51-3.02B(3) Steel-Reinforced Elastomeric Bearing Pads 51-3.02C Construction 51-3.02D Payment 51-3.03 PTFE SPHERICAL BEARINGS 51-3.03A General 51-3.03A(1) Summary 51-3.03A(2) Definitions |
688 | 51-3.03A(3) Submittals 51-3.03A(3)(a) General 51-3.03A(3)(b) Shop Drawings 51-3.03A(4) Quality Assurance 51-3.03A(4)(a) General 51-3.03A(4)(b) Quality Control 51-3.03A(4)(b)(i) General 51-3.03A(4)(b)(ii) Proof Testing |
689 | 51-3.03B Materials 51-3.03B(1) General 51-3.03B(2) Fabrication |
690 | 51-3.03C Construction 51-3.03D Payment 51-3.04–51-3.05 RESERVED 51-4.01 GENERAL 51-4.01A Summary 51-4.01B Definitions |
691 | 51-4.01C Submittals 51-4.01C(1) General 51-4.01C(2) Shop Drawings 51-4.01C(2)(a) General 51-4.01C(2)(b) Girders 51-4.01C(2)(c) Closure Wall Panels 51-4.01C(2)(d) Box Culverts 51-4.01C(2)(e) Deck Panels 51-4.01D Quality Assurance 51-4.01D(1) General |
692 | 51-4.01D(2) Quality Control 51-4.01D(3) Department Acceptance 51-4.02 MATERIALS 51-4.02A General 51-4.02B Delivery, Storage, and Handling 51-4.02C Materials 51-4.02D Fabricating Precast Concrete Members 51-4.02D(1) General 51-4.02D(2) Girders, Box Girders, and Double T Girders |
693 | 51-4.02D(3) Slabs 51-4.02D(4) Closure Wall Panels 51-4.02D(5) Box Culverts 51-4.02D(6) Lagging 51-4.02D(7) Deck Panels |
694 | 51-4.03 CONSTRUCTION 51-4.03A General 51-4.03B Girders, Box Girders, and Double T Girders 51-4.03C Slabs |
695 | 51-4.03D Closure Wall Panels 51-4.03E Box Culverts 51-4.03F Lagging 51-4.03G Deck Panels 51-4.04 PAYMENT 51-5.01 GENERAL 51-5.01A Summary 51-5.01B Definitions 51-5.01C Submittals 51-5.01D Quality Assurance 51-5.01D(1) General |
696 | 51-5.01D(2) Quality Control 51-5.01D(2)(a) General 51-5.01D(2)(b) Rapid Strength Concrete 51-5.02 MATERIALS 51-5.02A General 51-5.02B Fabric 51-5.02C Concrete |
697 | 51-5.02D Aggregate Base 51-5.02E Bar Reinforcement 51-5.02F Miscellaneous Joint Materials 51-5.02G Hot Mix Asphalt 51-5.03 CONSTRUCTION 51-5.03A General 51-5.03B Type N Approach Slabs 51-5.03B(1) General |
698 | 51-5.03B(2) Filter Fabric 51-5.03B(3) Treated Permeable Base 51-5.03C Type EQ Approach Slabs 51-5.03D Type R Approach Slabs 51-5.03D(1) General 51-5.03D(2) Removal of Existing Facilities 51-5.03D(3) Existing Base Material |
699 | 51-5.03D(4) Aggregate Base 51-5.03D(5) Profile Grade 51-5.03D(6) Temporary Roadway Structural Section 51-5.03E Paving Notch Extensions 51-5.04 PAYMENT |
700 | 51-6.01 GENERAL 51-6.01A Summary 51-6.01B Definitions 51-6.01C Submittals 51-6.01D Quality Assurance 51-6.01D(1) General 51-6.01D(2) Quality Control 51-6.01D(2)(a) General 51-6.01D(2)(b) Temperature Monitoring |
701 | 51-6.02 MATERIALS 51-6.03 CONSTRUCTION 51-6.04 PAYMENT 51-7.01 GENERAL 51-7.01A General |
702 | 51-7.01B Materials 51-7.01C Construction 51-7.01D Payment 51-7.02 PRECAST DRAINAGE INLETS |
703 | 52 REINFORCEMENT 52-1.01 GENERAL 52-1.01A Summary 52-1.01B Definitions 52-1.01C Submittals 52-1.01C(1) General 52-1.01C(2) Shop Drawings |
704 | 52-1.01C(3) Certificates 52-1.01D Quality Assurance 52-1.02 MATERIALS 52-1.02A General 52-1.02B Bar Reinforcement |
705 | 52-1.02C Welded Wire Reinforcement 52-1.02D Reinforcing Wire 52-1.03 CONSTRUCTION 52-1.03A General 52-1.03B Cleaning 52-1.03C Bending 52-1.03D Placing |
706 | 52-1.04 PAYMENT |
707 | 52-2.01 GENERAL 52-2.01A General 52-2.01A(1) Summary 52-2.01A(2) Definitions 52-2.01A(3) Submittals 52-2.01A(3)(a) General 52-2.01A(3)(b) Samples 52-2.01A(3)(b)(i) General 52-2.01A(3)(b)(ii) Epoxy Powder Test Samples 52-2.01A(3)(b)(iii) Patching Material Test Samples 52-2.01A(3)(b)(iv) Test Samples 52-2.01A(4) Quality Assurance 52-2.01B Materials |
708 | 52-2.01C Construction 52-2.01D Payment 52-2.02 EPOXY-COATED REINFORCEMENT 52-2.02A General 52-2.02A(1) Summary 52-2.02A(2) Definitions 52-2.02A(3) Submittals 52-2.02A(3)(a) General 52-2.02A(3)(b) Test Samples 52-2.02A(3)(c) Certificates |
709 | 52-2.02A(4) Quality Assurance 52-2.02A(4)(a) General 52-2.02A(4)(b) Department Acceptance 52-2.02B Materials 52-2.02C Construction 52-2.02D Payment 52-2.03 EPOXY-COATED PREFABRICATED REINFORCEMENT 52-2.03A General 52-2.03A(1) Summary 52-2.03A(2) Definitions 52-2.03A(3) Submittals 52-2.03A(3)(a) General 52-2.03A(3)(b) Test Samples |
710 | 52-2.03A(3)(c) Certificates 52-2.03A(4) Quality Assurance 52-2.03A(4)(a) General 52-2.03A(4)(b) Department Acceptance 52-2.03B Materials 52-2.03C Construction 52-2.03D Payment 52-3.01 GENERAL |
711 | 52-3.02 MATERIALS 52-3.03 CONSTRUCTION 52-3.04 PAYMENT 52-5.01 GENERAL 52-5.01A Summary 52-5.01B Definitions 52-5.01C Submittals 52-5.01C(1) General 52-5.01C(2) Samples 52-5.01C(2)(a) General 52-5.01C(2)(b) Test Samples 52-5.01C(3) Test Reports |
712 | 52-5.01C(4) Certificates 52-5.01D Quality Assurance 52-5.01D(1) General 52-5.01D(2) Qualifications 52-5.01D(3) Test Samples 52-5.01D(4) Quality Control 52-5.01D(4)(a) General 52-5.01D(4)(b) Quality Control Testing |
713 | 52-5.01D(4)(c) Quality Control Test Report 52-5.01D(5) Department Acceptance 52-5.02 MATERIALS |
714 | 52-5.03 CONSTRUCTION 52-5.04 PAYMENT 52-6.01 GENERAL 52-6.01A Summary 52-6.01B Definitions 52-6.01C Submittals 52-6.01C(1) General 52-6.01C(2) Product Data 52-6.01C(2)(a) General 52-6.01C(2)(b) Radiographic Film Developing Process Records 52-6.01C(3) Samples 52-6.01C(3)(a) General 52-6.01C(3)(b) Test Samples 52-6.01C(4) Test Reports 52-6.01C(4)(a) General 52-6.01C(4)(b) Splicing Quality Control Test Report |
715 | 52-6.01C(4)(c) Splice Rejection Mitigation Report 52-6.01C(5) Certificates 52-6.01C(6) Qualification Statements 52-6.01C(6)(a) General 52-6.01C(6)(b) Welder and Welding Procedures Qualifications 52-6.01C(6)(c) Splice Prequalification Report 52-6.01C(6)(d) Weld Flash Removal Process 52-6.01D Quality Assurance 52-6.01D(1) General |
716 | 52-6.01D(2) Qualifications 52-6.01D(2)(a) General 52-6.01D(2)(b) Operator and Procedure Prequalification 52-6.01D(2)(c) Welder and Welding Procedure Qualifications 52-6.01D(3) Test Samples 52-6.01D(3)(a) General 52-6.01D(3)(b) Ultimate Butt Splice 52-6.01D(4) Quality Control 52-6.01D(4)(a) General |
717 | 52-6.01D(4)(b) Quality Control Testing 52-6.01D(4)(b)(i) General 52-6.01D(4)(b)(ii) Total Slip Testing 52-6.01D(4)(b)(iii) Service Splice Testing |
718 | 52-6.01D(4)(b)(iv) Ultimate Butt Splice Testing |
719 | 52-6.01D(4)(c) Weld Flash Removal Process 52-6.01D(4)(d) Splicing Quality Control Test Report 52-6.01D(5) Department Acceptance 52-6.02 MATERIALS 52-6.02A General 52-6.02B Service Splices and Ultimate Butt Splices 52-6.02B(1) General 52-6.02B(2) Service Splices |
720 | 52-6.02B(3) Ultimate Butt Splices 52-6.03 CONSTRUCTION 52-6.03A General 52-6.03B Lap Splicing |
721 | 52-6.03C Service Splices and Ultimate Butt Splices 52-6.03C(1) General 52-6.03C(2) Mechanical Splices 52-6.03C(3) Resistance-Butt-Welded Splices 52-6.03C(4) Complete-Joint-Penetration Butt-Welded Splices |
722 | 52-6.04 PAYMENT 52-7.01 GENERAL 52-7.01A Summary 52-7.01B Definitions 52-7.01C Submittals 52-7.01D Quality Assurance 52-7.01D(1) General 52-7.01D(2) Prestressing Tendon Connection 52-7.01D(3)–52-7.01D(5) Reserved 52-7.02 MATERIALS 52-7.02A General 52-7.02B Prestressing Tendon Connection 52-7.02C Bar Reinforcing Steel Connection 52-7.02D Copper Cable to Bar Reinforcing Steel Connection |
723 | 52-7.02E Pile and Concrete Epoxy Insulation 52-7.02F Concrete Insulation Course 52-7.02G Neoprene Sheet Insulation 52-7.02H Joint Sealant Insulation 52-7.02I Membrane Insulation 52-7.02J Mortar Block Insulation 52-7.02K Epoxy-Coated Reinforcing Steel Insulation 52-7.02L Plastic End Cover Insulators 52-7.02M Pipe Wrapping Tape Insulation 52-7.02N Epoxy for Insulation of Embedded Metal Materials |
724 | 52-7.03 CONSTRUCTION 52-7.03A General 52-7.03B Prestressing Tendon Connection 52-7.03C Bar Reinforcing Steel Connection 52-7.03D Copper Cable to Bar Reinforcing Steel Connection 52-7.03E Pile and Concrete Epoxy Insulation 52-7.03F Concrete Insulation Course 52-7.03G Neoprene Sheet Insulation 52-7.03H Joint Sealant Insulation 52-7.03I Membrane Insulation |
725 | 52-7.03J Mortar Block Insulation 52-7.03K Epoxy-Coated Reinforcing Steel Insulation 52-7.03L Plastic End Cover Insulators 52-7.03M Pipe Wrapping Tape Insulation 52-7.03N Epoxy for Insulation of Embedded Metal Materials 52-7.04 PAYMENT |
727 | 53 SHOTCRETE 53-1.01 GENERAL 53-1.01A Summary 53-1.01B Definitions 53-1.01C Submittals 53-1.01D Quality Assurance 53-1.02 MATERIALS 53-1.03 CONSTRUCTION 53-1.03A General 53-1.03B Preparing Foundations |
728 | 53-1.03C Placing Shotcrete 53-1.03D Finishing Shotcrete 53-1.04 PAYMENT 53-2.01 GENERAL 53-2.01A Summary 53-2.01B Definitions 53-2.01C Submittals |
729 | 53-2.01D Quality Assurance 53-2.01D(1) General 53-2.01D(2) Qualifications 53-2.01D(3) Preconstruction Test Panels 53-2.01D(4) Quality Control 53-2.01D(4)(a) General |
730 | 53-2.01D(4)(b) Field Quality Control 53-2.01D(5) Department Acceptance 53-2.01D(5)(a) General 53-2.01D(5)(b) Visual Inspection 53-2.01D(5)(c) Compressive Strength 53-2.02 MATERIALS |
731 | 53-2.03 CONSTRUCTION 53-2.04 PAYMENT |
733 | 54 WATERPROOFING 54-1.01 GENERAL 54-1.02 MATERIALS 54-1.03 CONSTRUCTION 54-1.04 PAYMENT 54-2.01 GENERAL 54-2.02 MATERIALS 54-2.03 CONSTRUCTION 54-2.03A General 54-2.03B Waterproofing |
734 | 54-2.03C Dampproofing 54-2.04 PAYMENT 54-3.01 GENERAL 54-3.01A Summary 54-3.01B Definitions 54-3.01C Submittals 54-3.01D Quality Assurance 54-3.02 MATERIALS |
735 | 54-3.03 CONSTRUCTION |
736 | 54-3.04 PAYMENT 54-4.01 GENERAL 54-4.02 MATERIALS 54-4.02A General 54-4.02B Membrane 54-4.02C Protective Cover |
737 | 54-4.03 CONSTRUCTION 54-4.03A General 54-4.03B Butyl Membrane Waterproofing |
738 | 54-4.03C Asphaltic Protective Cover 54-4.04 PAYMENT 54-5.01 GENERAL 54-5.01A Summary 54-5.01B Definitions 54-5.01C Submittals 54-5.01D Quality Assurance 54-5.02 MATERIALS |
739 | 54-5.03 CONSTRUCTION |
740 | 54-5.04 PAYMENT 54-6.01 GENERAL 54-6.02 MATERIALS 54-6.03 CONSTRUCTION 54-6.04 PAYMENT |
743 | 55 STEEL STRUCTURES 55-1.01 GENERAL 55-1.01A Summary 55-1.01B Definitions 55-1.01C Submittals 55-1.01C(1) General 55-1.01C(2) Shop Drawings |
744 | 55-1.01C(3) Check Testing 55-1.01D Quality Assurance 55-1.01D(1) General 55-1.01D(2) Qualifications 55-1.01D(3) Quality Control 55-1.01D(3)(a) General |
745 | 55-1.01D(3)(b) Source Quality Control 55-1.01D(3)(b)(i) General 55-1.01D(3)(b)(ii) Charpy V-notch Requirements 55-1.01D(3)(b)(iii) Rotational Capacity Testing 55-1.01D(3)(b)(iii)(1) General 55-1.01D(3)(b)(iii)(2) Long Bolt Test |
747 | 55-1.01D(3)(b)(iii)(3) Short Bolt Test |
749 | 55-1.01D(3)(c) Field Quality Control 55-1.01D(3)(c)(i) General 55-1.01D(3)(c)(ii) Rotational Capacity Testing 55-1.01D(3)(c)(iii) Installation Tension Testing 55-1.01D(3)(c)(iv) Verification Tension Testing 55-1.01D(4) Department Acceptance |
750 | 55-1.02 MATERIALS 55-1.02A General 55-1.02B Delivery, Storage, and Handling 55-1.02C Design Requirements 55-1.02D Materials 55-1.02D(1) General |
751 | 55-1.02D(2) Charpy V-notch Requirements |
752 | 55-1.02D(3) Structural Steel 55-1.02D(4) Bearing Pads 55-1.02D(5) Castings |
753 | 55-1.02D(6) Unidentified Stock Material 55-1.02D(7) Miscellaneous Materials 55-1.02E Fabrication 55-1.02E(1) General 55-1.02E(2) Flatness of Faying and Bearing Surfaces 55-1.02E(3) Bent Plates |
754 | 55-1.02E(4) Fastener Threads 55-1.02E(5) Pin Connections 55-1.02E(6) Bolted Connections 55-1.02E(6)(a) General |
755 | 55-1.02E(6)(b) Bolt Holes 55-1.02E(6)(b)(i) General 55-1.02E(6)(b)(ii) Punching 55-1.02E(6)(b)(iii) Drilling 55-1.02E(6)(b)(iv) Reaming |
756 | 55-1.02E(6)(c) Installation 55-1.02E(7) Welding 55-1.02E(7)(a) General |
757 | 55-1.02E(7)(b) Backing for Welds 55-1.02E(7)(c) Steel Pedestrian Bridges 55-1.02E(8) Curved Girders 55-1.02E(9) Shop Assembly |
758 | 55-1.03 CONSTRUCTION 55-1.03A General 55-1.03B Falsework 55-1.03C Erection 55-1.03C(1) General 55-1.03C(2) Continuous Members 55-1.03C(3) Bearings and Anchorages |
759 | 55-1.03C(4)–55-1.03C(10) Reserved 55-1.04 PAYMENT |
761 | 56 OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES 56-1.01 GENERAL 56-1.02 MATERIALS 56-1.03 CONSTRUCTION 56-1.04 PAYMENT 56-2.01 GENERAL 56-2.01A Summary 56-2.01B Definitions 56-2.01C Submittals 56-2.01C(1) General 56-2.01C(2) Shop Drawings |
762 | 56-2.01C(3) Quality Control Program 56-2.01D Quality Assurance 56-2.01D(1) General 56-2.01D(2) Quality Control 56-2.01D(2)(a) General 56-2.01D(2)(b) Nondestructive Testing 56-2.01D(2)(b)(i) General 56-2.01D(2)(b)(ii) Ultrasonic Testing 56-2.01D(2)(b)(iii) Radiographic Testing 56-2.01D(2)(b)(iv) Longitudinal Seam Welds |
763 | 56-2.01D(2)(c) Walkway Safety Railing 56-2.01D(3) Department Acceptance 56-2.02 MATERIALS 56-2.02A General 56-2.02B Bars, Plates, Shapes, and Structural Tubing 56-2.02B(1) General 56-2.02B(2) Charpy V-notch Impact 56-2.02C Sheets 56-2.02D Bolted Connections |
764 | 56-2.02E Anchorages 56-2.02F Pipe Posts 56-2.02G Steel Walkway Gratings 56-2.02H Elastomeric Bearing Pads 56-2.02I Safety Chain at Walkways 56-2.02J Safety Cable at Walkways 56-2.02K Fabrication 56-2.02K(1) General |
765 | 56-2.02K(2) Welding 56-2.02K(3) Bolted Connections 56-2.02K(4) Walkway 56-2.02K(5) Handholes |
766 | 56-2.02K(6) Identification Plate 56-2.02L Surface Finish 56-2.02L(1) General 56-2.02L(2) Galvanizing 56-2.02L(3) Cleaning and Painting 56-2.03 CONSTRUCTION 56-2.03A General 56-2.03B Existing Sign Structures 56-2.03B(1) General 56-2.03B(2) Remove Sign Structure 56-2.03B(3) Reconstruct Sign Structure |
767 | 56-2.03B(4) Modify Sign Structure 56-2.03B(5) Relocate Sign Structure 56-2.03B(6) Salvage Sign Structure 56-2.04 PAYMENT 56-3.01 GENERAL 56-3.01A General 56-3.01B Materials 56-3.01B(1) General 56-3.01B(2) Fabrication 56-3.01B(2)(a) General 56-3.01B(2)(b) Bonding Jumper 56-3.01C Construction 56-3.01C(1) General 56-3.01C(2) Foundations 56-3.01C(2)(a) General |
768 | 56-3.01C(2)(b) Cast-In-Drilled-Hole Concrete Pile Foundations |
769 | 56-3.01C(3) Identification Tags 56-3.01D Payment 56-3.02 STEEL STANDARDS, POLES, PEDESTALS, AND POSTS 56-3.02A General 56-3.02A(1) General 56-3.02A(2) Definitions 56-3.02A(3) Submittals 56-3.02A(3)(a) General 56-3.02A(3)(b) Test Reports |
770 | 56-3.02A(4) Quality Assurance 56-3.02A(4)(a) General 56-3.02A(4)(b) Quality Control 56-3.02A(4)(c) Department Acceptance 56-3.02B Materials 56-3.02B(1) General 56-3.02B(2) Bolted Connections |
771 | 56-3.02B(3) Standards and Poles 56-3.02B(3)(a) General 56-3.02B(3)(b) Fabrication 56-3.02B(3)(c) Welding |
772 | 56-3.02C Construction 56-3.02D Payment 56-3.03–56-3.04 RESERVED 56-3.05 HIGH MAST LIGHTING ASSEMBLY POLES 56-3.06 WOOD POLES 56-3.06A General 56-3.06B Materials |
773 | 56-3.06C Construction 56-3.06D Payment |
775 | 57 WOOD AND PLASTIC LUMBER STRUCTURES 57-1.01 GENERAL 57-1.01A Summary 57-1.01B Definitions 57-1.01C Submittals 57-1.01D Quality Assurance 57-1.02 MATERIALS 57-1.02A General 57-1.02B Structural Metal 57-1.02C Hardware 57-1.03 CONSTRUCTION 57-1.04 PAYMENT |
776 | 57-2.01 GENERAL 57-2.01A General 57-2.01A(1) Summary 57-2.01A(2) Definitions 57-2.01A(3) Submittals 57-2.01A(4) Quality Assurance 57-2.01B Materials 57-2.01B(1) General 57-2.01B(2) Structural Timber and Lumber |
777 | 57-2.01B(3) Preservative Treatment 57-2.01C Construction 57-2.01C(1) General 57-2.01C(2) Framing |
778 | 57-2.01C(3) Treated Timber 57-2.01C(3)(a) General 57-2.01C(3)(b) Manual Treatment |
779 | 57-2.01C(3)(c) Handling 57-2.01C(4) Painting 57-2.01D Payment 57-2.02 TIMBER LAGGING 57-2.02A General 57-2.02B Materials 57-2.02C Construction 57-2.02D Payment 57-2.03 TIMBER CATWALK 57-2.03A General 57-2.03B Materials 57-2.03B(1) General |
780 | 57-2.03B(2) Timber Planks 57-2.03B(3) Cable Handrail 57-2.03C Construction 57-2.03D Payment 57-2.04 ABUTMENT LUMBER BLOCKING 57-2.05 TIMBER RETAINING WALLS 57-2.06–57-2.10 RESERVED 57-3.01 GENERAL 57-3.01A Summary 57-3.01B Definitions 57-3.01C Submittals 57-3.01C(1) General |
781 | 57-3.01C(2) Shop Drawings 57-3.01D Quality Assurance 57-3.01D(1) General 57-3.01D(2) Quality Control 57-3.01D(2)(a) General 57-3.01D(2)(b) Stiffness Test 57-3.01D(3) Department Acceptance 57-3.01D(3)(a) General 57-3.01D(3)(b) Void Testing 57-3.01D(3)(b)(i) General 57-3.01D(3)(b)(ii) Exterior Void Test |
782 | 57-3.01D(3)(b)(iii) Interior Void Test 57-3.02 MATERIALS 57-3.02A General |
783 | 57-3.02B Reinforced Recycled Plastic Lumber 57-3.02C Composite Plastic Lumber |
784 | 57-3.02D Unreinforced Recycled Plastic Lumber 57-3.03 CONSTRUCTION 57-3.04 PAYMENT 57-3.05–57-3.10 RESERVED |
785 | 58 SOUND WALLS 58-1.01 GENERAL 58-1.02 MATERIALS 58-1.03 CONSTRUCTION 58-1.04 PAYMENT 58-2.01 GENERAL 58-2.01A Summary 58-2.01B Definitions 58-2.01C Submittals 58-2.01C(1) General 58-2.01C(2) Test Data 58-2.01C(3) Product Data 58-2.01C(4) Mix Design 58-2.01C(5) Samples 58-2.01C(6) Qualification Data 58-2.01C(7) Certificates of Compliance 58-2.01C(8) Daily Field Report and Final Report |
786 | 58-2.01D Quality Assurance 58-2.01D(1) General 58-2.01D(2) Quality Control 58-2.01D(2)(a) General 58-2.01D(2)(b) Preconstruction Testing 58-2.01D(2)(c) Field Quality Control 58-2.01D(2)(c)(i) General 58-2.01D(2)(c)(ii) Special Inspector 58-2.01D(2)(c)(iii) Masonry Compressive Strength Testing |
787 | 58-2.01D(3) Department Acceptance 58-2.02 MATERIALS 58-2.02A General 58-2.02B Concrete Masonry Units 58-2.02C Mortar 58-2.02D Grout 58-2.02E Lightweight Aggregate |
788 | 58-2.02F Reinforcement 58-2.02G Expansion Joint Filler 58-2.02H Access Gates 58-2.03 CONSTRUCTION 58-2.03A General 58-2.03B Mortar Bedding and Jointing |
789 | 58-2.03C Reinforcement 58-2.03D Grouting 58-2.03E Access Gates 58-2.04 PAYMENT 58-4.01 GENERAL 58-4.01A Summary 58-4.01B Definitions 58-4.01C Submittals 58-4.01C(1) General 58-4.01C(2) Shop Drawings |
790 | 58-4.01D Quality Assurance 58-4.02 MATERIALS 58-4.03 CONSTRUCTION 58-4.04 PAYMENT |
791 | 59 STRUCTURAL STEEL COATINGS 59-1.01 GENERAL 59-1.01A Summary 59-1.01B Definitions 59-1.01C Submittals 59-1.01D Quality Assurance 59-1.02 MATERIALS 59-1.02A General 59-1.02B Abrasives 59-1.02C Coatings 59-1.03 CONSTRUCTION 59-1.03A General 59-1.03B Weather Conditions |
792 | 59-1.03C Cleaning 59-1.03C(1) General 59-1.03C(2) Pressure Rinsing 59-1.03C(3) Pressure Washing 59-1.03C(4) Steam Cleaning 59-1.03C(5) Blast Cleaning 59-1.03D Painting |
793 | 59-1.04 PAYMENT 59-2.01 GENERAL 59-2.01A General 59-2.01A(1) Summary 59-2.01A(2) Definitions 59-2.01A(3) Submittals 59-2.01A(3)(a) General 59-2.01A(3)(b) Mandatory SSPC-QP Certifications 59-2.01A(3)(c) Painting Quality Work Plan |
794 | 59-2.01A(4) Quality Assurance 59-2.01A(4)(a) General 59-2.01A(4)(b) Certifications 59-2.01A(4)(c) Prepainting Meeting 59-2.01A(4)(d) Quality Control 59-2.01A(4)(d)(i) General 59-2.01A(4)(d)(ii) Inorganic Zinc Coatings |
795 | 59-2.01B Materials 59-2.01B(1) General 59-2.01B(2) Design Criteria 59-2.01B(2)(a) General 59-2.01B(2)(b) Ventilated Containment Systems |
796 | 59-2.01C Construction 59-2.01C(1) General 59-2.01C(2) Containment Systems 59-2.01C(2)(a) General 59-2.01C(2)(b) Ventilated Containment Systems 59-2.01C(2)(b)(i) General 59-2.01C(2)(b)(ii) Ventilation |
797 | 59-2.01C(3) Surface Preparation 59-2.01C(3)(a) General 59-2.01C(3)(b) Cleaning 59-2.01C(3)(b)(i) General 59-2.01C(3)(b)(ii) Blast Cleaning 59-2.01C(4) Painting 59-2.01C(4)(a) General |
798 | 59-2.01C(4)(b) Zinc Coating System 59-2.01C(4)(b)(i) General |
799 | 59-2.01C(4)(b)(ii) Undercoat |
800 | 59-2.01C(4)(b)(iii) Final Coat 59-2.01C(4)(b)(iv) Finish Coats 59-2.01C(4)(c) State Specification Paint Waterborne Coating System 59-2.01C(4)(d) Moisture-Cured Polyurethane Coating System 59-2.01D Payment |
801 | 59-2.02 PAINTING STEEL SOLDIER PILES 59-2.02A General 59-2.02B Materials 59-2.02C Construction 59-2.02D Payment 59-2.03–59-2.05 RESERVED 59-3.01 GENERAL 59-3.02 MATERIALS 59-3.03 CONSTRUCTION 59-3.04 PAYMENT 59-4.01 GENERAL |
802 | 59-4.02 MATERIALS 59-4.03 CONSTRUCTION 59-4.03A General 59-4.03B Undercoating of Ungalvanized Surfaces 59-4.03C Testing of Inorganic Zinc Coating 59-4.03D Finish Coats 59-4.04 PAYMENT 59-5.01 GENERAL 59-5.01A Summary 59-5.01B Definitions 59-5.01C Submittals 59-5.01C(1) General 59-5.01C(2) Coating Quality Work Plan |
803 | 59-5.01D Quality Assurance 59-5.01D(1) General 59-5.01D(2) Precoating Meeting 59-5.01D(3) Test Coupons 59-5.01D(4) Quality Control 59-5.02 MATERIALS |
804 | 59-5.03 CONSTRUCTION 59-5.04 PAYMENT |
805 | 60 EXISTING STRUCTURES 60-1.01 GENERAL 60-1.02 MATERIALS 60-1.03 CONSTRUCTION 60-1.04 PAYMENT 60-2.01 GENERAL 60-2.01A General 60-2.01B Materials 60-2.01C Construction 60-2.01D Payment |
806 | 60-2.02 BRIDGE REMOVAL 60-2.02A General 60-2.02A(1) Summary 60-2.02A(2) Definitions 60-2.02A(3) Submittals 60-2.02A(4) Quality Assurance 60-2.02A(4)(a) General 60-2.02A(4)(b) Quality Control 60-2.02B Materials 60-2.02B(1) General 60-2.02B(2) Design Criteria for Temporary Support Shoring and Temporary Bracing |
807 | 60-2.02C Construction 60-2.02C(1) General 60-2.02C(2) Protective Covers 60-2.02C(3) Preliminary Work |
808 | 60-2.02D Payment 60-2.03–60-2.10 RESERVED 60-3.01 GENERAL 60-3.01A General 60-3.01B Materials 60-3.01C Construction 60-3.01D Payment 60-3.02 BRIDGE DECK REPAIR AND PREPARATION 60-3.02A General 60-3.02B Materials 60-3.02B(1) General 60-3.02B(2) Rapid Setting Concrete 60-3.02C Construction 60-3.02C(1) General |
809 | 60-3.02C(2) Removing Concrete Deck Surface 60-3.02C(3) Removing Asphalt Concrete Surfacing 60-3.02C(4) Removing Seals 60-3.02C(5) Removing Unsound Concrete |
810 | 60-3.02C(6) Rapid Setting Concrete Patch 60-3.02C(7) Prepare Concrete Deck Surface 60-3.02C(8)–60-3.02C(15) Reserved 60-3.02D Payment 60-3.03 BRIDGE DECK TREATMENT 60-3.03A General 60-3.03A(1) General |
811 | 60-3.03A(2) Materials 60-3.03A(3) Construction 60-3.03A(4) Payment 60-3.03B Methacrylate Resin Bridge Deck Treatment 60-3.03B(1) General 60-3.03B(1)(a) Summary 60-3.03B(1)(b) Definitions 60-3.03B(1)(c) Submittals 60-3.03B(1)(d) Quality Assurance 60-3.03B(2) Materials |
812 | 60-3.03B(3) Construction |
813 | 60-3.03B(4) Payment 60-3.03C–60-3.03J Reserved 60-3.04 DECK OVERLAYS 60-3.04A General 60-3.04A(1) General 60-3.04A(2) Materials 60-3.04A(3) Construction 60-3.04A(4) Payment 60-3.04B Polyester Concrete Overlays 60-3.04B(1) General 60-3.04B(1)(a) Summary 60-3.04B(1)(b) Definitions 60-3.04B(1)(c) Submittals 60-3.04B(1)(d) Quality Assurance |
814 | 60-3.04B(2) Materials |
815 | 60-3.04B(3) Construction 60-3.04B(3)(a) General 60-3.04B(3)(b) Placing Methacrylate Resin |
816 | 60-3.04B(3)(c) Placing Polyester Concrete 60-3.04B(4) Payment |
817 | 60-3.04C Polyester Concrete Expansion Dams 60-3.04C(1) General 60-3.04C(1)(a) Summary 60-3.04C(1)(b) Definitions 60-3.04C(1)(c) Submittals 60-3.04C(1)(d) Quality Assurance 60-3.04C(2) Materials 60-3.04C(3) Construction 60-3.04C(4) Payment 60-3.04D Concrete Overlays 60-3.04D(1) General |
818 | 60-3.04D(2) Materials 60-3.04D(3) Construction 60-3.04D(4) Payment 60-3.04E Multilayer Polymer Overlays 60-3.04F–60-3.04M Reserved 60-3.05 REPAIRING STRUCTURES 60-3.05A General 60-3.05A(1) General 60-3.05A(2) Materials 60-3.05A(3) Construction 60-3.05A(4) Payment 60-3.05B Repairing Spalled Surface Areas 60-3.05B(1) General 60-3.05B(1)(a) Summary 60-3.05B(1)(b) Definitions 60-3.05B(1)(c) Submittals 60-3.05B(1)(d) Quality Assurance 60-3.05B(2) Materials |
819 | 60-3.05B(3) Construction 60-3.05B(4) Payment 60-3.05C Epoxy Crack Injection 60-3.05C(1) General 60-3.05C(1)(a) Summary 60-3.05C(1)(b) Definitions 60-3.05C(1)(c) Submittals 60-3.05C(1)(d) Quality Assurance 60-3.05C(2) Materials |
820 | 60-3.05C(3) Construction 60-3.05C(4) Payment 60-3.05D Heat-Straighten Steel Girders 60-3.05E–60-3.05J Reserved 60-3.06–60-3.10 RESERVED 60-4.01 GENERAL 60-4.01A General 60-4.01B Materials 60-4.01C Construction 60-4.01D Payment 60-4.02 REFINISHING BRIDGE DECKS 60-4.02A General |
821 | 60-4.02B Materials 60-4.02C Construction 60-4.02C(1) General 60-4.02C(2) Placing Portland Cement Concrete |
822 | 60-4.02C(3) Placing Rapid Setting Concrete 60-4.02D Payment 60-4.03 ACCESS OPENINGS 60-4.03A General 60-4.03B Materials 60-4.03C Construction 60-4.03C(1) General 60-4.03C(2) Deck Access Openings 60-4.03C(3) Soffit Access Openings 60-4.03C(4) Soffit Access Opening Extensions |
823 | 60-4.03C(5) Close Deck Access Openings 60-4.03D Payment 60-4.04 CORING CONCRETE 60-4.04A General 60-4.04A(1) Summary 60-4.04A(2) Definitions 60-4.04A(3) Submittals 60-4.04A(4) Quality Assurance 60-4.04B Materials 60-4.04C Construction |
824 | 60-4.04D Payment 60-4.05 CORING AND PRESSURE GROUTING DOWELS 60-4.05A General 60-4.05B Materials 60-4.05C Construction 60-4.05D Payment 60-4.06 STEEL COLUMN CASINGS 60-4.06A General 60-4.06A(1) Summary 60-4.06A(2) Definitions 60-4.06A(3) Submittals 60-4.06A(4) Quality Assurance |
825 | 60-4.06B Materials 60-4.06B(1) General 60-4.06B(2) Grout 60-4.06C Construction 60-4.06C(1) General 60-4.06C(2) Painting 60-4.06C(3) Grouting |
826 | 60-4.06D Payment 60-4.07 COMPOSITE COLUMNS CASINGS 60-4.08 PRESTRESSING STEEL GIRDERS 60-4.09 BRIDGE JOINT RESTRAINERS 60-4.09A General 60-4.09A(1) Summary 60-4.09A(2) Definitions 60-4.09A(3) Submittals 60-4.09A(3)(a) General 60-4.09A(3)(b) Cable-Type Restrainers |
827 | 60-4.09A(3)(c) Pipe-Type Restrainers 60-4.09A(4) Quality Assurance 60-4.09B Materials 60-4.09B(1) General 60-4.09B(2) Cable Type Restrainers 60-4.09B(2)(a) General |
828 | 60-4.09B(2)(b) Corrosion Protection 60-4.09B(2)(c) Fabrication 60-4.09B(2)(c)(i) General 60-4.09B(2)(c)(ii) Applying Corrosion Protection |
829 | 60-4.09B(3) Bar Type Restrainers 60-4.09B(4) Pipe Type Restrainers 60-4.09C Construction 60-4.09C(1) General 60-4.09C(2) Cable Type Restrainers 60-4.09C(3) Bar Type Restrainers 60-4.09C(4) Pipe Type Restrainers 60-4.09D Payment |
830 | 60-4.10–60-4.15 RESERVED 60-5.01 GENERAL 60-5.01A General 60-5.01B Materials 60-5.01C Construction 60-5.01D Payment 60-5.02 ABANDONING PEDESTRIAN UNDERCROSSINGS 60-5.03–60-5.10 RESERVED |
831 | DIVISION VII DRAINAGE FACILITIES 61 GENERAL 61-1.01 GENERAL 61-1.02 MATERIALS 61-1.03 CONSTRUCTION 61-1.04 PAYMENT 61-2.01 GENERAL 61-2.01A Summary 61-2.01B Definitions 61-2.01C Submittals |
832 | 61-2.01D Quality Assurance 61-2.01D(1) General 61-2.01D(2) Quality Control 61-2.01D(2)(a) Watertightness Test 61-2.01D(2)(b) Performance Specifications |
833 | 61-2.01D(3) Field Leakage Testing 61-2.01D(3)(a) General |
834 | 61-2.01D(3)(b) Exfiltration and Infiltration Testing 61-2.01D(3)(c) Low-Pressure Air Test |
835 | 61-2.01D(3)(d) Other Allowable Tests 61-2.01D(3)(e) Joints or Pipe Section Not Passing Leakage Testing 61-2.01D(3)(f) Reserved 61-2.02 MATERIALS 61-2.03 CONSTRUCTION |
836 | 61-2.04 PAYMENT 61-3.01 GENERAL 61-3.02 MATERIALS 61-3.03 CONSTRUCTION 61-3.04 PAYMENT 61-4.01 GENERAL 61-4.02 MATERIALS 61-4.03 CONSTRUCTION |
837 | 61-4.04 PAYMENT 61-5.01 GENERAL 61-5.01A Summary 61-5.01B Definitions 61-5.01C Submittals 61-5.01D Quality Assurance 61-5.02 MATERIALS 61-5.03 CONSTRUCTION 61-5.04 PAYMENT |
838 | 61-6.01 GENERAL 61-6.02 MATERIALS 61-6.03 CONSTRUCTION 61-6.04 PAYMENT 62–63 RESERVED |
839 | 64 PLASTIC PIPE 64-1.01 GENERAL 64-1.01A Summary 64-1.01B Definitions 64-1.01C Submittals 64-1.01D Quality Assurance 64-1.02 MATERIALS 64-1.03 CONSTRUCTION 64-1.04 PAYMENT 64-2.01 GENERAL 64-2.01A Summary 64-2.01B Definitions 64-2.01C Submittals 64-2.01D Quality Assurance 64-2.02 MATERIALS 64-2.02A General |
840 | 64-2.02B Backfill 64-2.02C Corrugated Polyethylene Pipe 64-2.02D Corrugated PVC Pipe with Smooth Interior |
841 | 64-2.02E Joints 64-2.02F–64-2.02H Reserved 64-2.03 CONSTRUCTION 64-2.03A General |
842 | 64-2.03B Earthwork 64-2.03C Pipe Placement 64-2.04 PAYMENT |
843 | 65 CONCRETE PIPE 65-1.01 GENERAL 65-1.02 MATERIALS 65-1.03 CONSTRUCTION 65-1.04 PAYMENT 65-2.01 GENERAL 65-2.01A Summary 65-2.01B Definitions 65-2.01C Submittals |
844 | 65-2.01D Quality Assurance 65-2.01D(1) General 65-2.01D(2) Field Testing of Siphon and Pressure Pipe |
845 | 65-2.01D(3) Circular Reinforced Concrete Pipe, Described or Chosen by Class 65-2.01D(4) Circular Reinforced Concrete Pipe, Direct Design Method 65-2.01D(5) Oval Shaped Reinforced Concrete Pipe 65-2.02 MATERIALS 65-2.02A General |
846 | 65-2.02B Delivery, Storage and Handling 65-2.02C Circular Reinforced Concrete Pipe 65-2.02C(1) General 65-2.02C(2) Circular Reinforced Concrete Pipe, Described or Chosen by Class |
847 | 65-2.02C(3) Circular Reinforced Concrete Pipe, Direct Design Method 65-2.02D Oval Shaped Reinforced Concrete Pipe |
848 | 65-2.02E Reserved 65-2.02F Joints 65-2.03 CONSTRUCTION 65-2.03A General 65-2.03B Earthwork 65-2.03C Laying Pipe |
849 | 65-2.04 PAYMENT 65-3.01 GENERAL 65-3.02 MATERIALS 65-3.03 CONSTRUCTION 65-3.04 PAYMENT |
851 | 66 CORRUGATED METAL PIPE 66-1.01 GENERAL 66-1.01A Summary 66-1.01B Definitions 66-1.01C Submittals 66-1.01D Quality Assurance 66-1.01D(1) General 66-1.01D(2)Quality Control 66-1.01D(2)a Field Testing of Corrugated Steel Pipe Siphons 66-1.02 MATERIALS 66-1.02A General |
852 | 66-1.02B Dimensions and Thickness 66-1.02C Protective Coatings, Linings, and Paving |
853 | 66-1.02D Coupling Bands 66-1.02E Corrugated Steel Pipe 66-1.02E(1) General 66-1.02E(2) Fabrication 66-1.02E(2)(a) General 66-1.02E(2)(b) Fabrication by Riveting 66-1.02E(2)(c) Fabrication by Continuous Helical Seam 66-1.02E(2)(c)(i) General |
854 | 66-1.02E(2)(c)(ii) Fabrication by Continuous Lock Seam 66-1.02E(2)(c)(iii) Fabrication by Continuous Welded Seam 66-1.02E(3) End Finish 66-1.02E(4) Damaged Galvanizing 66-1.02E(5) Damaged Aluminum Coatings |
855 | 66-1.02E(6) Corrugated Steel Pipe Siphons 66-1.02F Corrugated Aluminum Pipe 66-1.02F(1) General 66-1.02F(2) Fabrication 66-1.02F(2)(a) General 66-1.02F(2)(b) Fabrication by Riveting 66-1.02F(2)(c) Fabrication by Continuous Helical Lock Seam 66-1.02F(3) End Finish 66-1.03 CONSTRUCTION |
856 | 66-1.04 PAYMENT 66-2.01 GENERAL 66-2.02 MATERIALS 66-2.03 CONSTRUCTION |
857 | 66-2.04 PAYMENT 66-3.01 GENERAL 66-3.02 MATERIALS 66-3.03 CONSTRUCTION 66-3.04 PAYMENT 66-4.01 GENERAL 66-4.02 MATERIALS |
859 | 66-4.03 CONSTRUCTION 66-4.04 PAYMENT |
861 | 67 STRUCTURAL PLATE CULVERTS 67-1.01 GENERAL 67-1.02 MATERIALS 67-1.03 CONSTRUCTION 67-1.04 PAYMENT 67-2.01 GENERAL 67-2.01A Summary 67-2.01B Definitions 67-2.01C Submittals 67-2.01D Quality Assurance 67-2.02 MATERIALS 67-2.02A General |
862 | 67-2.02B Protective Coating 67-2.02C Identification 67-2.02D Reserved 67-2.03 CONSTRUCTION 67-2.04 PAYMENT |
863 | 67-3.01 GENERAL 67-3.01A Summary 67-3.01B Definitions 67-3.01C Submittals 67-3.01D Quality Assurance 67-3.02 MATERIALS 67-3.02A General |
864 | 67-3.02B Pressure Grouting |
865 | 67-3.02C Reserved 67-3.03 CONSTRUCTION 67-3.04 PAYMENT |
867 | 68 SUBSURFACE DRAINS 68-1.01 GENERAL 68-1.01A Summary 68-1.01B Definitions 68-1.01C Submittals 68-1.01D Quality Assurance 68-1.02 MATERIALS 68-1.02A General 68-1.02B Protective Coating 68-1.03 CONSTRUCTION 68-1.03A General 68-1.03B Filter Fabric 68-1.04 PAYMENT 68-2.01 GENERAL 68-2.01A Summary 68-2.01B Definitions 68-2.01C Submittals |
868 | 68-2.01C Quality Assurance 68-2.02 MATERIALS 68-2.02A General 68-2.02B Perforated Steel Pipe 68-2.02C Perforated Aluminum Pipe 68-2.02D Perforated Plastic Pipe 68-2.02E Underdrain Outlets and Risers |
869 | 68-2.02F Permeable Material 68-2.02F(1) General 68-2.02F(2) Class 1 Permeable Material 68-2.02F(3) Class 2 Permeable Material |
870 | 68-2.02F(4) Class 3 Permeable Material 68-2.02G Filter Fabric 68-2.02H–68-2.02N Reserved 68-2.03 CONSTRUCTION 68-2.04 PAYMENT 68-3.01 GENERAL |
871 | 68-3.02 MATERIALS 68-3.03 CONSTRUCTION |
872 | 68-3.04 PAYMENT 68-4.01 GENERAL 68-4.02 MATERIALS 68-4.02A General 68-4.02B Pipe and Pipe Fittings |
873 | 68-4.02C Treated Permeable Material 68-4.02D Filter Fabric 68-4.02E Miscellaneous 68-4.02F–68-4.02H Reserved 68-4.03 CONSTRUCTION |
874 | 68-4.04 PAYMENT 68-7.01 GENERAL 68-7.01A Summary 68-7.01B Definitions 68-7.01C Submittals |
875 | 68-7.01D Quality Assurance 68-7.02 MATERIALS 68-7.02A General 68-7.02B Geocomposite Drain 68-7.02C Plastic Pipe 68-7.02D Drainage Pads 68-7.02E Treated Permeable Base 68-7.03 CONSTRUCTION 68-7.04 PAYMENT |
877 | 69 OVERSIDE DRAINS 69-1.01 GENERAL 69-1.01A Summary 69-1.01B Definitions 69-1.01C Submittals 69-1.01D Quality Assurance 69-1.02 MATERIALS 69-1.02A General 69-1.02B Steel Pipe Overside Drains 69-1.02C Aluminum Pipe Overside Drains |
878 | 69-1.02D Plastic Pipe Overside Drains 69-1.02E Anchor Assemblies 69-1.02F Cable Anchorage System 69-1.02G Protective Coatings 69-1.03 CONSTRUCTION |
879 | 69-1.04 PAYMENT |
881 | 70 MISCELLANEOUS DRAINAGE FACILITIES 70-1.01 GENERAL 70-1.02 MATERIALS 70-1.03 CONSTRUCTION 70-1.04 PAYMENT 70-2.01 GENERAL 70-2.02 MATERIALS 70-2.03 CONSTRUCTION |
882 | 70-2.04 PAYMENT 70-3.01 GENERAL 70-3.01A Summary 70-3.01B Definitions 70-3.01C Submittals 70-3.01D Quality Assurance 70-3.01D(1) General 70-3.01D(2) Quality Control 70-3.02 MATERIALS 70-3.02A General 70-3.02B Coatings 70-3.02B(1) General 70-3.02B(2) Coal Tar Coating |
883 | 70-3.02B(3) Factory-Applied Fusion-Bonded Epoxy Coating 70-3.02B(4) Asphalt Coating 70-3.03 CONSTRUCTION 70-3.03A General 70-3.03B Coatings 70-3.04 PAYMENT 70-4.01 GENERAL 70-4.02 MATERIALS 70-4.03 CONSTRUCTION |
884 | 70-4.04 PAYMENT 70-5.01 GENERAL 70-5.01A General 70-5.01B Materials 70-5.01C Construction 70-5.01D Payment 70-5.02 FLARED END SECTIONS 70-5.02A General 70-5.02A(1) Summary 70-5.02A(2) Definitions 70-5.02A(3) Submittals 70-5.02A(4) Quality Assurance 70-5.02B Materials 70-5.02B(1) General 70-5.02B(2) Concrete Flared End Sections |
885 | 70-5.02B(3) Metal Flared End Sections 70-5.02B(4) Plastic Flared End Sections 70-5.02B(5) Alternative Flared End Sections 70-5.02C Construction 70-5.02D Payment 70.5.03 DRAINAGE GATES 70-5.03A General 70-5.03B Materials 70-5.03B(1) General 70-5.03B(2) Automatic Drainage Gates 70-5.03B(2)(a) General 70-5.03B(2)(b) Automatic Drainage Gates for Low Head Pressure 70-5.03B(2)(c) Automatic Drainage Gates for High Head Pressure 70-5.03B(3) Slide Headgates 70-5.03C Construction |
886 | 70-5.03D Payment 70-5.04 INLET DEPRESSIONS 70-5.04A General 70-5.04B Materials 70-5.04B(1) General 70-5.04B(2) Hot Mix Asphalt Inlet Depressions 70-5.04B(3) Concrete Inlet Depressions 70-5.04C Construction 70-5.04D Payment 70-5.05 DRAINAGE INLET MARKERS 70-5.05A General 70-5.05B Materials |
887 | 70-5.05C Construction 70-5.05D Payment |
888 | 70-5.06–70-5.15 RESERVED 70-6.01 GENERAL 70-6.01A Summary 70-6.01B Definitions 70-6.01C Submittals 70-6.01D Quality Assurance 70-6.02 MATERIALS 70-6.02A General 70-6.02B Line Drain Channel 70-6.02C Line Drain Frames and Grates |
889 | 70-6.03 CONSTRUCTION 70-6.04 PAYMENT 70-7.01 GENERAL 70-7.01A Summary 70-7.01B Definitions 70-7.01C Submittals 70-7.01D Quality Assurance 70-7.02 MATERIALS 70-7.02A General |
890 | 70-7.02B Casing 70-7.02C Casing Hanger Assemblies 70-7.02D Concrete Casing Supports 70-7.03 CONSTRUCTION |
891 | 70-7.04 PAYMENT |
893 | 71 EXISTING DRAINAGE FACILITIES 71-1.01 GENERAL 71-1.02 MATERIALS 71-1.03 CONSTRUCTION 71-1.04 PAYMENT 71-2.01 GENERAL 71-2.02 MATERIALS 71-2.03 CONSTRUCTION 71-2.04 PAYMENT 71-3.01 GENERAL 71-3.01A General 71-3.01A(1) Summary |
894 | 71-3.01A(2) Definitions 71-3.01A(3) Submittals 71-3.01A(4) Quality Assurance 71-3.01A(4)(a) General 71-3.01A(4)(b) Preconstruction Meetings 71-3.01A(4)(b)i Prerehabilitation Meeting 71-3.01A(4)(b)ii Pregrouting Meeting 71-3.01A(4)(c) Quality Control 71-3.01A(4)(c)i Annular Space Grouting |
895 | 71-3.01A(4)(c)ii CCTV Recording 71-3.01A(4)(c)iii Photographs 71-3.01A(4)(c)iv Monitoring of Annular Space Grouting |
896 | 71-3.01A(4)(c)v Pipeliners 71-3.01A(4)(c)vi Deflection Testing of Pipeliners 71-3.01B Materials 71-3.01B(1) General 71-3.01B(2) Contact Grout |
897 | 71-3.01B(3) Annular Space Grout 71-3.01C Construction 71-3.01C(1) General 71-3.01C(2) Cleaning and Preparation 71-3.01C(3) Inspection and Evaluation |
898 | 71-3.01C(4) Repairing 71-3.01C(5) Rehabilitation 71-3.01C(5)(a) General 71-3.01C(5)(b) Annular Space Grouting 71-3.01C(5)(c) Restoring Openings |
899 | 71-3.01C(5)(d) Postrehabilitation Inspection 71-3.01D Payment 71-3.02 FILL CULVERT VOIDS 71-3.03 CONTACT GROUTING 71-3.04 INVERT PAVING 71-3.05 EDPM RUBBER PIPE JOINT SEAL 71-3.06 WELDED STEEL PIPELINERS 71-3.07 PLASTIC PIPELINERS 71-3.08 CURED-IN-PLACE PIPELINERS |
900 | 71-3.09 MACHINE SPIRAL WOUND PVC PIPELINERS 71-3.09A General 71-3.09A(1) General 71-3.09A(1)(a) Summary 71-3.09A(1)(b) Definitions 71-3.09A(1)(c) Submittals 71-3.09A(1)(d) Quality Assurance 71-3.09A(2) Materials 71-3.09A(3) Construction 71-3.09A(4) Payment 71-3.09B Machine Spiral Wound PVC Pipeliners, Grouted 71-3.09B(1) General 71-3.09B(1)(a) Summary 71-3.09B(1)(b) Definitions 71-3.09B(1)(c) Submittals |
901 | 71-3.09B(1)(d) Quality Assurance 71-3.09B(2) Materials 71-3.09B(3) Construction 71-3.09B(4) Payment 71-3.09C Machine Spiral Wound PVC Pipeliners, Expandable Diameter 71-3.09C(1) General 71-3.09C(2) Materials 71-3.09C(3) Construction 71-3.09C(4) Payment 71-3.10 CEMENTITIOUS PIPELINERS 71-3.11–71-3.15 RESERVED 71-4.01 GENERAL 71-4.01A General 71-4.01B Materials |
902 | 71-4.01C Construction 71-4.01D Payment 71-4.02 PIPES 71-4.02A General 71-4.02B Materials 71-4.02C Construction 71-4.02D Payment 71-4.03 INLETS, MANHOLES, AND RISERS 71-4.03A General 71-4.03B Materials 71-4.03C Construction 71-4.03D Payment 71-4.04 SLOTTED PIPE GRATE 71-5.01 GENERAL 71-5.02 MATERIALS 71-5.03 CONSTRUCTION 71-5.03A General |
903 | 71-5.013B Frames, Covers, Grates, and Manholes 71-5.03C Inlet 71-5.04 PAYMENT |
904 | 71-6.01 GENERAL 71-6.01A General 71-6.01B Materials 71-6.01C Construction 71-6.01D Payment 71-6.02 MANHOLES 71-6.03 CULVERTS AND PIPELINES 71-6.04 INLETS 71-6.05–71-6.15 RESERVED 71-7.01A GENERAL 71-7.01B MATERIALS 71-7.01C CONSTRUCTION 71-7.01D PAYMENT |
905 | DIVISION VIII MISCELLANEOUS CONSTRUCTION 72 SLOPE PROTECTION 72-1.01 GENERAL 72-1.02 MATERIALS 72-1.03 CONSTRUCTION 72-1.04 PAYMENT 72-2.01 GENERAL 72-2.02 MATERIALS 72-2.02A General 72-2.02B Rock |
907 | 72-2.02C Fabric 72-2.03 CONSTRUCTION 72-2.03A General 72-2.03B Placement Method A 72-2.03C Placement Method B 72-2.04 PAYMENT 72-3.01 GENERAL 72-3.02 MATERIALS 72-3.02A General |
908 | 72-3.02B Concrete 72-3.02C Rock 72-3.02D Weep Tubes |
909 | 72-3.03 CONSTRUCTION 72-3.03A General 72-3.03B Placement Method A 72-3.03C Placement Method B 72-3.03D Placing Weep Tubes 72-3.03E Placing Concrete 72-3.04 PAYMENT |
910 | 72-4.01 GENERAL 72-4.02 MATERIALS 72-4.03 CONSTRUCTION 72-4.04 PAYMENT 72-5.01 GENERAL |
911 | 72-5.02 MATERIALS 72-5.03 CONSTRUCTION |
912 | 72-5.04 PAYMENT 72-11.01 GENERAL 72-11.01A General 72-11.01A(1) Summary 72-11.01A(2) Definitions 72-11.01A(3) Submittals 72-11.01A(4) Quality Assurance 72-11.01B Materials 72-11.01C Construction 72-11.01C(1) General |
913 | 72-11.01C(2) Minor Concrete 72-11.01C(3) Shotcrete 72-11.01D Payment 72-11.02 EXPOSED AGGREGATE SLOPE PAVING 72-11.02A General 72-11.02B Materials 72-11.02C Construction |
914 | 72-11.02D Payment 72-11.03 SLOPE PAVING WITH CONCRETE PAVERS 72-11.03A General 72-11.03A(1) Summary 72-11.03A(2) Definitions 72-11.03A(3) Submittals 72-11.03A(4) Quality Assurance 72-11.03B Materials 72-11.03B(1) General 72-11.03B(2) Concrete Pavers 72-11.03B(3) Mortar 72-11.03B(4) Bond Coat |
915 | 72-11.03B(5) Grout 72-11.03C Construction 72-11.03C(1) General 72-11.03C(2) Installation using a Bond Coat |
916 | 72-11.03C(3) Installation on a Mortar Bedding 72-11.03D Payment 72-16.01 GENERAL 72-16.01A Summary 72-16.01B Definitions 72-16.01C Submittals 72-16.01D Quality Assurance 72-16-.01D(1) General 72-16-.01D(2) Quality Control 72-16.02 MATERIALS 72-16.02A General 72-16.02B Mesh |
917 | 72-16.02C PVC Coating |
918 | 72-16.02D Joints 72-16.02E Internal Connecting Wire |
919 | 72-16.02F Fabric 72-16.02G Rock 72-16.03 CONSTRUCTION 72-16.03A General 72-16.03B Assembly |
920 | 72-16.03C Filling 72-16.04 PAYMENT 72-17.01 GENERAL 72-17.01A General 72-17.01B Material 72-17.01C Construction |
921 | 72-17.01D Payment 72-17.02 REMOVE SLOPE PAVING 72-17.02A General 72-17.02B Materials 72-17.02C Construction 72-17.02D Payment |
923 | 73 CONCRETE CURBS AND SIDEWALKS 73-1.01 GENERAL 73-1.02 MATERIALS 73-1.02A General 73-1.02B Detectable Warning Surfaces 73-1.03 CONSTRUCTION 73-1.03A General 73-1.03B Subgrade Preparation 73-1.03C Fixed Form Method |
924 | 73-1.03D Extruded and Slip Form Methods 73-1.03E Curing 73-1.04 PAYMENT |
925 | 73-2.01 GENERAL 73-2.02 MATERIALS 73-2.03 CONSTRUCTION 73-2.03A General 73-2.03B Fixed Form Method 73-2.03C Extruded or Slip Form Methods |
926 | 73-2.04 PAYMENT 73-3.01 GENERAL 73-3.01A Summary 73-3.01B Definitions 73-3.01C Submittals 73-3.01D Quality Assurance 73-3.01D(1) General 73-3.01D(2) Warranties 73-3.01D(3) Quality Control 73-3.02 MATERIALS 73-3.03 CONSTRUCTION |
927 | 73-3.04 PAYMENT 73-4.01 GENERAL 73-4.01A Summary 73-4.01B Definitions 73-4.01C Submittals 73-4.01D Quality Assurance 73-4.01D(1) General 73-4.01D(2) Quality Control 73-4.01D(3) Department Acceptance 73-4.02 MATERIALS 73-4.03 CONSTRUCTION |
928 | 73-4.04 PAYMENT 73-10.01 GENERAL 73-10.02 MATERIALS 73-10.03 CONSTRUCTION 73-10.04 PAYMENT |
929 | 74 PUMPING EQUIPMENT AND CONTROLS 74-1.01 GENERAL 74-1.01A Summary 74-1.01B Definitions 74-1.01C Submittals 74-1.01C(1) General 74-1.01C(2) Shop Drawings 74-1.01C(3) Product Data |
930 | 74-1.01C(4) Samples 74-1.01C(5) Work Plans 74-1.01C(5)(a) General 74-1.01C(5)(b) Performance Testing Plan 74-1.01C(5)(c) Maintenance Plan 74-1.01C(6) Maintenance and Operation Manual 74-1.01D Quality Assurance 74-1.01D(1) General 74-1.01D(2) Quality Control 74-1.01D(2)(a) General |
931 | 74-1.01D(2)(b) Operational Tests 74-1.01D(2)(c) Performance Tests 74-1.01D(2)(d) Drainage Pump Final Inspection 74-1.02 MATERIALS 74-1.02A General 74-1.02B Delivery, Storage, and Handling 74-1.03 CONSTRUCTION 74-1.03A General 74-1.03B Painting |
932 | 74-1.03C Care and Cleaning 74-1.03D Maintenance Instructions 74-1.03E Total Pumping Capacity and Maintenance Requirements |
933 | 74-1.03F Use of Pumps before Contract Acceptance 74-1.04 PAYMENT 74-2.01 GENERAL 74-2.01A Summary 74-2.01B Definitions 74-2.01C Submittals 74-2.01C(1) General 74-2.01C(2) Product Data |
934 | 74-2.01C(3) Certificates of Compliance 74-2.01D Quality Assurance 74-2.01D(1) General 74-2.01D(2) Regulatory Requirements 74-2.02 MATERIALS 74-2.02A General 74-2.02B Drainage Pumps and Pumping Apparatus 74-2.02B(1) General |
935 | 74-2.02B(2) Drainage Pump 74-2.02B(3) Pumping Apparatus |
936 | 74-2.02C Pump House Doors, Louvers, and Fans 74-2.02C(1) General 74-2.02C(2) Pump House Doors 74-2.02C(3) Wall Louvers 74-2.02C(4) Fans |
937 | 74-2.02D Pipe, Joints, and Fittings 74-2.02D(1) General 74-2.02D(2) Steel Pipe 74-2.02D(3) Ductile Iron Pipe 74-2.02D(4) Flexible Expansion Couplings 74-2.02E Bracing and Hardware 74-2.02F Storage Cabinets |
938 | 74-2.03 CONSTRUCTION 74-2.03A General 74-2.03B Pump House Doors 74-2.04 PAYMENT 74-3.01 GENERAL 74-3.01A Summary 74-3.01B Definitions 74-3.01C Submittals 74-3.01C(1) General 74-3.01C(2) Product Data |
939 | 74-3.01D Quality Assurance 74-3.01D(1) General 74-3.01D(2) Regulatory Requirements 74-3.01D(3) Manufacturer’s Field Services 74-3.01D(4) Field Quality Control 74-3.01D(5) Training 74-3.02 MATERIALS 74-3.02A General 74-3.02B Power and Metering Equipment 74-3.02B(1) General 74-3.02B(2) Service Pedestal Equipment 74-3.02B(3) Motor Control Center Equipment |
941 | 74-3.02C Pump Control 74-3.02C(1) General 74-3.02C(2) Water Level Monitoring System 74-3.02C(3) Pump Controller |
942 | 74-3.02D Conduit 74-3.02E Conductors and Cable 74-3.02E(1) General 74-3.02E(2) Conductors 74-3.02E(3) Conductor and Cable Identification 74-3.02F Nameplates and Warning Plates 74-3.02F(1) General 74-3.02F(2) Nameplate and Warning Plate Identification |
943 | 74-3.02G Miscellaneous Materials |
944 | 74-3.03 CONSTRUCTION 74-3.03A General 74-3.03B Installation 74-3.03B(1) General 74-3.03B(2) Conduit, Conductors, and Cable |
945 | 74-3.03B(3) Motor Control Center 74-3.03B(4) Panel LP 74-3.03B(5) Miscellaneous Materials 74-3.03C Conductor Splices 74-3.04 PAYMENT 74-4.01 GENERAL 74-4.01A Summary 74-4.01B Definitions 74-4.01C Submittals 74-4.01C(1) General 74-4.01C(2) Shop Drawings 74-4.01C(3) Product Data |
946 | 74-4.01C(4) Closeout Submittals 74-4.01D Quality Assurance 74-4.02 MATERIALS 74-4.02A General 74-4.02B Manufactured Units 74-4.02B(1) General |
947 | 74-4.02B(2) Components 74-4.02B(2)a General 74-4.02B(2)(b) Pumps 74-4.02B(2)(c) Ball Valves 74-4.02B(2)(d) Butterfly Valves 74-4.02B(2)(e) Pump Controller |
948 | 74-4.02B(2)(f) Booster Pump Enclosures 74-4.02B(2)(g) Pressure Gauges 74-4.02B(2)(h) Appurtenances 74-4.02B(3) Fabrication |
949 | 74-4.03 CONSTRUCTION 74-4.03A General 74-4.03B Foundation and Pad 74-4.03C Skid Installation 74-4.03D Nameplates 74-4.04 PAYMENT |
951 | 75 MISCELLANEOUS METAL 75-1.01 GENERAL 75-1.01A Summary 75-1.01B Definitions 75-1.01C Submittals 75-1.01D Quality Assurance 75-1.01D(1) General 75-1.01D(2) Qualifications 75-1.01D(3) Department Acceptance 75-1.02 MATERIALS 75-1.02A General |
952 | 75-1.02B Galvanizing |
954 | 75-1.02C–75-1.02H Reserved 75-1.03 CONSTRUCTION 75-1.04 PAYMENT 75-2.01 GENERAL 75-2.02 MATERIALS 75-2.02A General 75-2.02B Frames, Grates, and Covers 75-2.03 CONSTRUCTION 75-2.04 PAYMENT 75-3.01 GENERAL 75-3.01A Summary |
955 | 75-3.01B Definitions 75-3.01C Submittals 75-3.01C(1) General 75-3.01C(2) Bridge Deck Drainage System 75-3.01D Quality Assurance 75-3.01D(1) General 75-3.01D(2) Quality Control 75-3.01D(2)(a) General 75-3.01D(2)(b) Bridge Deck Drainage System 75-3.01D(2)(c) Nonskid Surface 75-3.01D(3) Department Acceptance 75-3.02 MATERIALS 75-3.02A General |
956 | 75-3.02B Bolted and Threaded Bar Connections 75-3.02C Anchorage Devices 75-3.02C(1) General 75-3.02C(2) Mechanical Expansion Anchors |
957 | 75-3.02C(3) Resin Capsule Anchors 75-3.02C(4) Cast-in-Place Concrete Inserts 75-3.02D Bridge Deck Drainage System 75-3.02D(1) General 75-3.02D(2) Pipe Connections and Joints |
958 | 75-3.02D(3) Fiberglass Pipes and Fittings 75-3.02D(4) PVC Pipes and Fittings 75-3.02E Bearing Devices 75-3.02F Nonskid Surface 75-3.03 CONSTRUCTION 75-3.03A General 75-3.03B Bolted and Threaded Bar Connections |
959 | 75-3.03C Anchorage Devices 75-3.03D Bridge Deck Drainage System 75-3.03E Bearing Devices 75-3.03F Nonskid Surface |
960 | 75-3.04 PAYMENT 75-4.01 GENERAL 75-4.02 MATERIALS 75-4.03 CONSTRUCTION 75-4.04 PAYMENT 75-5.01 GENERAL 75-5.01A Summary 75-5.01B Definitions 75-5.01C Submittals 75-5.01D Quality Assurance |
961 | 75-5.02 MATERIALS 75-5.03 CONSTRUCTION 75-5.04 PAYMENT |
963 | 76 WELLS |
965 | 77 LOCAL INFRASTRUCTURE |
967 | 78 INCIDENTAL CONSTRUCTION 78-1.01 GENERAL 78-1.02 MATERIALS 78-1.03 CONSTRUCTION 78-1.04 PAYMENT 78-2.01 GENERAL 78-2.02 MATERIALS 78-2.03 CONSTRUCTION 78-2.04 PAYMENT 78-4.01 GENERAL 78-4.01A General |
968 | 78-4.01B Materials 78-4.01C Construction 78-4.01D Payment 78-4.02 PAINTING TIMBER 78-4.02A General 78-4.02B Materials 78-4.02C Construction 78-4.02C(1) General 78-4.02C(2) Surface Preparation 78-4.02C(3) Application 78-4.02D Payment 78-4.03 PAINTING CONCRETE 78-4.03A General 78-4.03A(1) Summary 78-4.03A(2) Definitions 78-4.03A(3) Submittals 78-4.03A(4) Quality Assurance 78-4.03B Materials 78-4.03C Construction 78-4.03C(1) General |
969 | 78-4.03C(2) Surface Preparation 78-4.03C(3) Application 78-4.03D Payment 78-4.04 STAINING CONCRETE AND SHOTCRETE 78-4.04A General 78-4.04A(1) General 78-4.04A(1)(a) Summary 78-4.04A(1)(b) Definitions 78-4.04A(1)(c) Submittals 78-4.04A(1)(d) Quality Assurance 78-4.04A(1)(d)(i) General 78-4.04A(1)(d)(ii) Test Panels 78-4.04A(2) Materials 78-4.04A(2)(a) General 78-4.04A(2)(b) Stain |
970 | 78-4.04A(2)(c) Sealer 78-4.04A(2)(d) Sealing Compound 78-4.04A(3) Construction 78-4.04A(3)(a) General 78-4.04A(3)(b) Surface Preparation 78-4.04A(3)(c) Application 78-4.04A(4) Payment 78-4.04B Sculpted Shotcrete and Textured Concrete 78-4.04B(1) General 78-4.04B(1)(a) Summary 78-4.04B(1)(b) Definitions 78-4.04B(1)(c) Submittals 78-4.04B(1)(c)(i) General 78-4.04B(1)(c)(ii) Contractor Qualifications |
971 | 78-4.04B(1)(c)(iii) Application Plan 78-4.04B(1)(d) Quality Assurance 78-4.04B(1)(d)(i) General 78-4.04B(1)(d)(ii) Contractor Qualifications 78-4.04B(1)(d)(iii) Prestaining Meeting 78-4.04B(2) Materials 78-4.04B(3) Construction 78-4.04B(4) Payment 78-4.05 ROCK STAINING 78-4.05A GENERAL 78-4.05A(1) Summary 78-4.05A(2) Definitions 78-4.05A(3) Submittals |
972 | 78-4.05A(4) Quality Assurance 78-4.05A(4)(a) General 78-4.05A(4)(b) Test Plot 78-4.05B MATERIALS 78-4.05B(1) General 78-4.05B(2) Stain 78-4.05C CONSTRUCTION 78-4.05C(1) General 78-4.05C(2) Preparation 78-4.05C(3) Application 78-4.05D PAYMENT 78-4.06 ANTI-GRAFFITI COATING 78-4.06A General 78-4.06A(1) Summary 78-4.06A(2) Definitions 78-4.06A(3) Submittals |
973 | 78-4.06A(4) Quality Assurance 78-4.06B Materials 78-4.06C Construction 78-4.06D Payment 78-4.07 STAINING GALVANIZED SURFACES 78-4.08 PAINTING ELECTRICAL MATERIAL 78-4.08A General 78-4.08B Materials 78-4.08C Construction 78-4.08C(1) General 78-4.08C(2) Traffic Signal Faces and Fittings |
974 | 78-4.08D Payment 78-4.09–78-4.15 RESERVED 78-5.01 GENERAL 78-5.01A Summary 78-5.01B Definitions 78-5.01C Submittals 78-5.01D Quality Assurance 78-5.02 MATERIALS 78-5.03 CONSTRUCTION 78-5.04 PAYMENT 78-21.01 GENERAL |
975 | 78-21.02 MATERIALS 78-21.03 CONSTRUCTION 78-21.04 PAYMENT 78-22.01 GENERAL 78-22.02 MATERIALS 78-22.03 CONSTRUCTION 78-22.04 PAYMENT 79 RESERVED |
977 | 80 FENCES 80-1.01 GENERAL 80-1.02 MATERIALS 80-1.03 CONSTRUCTION 80-1.04 PAYMENT 80-2.01 GENERAL 80-2.01A Summary 80-2.01B Definitions |
978 | 80-2.01C Submittals 80-2.01D Quality Assurance 80-2.02 MATERIALS 80-2.02A General 80-2.02B Metal Posts and Braces 80-2.02C Wood Posts and Braces 80-2.02C(1) General 80-2.02C(2) Untreated |
979 | 80-2.02C(3) Treated |
980 | 80-2.02D Barbed Wire 80-2.02E Wire Mesh 80-2.02F Tension Wires, Hardware, and Grounding Materials 80-2.02G Gateways |
981 | 80-2.03 CONSTRUCTION |
982 | 80-2.04 PAYMENT 80-3.01 GENERAL 80-3.01A Summary 80-3.01B Definitions 80-3.01C Submittals 80-3.01D Quality Assurance |
983 | 80-3.02 MATERIALS 80-3.02A General 80-3.02B Posts and Braces 80-3.02C Fabric |
984 | 80-3.02D Tension Wires, Hog Rings, Turnbuckles, Truss Tighteners, Truss Rods, and Stretcher Bars and Bar Bands 80-3.02E Slats |
985 | 80-3.03 CONSTRUCTION 80-3.04 PAYMENT 80-10.01 GENERAL 80-10.01A Summary |
986 | 80-10.01B Definitions 80-10.01C Submittals 80-10.01D Quality Assurance 80-10.02 MATERIALS 80-10.03 CONSTRUCTION |
987 | 80-10.04 PAYMENT 80-15.01 GENERAL 80-15.01A General 80-15.01B Materials 80-15.01C Construction 80-15.01D Payment 80-15.02 RECONSTRUCT FENCES 80-15.02A General 80-15.02B Materials 80-15.02C Construction 80-15.02D Payment 80-15.03 SALVAGE FENCES 80-15.03A General 80-15.03B Materials 80-15.03C Construction 80-15.03D Payment |
988 | 80-15.04–80-15.08 RESERVED |
989 | DIVISION IX TRAFFIC CONTROL DEVICES 81 MISCELLANEOUS TRAFFIC CONTROL DEVICES 81-1.01 GENERAL 81-1.02 MATERIALS 81-1.03 CONSTRUCTION 81-1.04 PAYMENT 81-2.01 GENERAL 81-2.01A Summary 81-2.01B Definitions 81-2.01C Submittals 81-2.01D Quality Assurance |
990 | 81-2.02 MATERIALS 81-2.02A General 81-2.02B Wood Posts 81-2.02C Metal Posts 81-2.02D Flexible Posts 81-2.02E Target Plates |
991 | 81-2.02F Hardware 81-2.02G–81-2.02L Reserved 81-2.03 CONSTRUCTION 81-2.04 PAYMENT 81-3.01 GENERAL 81-3.01A Summary 81-3.01B Definitions 81-3.01C Submittals 81-3.01D Quality Assurance 81-3.02 MATERIALS 81-3.02A General 81-3.02B Nonreflective Pavement Markers 81-3.02B(1) General |
992 | 81-3.02B(2) Plastic Nonreflective Pavement Markers 81-3.02B(3) Ceramic Nonreflective Pavement Markers 81-3.02C Retroreflective Pavement Markers |
993 | 81-3.02D Hot Melt Bituminous Adhesive |
994 | 81-3.02E Epoxy Adhesive 81-3.03 CONSTRUCTION 81-3.03A General 81-3.03B Hot Melt Bituminous Adhesive 81-3.03C Epoxy Adhesive |
995 | 81-3.03D Pavement Recesses 81-3.04 PAYMENT 81-8.01 GENERAL 81-8.02 MATERIALS 81-8.03 CONSTRUCTION 81-8.03A General 81-8.03B Remove Pavement Markers 81-8.03C Reserved 81-8.04 PAYMENT |
997 | 82 SIGNS AND MARKERS 82-1.01 GENERAL 82-1.01A Summary 82-1.02 MATERIALS 82-1.03 CONSTRUCTION 82-1.04 PAYMENT 82-2.01 GENERAL 82-2.01A Summary 82-2.01B Definitions 82-2.01C Submittals |
998 | 82-2.01D Quality Assurance 82-2.02 MATERIALS 82-2.02A General |
999 | 82-2.02B Aluminum Sheeting 82-2.02C Retroreflective Sheeting 82-2.02D Process Colors and Film |
1000 | 82-2.02E Single-Sheet Aluminum Panels 82-2.02F Fiberglass-Reinforced Plastic Panels |
1001 | 82-2.02G Laminated Panels 82-2.02G(1) General 82-2.02G(2) Roadside Laminated Panels |
1002 | 82-2.02G(3) Overhead Laminated Panels 82-2.02H Formed Panels 82-2.03 CONSTRUCTION 82-2.03A General 82-2.03B Laminated Panels |
1003 | 82-2.04 PAYMENT 82-3.01 GENERAL 82-3.01A Summary 82-3.01B Definitions 82-3.01C Submittals 82-3.01D Quality Assurance 82-3.02 MATERIALS 82-3.02A General 82-3.02B Metal Posts 82-3.02C Wood Posts |
1004 | 82-3.02D Laminated Wood Box Posts 82-3.02E Sign Panel Fastening and Mounting Hardware 82-3.03 CONSTRUCTION 82-3.03A General |
1005 | 82-3.03B Sign Panel Installation 82-3.04 PAYMENT 82-4.01 GENERAL 82-4.02 MATERIALS 82-4.03 CONSTRUCTION |
1006 | 82-4.04 PAYMENT 82-5.01 GENERAL 82-5.01A Summary 82-5.01B Definitions 82-5.01C Submittals 82-5.01D Quality Assurance 82-5.02 MATERIALS 82-5.02A General |
1007 | 82-5.02B Wood Posts 82-5.02C Metal Posts 82-5.02D Flexible Posts 82-5.02E Target Plates |
1008 | 82-5.02F Reflectors 82-5.02G Hardware 82-5.02H Highway Post Markers 82-5.02I–82-5.02L Reserved 82-5.03 CONSTRUCTION 82-5.04 PAYMENT 82-9.01 GENERAL 82-9.02 MATERIALS 82-9.03 CONSTRUCTION 82-9.03A General |
1009 | 82-9.03B Installation of Sign Panels on Existing Frames 82-9.03C Installation of Removable Sign Panel Frames 82-9.03D Relocate Markers 82-9.03E Reset Markers 82-9.04 PAYMENT |
1011 | 83 RAILINGS AND BARRIERS 83-1.01 GENERAL 83-1.02 MATERIALS 83-1.02A General 83-1.02B Steel Parts and Hardware 83-1.02C Mortar 83-1.02D Markers 83-1.03 CONSTRUCTION 83-1.03A General 83-1.03B Mortar 83-1.03C Median Barriers 83-1.04 PAYMENT |
1012 | 83-2.01 GENERAL 83-2.01A General 83-2.01A(1) General 83-2.01A(2) Materials 83-2.01A(3) Construction 83-2.01A(4) Payment 83-2.01B Vegetation Control 83-2.02 MIDWEST GUARDRAIL SYSTEMS 83-2.02A General 83-2.02A(1) Summary 83-2.02A(2) Definitions 83-2.02A(3) Submittals 83-2.02A(4) Quality Assurance 83-2.02B Materials 83-2.02B(1) General 83-2.02B(1)(a) General 83-2.02B(1)(b) Steel Components and Hardware |
1013 | 83-2.02B(1)(c) Wood Posts and Blocks 83-2.02B(1)(d) Bolt Hole Grease 83-2.02B(1)(e) Components for Connection to a Concrete Surface 83-2.02B(2) End Anchor Assemblies and Rail Tensioning Assemblies |
1014 | 83-2.02B(3) Type WB-31 Transition Railings |
1015 | 83-2.02C Construction 83-2.02C(1) General 83-2.02C(1)(a) General 83-2.02C(1)(b) Posts 83-2.02C(1)(c) Bolt Holes and Cuts in Wood Posts and Blocks 83-2.02C(1)(d) Rail Elements 83-2.02C(1)(e) Connection to a Concrete Bridge Railing or Barrier |
1016 | 83-2.02C(1)(f) Anchor Bolts Set With Epoxy 83-2.02C(2) End Anchor Assemblies 83-2.02C(3) Type WB-31 Transition Railings 83-2.02D Payment 83-2.03 THRIE BEAM BARRIERS 83-2.03A General 83-2.03B Materials |
1017 | 83-2.03C Construction 83-2.03D Payment 83-2.04 TERMINAL SYSTEMS 83-2.04A General 83-2.04A(1) General 83-2.04A(2) Materials 83-2.04A(3) Construction 83-2.04A(4) Payment |
1018 | 83-2.04B Alternative In-Line Terminal Systems 83-2.04C Alternative Flared Terminal Systems 83-2.04D–83-2.04H Reserved 83-2.05 CALIFORNIA BRIDGE RAILS 83-2.05A General 83-2.05A(1) Summary 83-2.05A(2) Definitions 83-2.05A(3) Submittals 83-2.05A(4) Quality Assurance 83-2.05B Materials 83-2.05B(1) General 83-2.05B(2) Reinforced Concrete 83-2.05B(3) Metal Components |
1019 | 83-2.05B(4) Coatings 83-2.05C Construction 83-2.05D Payment 83-2.06 CHAIN LINK RAILINGS 83-2.06A General 83-2.06B Materials |
1020 | 83-2.06C Construction 83-2.06D Payment 83-2.07 CABLE RAILINGS 83-2.07A General 83-2.07B Materials |
1021 | 83-2.07C Construction 83-2.07D Payment 83-2.08 TUBULAR HANDRAILINGS 83-2.08A General 83-2.08B Materials 83-2.08C Construction |
1022 | 83-2.08D Payment 83-2.09 PIPE HANDRAILINGS 83-2.09A General 83-2.09B Materials 83-2.09C Construction 83-2.09D Payment 83-2.10–83-2.14 RESERVED 83-3.01 GENERAL 83-3.01A Summary 83-3.01B Definitions |
1023 | 83-3.01C Submittals 83-3.01D Quality Assurance 83-3.01D(1) General 83-3.01D(2) Quality Control 83-3.01D(2)(a) General 83-3.01D(2)(b) Barrier Smoothness 83-3.01D(2)(c) Barrier Reinforcement Positions 83-3.01D(3) Department Acceptance 83-3.02 MATERIALS 83-3.02A General 83-3.02B Concrete 83-3.02B(1) General |
1024 | 83-3.02B(2) Concrete for Extrusion or Slip form Methods 83-3.02C Bar Reinforcing Steel 83-3.02D Steel Plates and Hardware 83-3.02E Granular Backfill 83-3.02F Type K Concrete Barrier Reflectors 83-3.02G Connection of a Concrete Barrier to a Structure 83-3.02H Type 60K Portable Concrete Barriers |
1025 | 83-3.03 CONSTRUCTION 83-3.03A General 83-3.03A(1) General 83-3.03A(2) Closing Gaps in Concrete Barriers 83-3.03A(3) Adjusting Barrier Height 83-3.03A(4) Locating Expansion Joints 83-3.03A(5) Placing Barriers 83-3.03A(6) Barrier Construction Methods 83-3.03A(6)(a) General 83-3.03A(6)(b) Cast-In-Place-with-Fixed-Forms Method 83-3.03A(6)(c) Extrusion or Slip form Method 83-3.03A(6)(c)(i) General |
1026 | 83-3.03A(6)(c)(ii) Placing Concrete 83-3.03A(6)(c)(iii) Placing Reinforcing Bars 83-3.03A(6)(c)(iv) Maintaining Barrier Grades 83-3.03A(6)(c)(v) Constructing Expansion Joints 83-3.03A(7) Finishing 83-3.03A(8) Curing |
1027 | 83-3.03A(9) Smoothness 83-3.03A(10) Installing Tubular Handrailings 83-3.03A(11) Installing Barrier Markers 83-3.03A(12) Installing Reflectors 83-3.03A(13) Placing Granular Backfill 83-3.03B Concrete Barriers at Existing Structures 83-3.03C Connection of a Concrete Barrier to a Structure 83-3.03D Concrete Barrier Transitions 83-3.03E Type 60K Portable Concrete Barriers |
1028 | 83-3.03F Wildlife Passage Ways 83-3.04 PAYMENT 83-4.01 GENERAL 83-4.01A General 83-4.01B Materials 83-4.01C Construction 83-4.01D Payment 83-4.02–83-4.10 RESERVED 83-11.01 GENERAL 83-11.01A General |
1029 | 83-11.01B Materials 83-11.01C Construction 83-11.01D Payment 83-11.02 EXISTING GUARDRAILS 83-11.02A General 83-11.02A(1) General 83-11.02A(2) Materials 83-11.02A(3) Construction 83-11.02A(4) Payment 83-11.02B Remove Guardrails 83-11.02B(1) General 83-11.02B(2) Materials 83-11.02B(3) Construction 83-11.02B(4) Payment 83-11.02C Salvage Guardrails 83-11.02C(1) General 83-11.02C(2) Materials 83-11.02C(3) Construction |
1030 | 83-11.02C(4) Payment 83-11.02D Reconstruct Guardrails 83-11.02E Adjust Guardrails 83-11.02F–83-11.02J Reserved 83-11.03 EXISTING METAL BRIDGE RAILINGS 83-11.03A General 83-11.03A(1) General 83-11.03A(2) Materials 83-11.03A(3) Construction 83-11.03A(4) Payment 83-11.03B Reconstruct Metal Bridge Railings 83-11.03B(1) General 83-11.03B(1)(a) Summary 83-11.03B(1)(b) Definitions 83-11.03B(1)(c) Submittals 83-11.03B(1)(d) Quality Assurance 83-11.03B(2) Materials 83-11.03B(3) Construction |
1031 | 83-11.03B(4) Payment 83-11.03C–83-11.03G Reserved 83-11.04–83-11.08 RESERVED |
1033 | 84 MARKINGS 84-1.01 GENERAL 84-1.02 MATERIALS 84-1.03 CONSTRUCTION 84-1.04 PAYMENT 84-2.01 GENERAL 84-2.01A Summary 84-2.01B Definitions 84-2.01C Submittals 84-2.01D Quality Assurance |
1034 | 84-2.02 MATERIALS 84-2.02A General 84-2.02B Thermoplastic 84-2.02C Paint 84-2.02D Glass Beads 84-2.02E Thermoplastic Traffic Stripes and Pavement Markings with Enhanced Wet-Night Visibility 84-2.02F Two-Component Painted Traffic Stripes and Pavement Markings |
1035 | 84-2.02G Recessed Two-Component Painted Traffic Stripes and Pavement Markings 84-2.02H Traffic Stripe and Pavement Marking Tape 84-2.02I–84-2.02M Reserved 84-2.03 CONSTRUCTION 84-2.03A General 84-2.03B Surface Preparation 84-2.03C Application of Stripes and Markings 84-2.03C(1) General |
1036 | 84-2.03C(2) Thermoplastic Traffic Stripes and Pavement Markings 84-2.03C(2)(a) General 84-2.03C(2)(b) Extruded Thermoplastic Traffic Stripes and Pavement Markings 84-2.03C(2)(c) Sprayable Thermoplastic Traffic Stripes and Pavement Markings 84-2.03C(2)(d) Recessed Thermoplastic Traffic Stripes and Pavement Markings |
1037 | 84-2.03C(2)(e) Thermoplastic Traffic Stripes and Pavement Markings with Enhanced Wet-Night Visibility 84-2.03C(3) Painted Traffic Stripes and Pavement Markings 84-2.03C(3)(a) General |
1038 | 84-2.03C(3)(b) Two-Component Painted Traffic Stripes and Pavement Markings |
1039 | 84-2.03C(3)(c) Recessed Two-Component Painted Traffic Stripes and Pavement Markings 84-2.03C(4) Reserved 84-2.03C(5)–84-2.03C(10) Reserved 84-2.04 PAYMENT 84-3.01–84-3.10 RESERVED 84-8.01 GENERAL 84-8.01A Summary 84-8.01B Definitions 84-8.01C Submittals 84-8.01D Quality Assurance 84-8.02 MATERIALS 84-8.03 CONSTRUCTION 84-8.03A General |
1040 | 84-8.03B Rumble Strips in Concrete Pavement 84-8.03C Rumble Strips in Asphalt Concrete Pavement 84-8.04 PAYMENT 84-9.01 GENERAL 84-9.02 MATERIALS 84-9.03 CONSTRUCTION 84-9.03A General 84-9.03B Remove Traffic Stripes and Pavement Markings 84-9.03C Remove Traffic Stripes and Pavement Markings Containing Lead 84-9.03D Remove Contrast Treatment |
1041 | 84-9.03E–84-9.03J Reserved 84-9.04 PAYMENT 85 RESERVED |
1043 | DIVISION X ELECTRICAL WORK 86-88 RESERVED |
1045 | DIVISION XI MATERIALS 89 AGGREGATE 89-1.01 GENERAL 89-1.02 MATERIALS 89-1.03 CONSTRUCTION 89-1.04 PAYMENT |
1047 | 90 CONCRETE 90-1.01 GENERAL 90-1.01A Summary 90-1.01B Definitions 90-1.01C Submittals 90-1.01C(1) General 90-1.01C(2) Aggregate Gradation 90-1.01C(3) Cementitious Materials 90-1.01C(4) Admixtures 90-1.01C(5) Curing Compound |
1048 | 90-1.01C(6) Mix Design 90-1.01C(7) Concrete Delivery 90-1.01C(8) Testing 90-1.01C(9) Stationary Mixer Certification 90-1.01C(10) Protecting Concrete 90-1.01D Quality Assurance 90-1.01D(1) General 90-1.01D(2) Cementitious Material Content |
1049 | 90-1.01D(3) Shrinkage 90-1.01D(4) Concrete Uniformity 90-1.01D(5) Compressive Strength 90-1.01D(5)(a) General |
1051 | 90-1.01D(5)(b) Prequalification 90-1.01D(6) Curing Compound |
1052 | 90-1.02 MATERIALS 90-1.02A General 90-1.02B Cementitious Materials 90-1.02B(1) General |
1053 | 90-1.02B(2) Cement 90-1.02B(3) Supplementary Cementitious Materials |
1055 | 90-1.02C Aggregates 90-1.02C(1) General |
1056 | 90-1.02C(2) Coarse Aggregate 90-1.02C(3) Fine Aggregate |
1057 | 90-1.02C(4) Aggregate Gradation 90-1.02C(4)(a) General 90-1.02C(4)(b) Coarse Aggregate Gradation |
1058 | 90-1.02C(4)(c) Fine Aggregate Gradation 90-1.02C(4)(d) Combined Aggregate Gradation 90-1.02D Water |
1059 | 90-1.02E Admixtures 90-1.02E(1) General 90-1.02E(2) Chemical Admixtures |
1060 | 90-1.02E(3) Air-Entraining Admixtures 90-1.02F Proportioning Concrete 90-1.02F(1) General 90-1.02F(2) Storage of Aggregates 90-1.02F(3) Proportioning Devices |
1061 | 90-1.02F(4) Proportioning 90-1.02F(4)(a) General |
1062 | 90-1.02F(4)(b) Proportioning and Dispensing Liquid Admixtures 90-1.02F(4)(c) Automatic Proportioning |
1063 | 90-1.02G Mixing and Transporting Concrete 90-1.02G(1) General 90-1.02G(2) Machine Mixing |
1064 | 90-1.02G(3) Transporting Mixed Concrete |
1065 | 90-1.02G(4) Time or Quantity of Mixing 90-1.02G(5) Hand Mixing |
1066 | 90-1.02G(6) Quantity of Water and Penetration or Slump 90-1.02H Concrete in Corrosive Environments |
1067 | 90-1.02I Concrete in Freeze-Thaw Areas 90-1.02I(1) General 90-1.02I(2) Materials 90-1.02I(2)(a) General 90-1.02I(2)(b) Concrete Exposed to Deicing Chemicals |
1068 | 90-1.02J Curing Compound 90-1.03 CONSTRUCTION 90-1.03A General 90-1.03B Curing Concrete 90-1.03B(1) General 90-1.03B(2) Water Method |
1069 | 90-1.03B(3) Curing Compound Method 90-1.03B(3)(a) General 90-1.03B(3)(b) Materials |
1070 | 90-1.03B(3)(c) Mixing 90-1.03B(3)(d) Application 90-1.03B(4) Waterproof Membrane Method |
1071 | 90-1.03B(5) Forms-In-Place Method 90-1.03C Protecting Concrete 90-1.04 PAYMENT 90-2.01 GENERAL 90-2.01A Summary 90-2.01B Definitions 90-2.01C Submittals |
1072 | 90-2.01D Quality Assurance 90-2.02 MATERIALS 90-2.02A General 90-2.02B Cementitious Material |
1073 | 90-2.02C Aggregate 90-2.02D Water 90-2.02E Production 90-2.03 CONSTRUCTION 90-2.04 PAYMENT 90-3.01 GENERAL 90-3.01A Summary |
1074 | 90-3.01B Definitions 90-3.01C Submittals 90-3.01C(1) General 90-3.01C(2) Volumetric Proportioning 90-3.01C(3) Certificate of Compliance 90-3.01C(4) Weighmaster Certificate 90-3.01C(5) Production Data |
1075 | 90-3.01D Quality Assurance 90-3.01D(1) General 90-3.01D(2) Penetration 90-3.01D(3) Aggregate Moisture 90-3.01D(4) Concrete Uniformity 90-3.02 MATERIALS 90-3.02A General |
1076 | 90-3.02B Volumetric Proportioning 90-3.02B(1) General 90-3.02B(2) Proportioning 90-3.02B(3) Mixer Requirements 90-3.02B(4) Mixer Calibration |
1077 | 90-3.02B(5) Mixing Concrete 90-3.03 CONSTRUCTION 90-3.04 PAYMENT |
1078 | 90-4.01 GENERAL 90-4.01A Summary 90-4.01B Definitions 90-4.01C Submittals 90-4.01C(1) General 90-4.01C(2) Certificates of Compliance 90-4.01C(3) Precast Concrete Quality Control Plan |
1079 | 90-4.01C(4) Daily Production Log 90-4.01C(5) Precast Concrete Report 90-4.01D Quality Assurance 90-4.01D(1) General |
1080 | 90-4.01D(2) Quality Control 90-4.01D(2)(a) General 90-4.01D(2)(b) Quality Control Meeting 90-4.01D(2)(c) Sampling, Testing, and Inspecting |
1081 | 90-4.01D(3) Department Acceptance 90-4.02 MATERIALS |
1082 | 90-4.03 CONSTRUCTION |
1083 | 90-4.04 PAYMENT 90-5.01 GENERAL 90-5.01A Summary 90-5.01B Definitions 90-5.01C Submittals 90-5.01D Quality Assurance 90-5.01D(1) General 90-5.01D(2) Quality Control 90-5.01D(2)(a) General 90-5.01D(2)(b) Compressive Strength |
1084 | 90-5.01D(2)(c) Prequalification of Mix Design 90-5.01D(2)(d) Mock-up |
1085 | 90-5.01D(2)(e) Field Quality Control 90-5.01D(2)(e)(i) General 90-5.01D(2)(e)(ii) Fine Aggregate Moisture Content 90-5.01D(2)(e)(iii) Slump Flow and Visual Stability Index 90-5.01D(3) Department Acceptance 90-5.02 MATERIALS 90-5.03 CONSTRUCTION 90-5.04 PAYMENT 90-6.01 GENERAL 90-6.01A Summary 90-6.01B Definitions 90-6.01C Submittals 90-6.01C(1) General 90-6.01C(2) Mix Design |
1086 | 90-6.01D Quality Assurance 90-6.01D(1) General 90-6.01D(2) Quality Control 90-6.01D(2)(a) General 90-6.01D(2)(b) Prequalification 90-6.01D(2)(c) Unit Weight of Fresh Concrete 90-6.01D(2)(d) Air-Dry Unit Weight 90-6.01D(3) Department Acceptance 90-6.01D(3)(a) General 90-6.01D(3)(b) Penetration 90-6.01D(3)(c) Air Content 90-6.01D(3)(d) Compressive Strength 90-6.02 MATERIALS 90-6.02A General |
1087 | 90-6.02B Aggregate 90-6.02C Proportioning 90-6.03 CONSTRUCTION 90-6.04 PAYMENT |
1089 | 91 PAINT 91-1.01 GENERAL 91-1.01A Summary 91-1.01B Definitions 91-1.01C Submittals 91-1.01D Quality Assurance 91-1.02 MATERIALS 91-1.03 CONSTRUCTION 91-1.04 PAYMENT 91-2.01 GENERAL 91-2.02 MATERIALS 91-2.02A General 91-2.02B Exterior-Grade Latex Paint |
1090 | 91-2.02C Moisture-Cured Polyurethane Coating 91-2.03 CONSTRUCTION 91-2.04 PAYMENT 91-3.01 GENERAL 91-3.02 MATERIALS 91-3.02A General 91-3.02B Latex-Base Wood Primer 91-3.02C Latex-Base Paint for Exterior Wood 91-3.03 CONSTRUCTION 91-3.04 PAYMENT 91-4.01 GENERAL 91-4.02 MATERIALS 91-4.02A General |
1091 | 91-4.02B Acrylic Emulsion Paint for Exterior Masonry 91-4.02C–91-4.02F Reserved 91-4.03 CONSTRUCTION 91-4.04 PAYMENT |
1093 | 92 ASPHALT BINDERS 92-1.01 GENERAL 92-1.01A Summary 92-1.01B Definitions 92-1.01C Submittals 92-1.01D Quality Assurance 92-1.01D(1) General 92-1.01D(2) Certification 92-1.01D(3) Sampling 92-1.02 MATERIALS 92-1.02A General 92-1.02B Performance Grade Asphalt Binders |
1096 | 92-1.03 CONSTRUCTION 92-1.04 PAYMENT |
1102 | 93 RESERVED |
1103 | 94 ASPHALTIC EMULSIONS 94-1.01 GENERAL 94-1.01A Summary 94-1.01B Definitions 94-1.01C Submittals 94-1.01D Quality Assurance 94-1.02 MATERIALS 94-1.02A General 94-1.02B Anionic Asphaltic Emulsions |
1105 | 94-1.02C Cationic Asphaltic Emulsions |
1106 | 94-1.02D Polymer Modified Asphaltic Emulsions |
1107 | 94-1.02E Quick-setting Asphaltic Emulsions |
1108 | 94-1.03 CONSTRUCTION 94-1.04 PAYMENT |
1111 | 95 EPOXY 95-1.01 GENERAL 95-1.01A Summary 95-1.01B Definitions 95-1.01C Submittals 95-1.01D Quality Assurance 95-1.02 MATERIALS 95-1.02A General 95-1.02B Packaging, Labeling, and Storing 95-1.02C Epoxy Binder 95-1.02D Epoxy Adhesive for Bonding Freshly Mixed Concrete to Hardened Concrete |
1112 | 95-1.02E Rapid Set Epoxy Adhesive for Pavement Markers 95-1.02F Standard Set Epoxy Adhesive for Pavement Markers |
1113 | 95-1.02G Epoxy Sealant for Inductive Loops 95-1.02H Epoxy Resin Adhesive for Pressure Injection Grouting of Concrete Pavement 95-1.03 CONSTRUCTION |
1114 | 95-1.04 PAYMENT |
1115 | 96 GEOSYNTHETICS 96-1.01 GENERAL 96-1.01A Summary 96-1.01B Definitions 96-1.01C Submittals 96-1.01C(1) General 96-1.01C(2) Geotechnical Subsurface Reinforcement 96-1.01D Quality Assurance 96-1.02 MATERIALS 96-1.02A General 96-1.02B Filter Fabric |
1116 | 96-1.02C Geocomposite Wall Drain 96-1.02D Geotechnical Subsurface Reinforcement 96-1.02D(1) General 96-1.02D(2) Long Term Design Strength |
1117 | 96-1.02E Silt Fence Fabric 96-1.02F Gravel-Filled Bag 96-1.02G Sediment Filter Bag |
1118 | 96-1.02H Temporary Cover 96-1.02I Rock Slope Protection Fabric 96-1.02J Paving Fabric |
1119 | 96-1.02K Paving Mat 96-1.02L Paving Grid 96-1.02M Paving Geocomposite Grid 96-1.02N Geocomposite Strip Membrane |
1120 | 96-1.02O Subgrade Enhancement Geotextile 96-1.02P Biaxial Geogrid |
1121 | 96-1.02Q Geosynthetic Bond Breaker 96-1.02R–96-1.02Y Reserved 96-1.03 CONSTRUCTION 96-1.04 PAYMENT 97–98 RESERVED |
1123 | DIVISION XII BUILDING CONSTRUCTION 99 BUILDING CONSTRUCTION |