CDC DesignConstructionStandards 2017
$48.75
CDC Reference Guidelines – Design & Construction Standards
Published By | Publication Date | Number of Pages |
CDC | 2017 | 723 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
40 | … 2.0 Introduction |
41 | 2.1 Administration of Thethe Reference Guidelines |
43 | 2.2 Codes and Standards |
50 | 2.3 Accessibility |
51 | 2.4 Sustainable Design and High Performance Building Guidelines 2.4 Sustainable Design and High Performance Building Guidelines |
53 | Per E.O. 13514 Section 2 (g) (iii), Federal agencies are required to ensure that at least 15 percent of the agency’s existing buildings (above 5,000 gross square feet) and building leases (above 5,000 gross square feet) meet the Guiding Principles by … GUIDING PRINCIPLES FOR SUSTAINABLE NEW CONSTRUCTION AND MAJOR RENOVATIONS |
78 | 2.5 Furniture & Equipment Design and Procurement |
79 | 2.6 Commissioning Policy |
80 | 2.7 Hazardous Materials Policy |
82 | 2.8 Energy Policy |
84 | 2.9 Water Management Policy |
86 | 2.10 Dispatch of Loads |
88 | 2.11 Value Engineering |
90 | 3 Procedures 3.0 Introduction |
91 | 3.1 CDC General Drawing Requirements (CAD) |
92 | END OF SECTION |
93 | 3.2 Drawing Requirements |
94 | END OF SECTION 3.3 Existing Condition Facility Documentation |
99 | END OF SECTION 3.4 Numbering Systems |
105 | 3.5 Furniture Procurement |
106 | 3.6 Commissioning |
112 | 3.7 Hazardous Materials 3.8 Health and Safety 3.9 Operating and Maintenance Manuals |
113 | 4 PLANNING AND DESIGN GUIDELINES 4.0 Introduction |
114 | 4.1 General Planning Criteria |
115 | 4.1.1 Master Plan |
118 | 4.1.2 Environmental Health and Safety |
121 | 4.1.3 Security |
125 | 4.1.4 Civil & Site Development Guidelines |
128 | 4.1.5 Campus Mechanical |
133 | 4.1.6 Campus Electrical |
138 | 4.1.7 Building Shell |
139 | 4.1.8 General Facilities |
165 | 4.2 General Laboratory Planning |
172 | 4.2.1 Biological Laboratories |
176 | 4.2.2 Chemical Laboratories |
178 | 4.2.3 Engineering Laboratories |
180 | 4.2.4 Radiation Laboratories |
182 | 4.3 General Animal Facility Planning |
194 | 4.3.1 Primate Facilities |
196 | 4.3.2 Rodent Facilities |
198 | 4.3.3 Canine Facilities |
200 | 4.3.4 Insect Facilities |
204 | 4.3.4a Flying Insect Facilities (Mosquitoes) |
208 | 4.3.4b Crawling Insect Facilities (Ticks, Mites, Lice, Fleas) |
210 | 4.4 Office Planning |
218 | 4.5 Support Facilities Planning 4.5.0 Building Support Facilities |
219 | 4.5.1 Conference Facilities With Videoconferencing |
231 | 4.5.2 Cafeterias |
233 | 4.5.3 Break Rooms |
235 | 4.5.4 Vending Areas |
237 | 4.5.5 Snack Bars |
239 | 4.5.6 Travel Office |
241 | 4.5.7 Share (Employee Store) |
243 | 4.5.8 Credit Union |
245 | 4.5.9 Lifestyle Facilities |
251 | 4.5.10 Lobby Areas |
253 | 4.5.11 Toilet Facilities |
257 | 4.5.12 Stairwells |
260 | 4.5.13 Janitor Closets |
262 | 4.5.14 Mechanical Rooms |
265 | 4.5.15 Electrical Switchgear Rooms (Main Service Entrance) |
269 | 4.5.16 Electrical Rooms |
273 | 4.5.17 Telephone Equipment Rooms (PBX) |
279 | 4.5.18 Telecommunication/LAN Rooms |
284 | 4.5.19 Lactation Rooms |
285 | 4.5.20 Campus Support Facilities END OF SECTION |
286 | 4.5.21 Central Utility Plants |
290 | 4.5.22 Data Processing Facilities |
295 | 4.5.23 Transshipping Facilities |
298 | 4.5.24 Laboratory Chemical Storage Facilities |
301 | 4.5.25 Waste Handling Facilities |
304 | 4.5.26 Parking Facilities |
308 | 4.5.27 Integrated Facilities Management System (IFMS) |
313 | 4.5.28 Stationary Storage Battery System Rooms |
320 | 5 BUILDING ELEMENTS |
321 | 5A SUBSTRUCTURE 5A0 Introduction |
322 | 5A1 Foundations 5A1.10 Standard Foundations |
323 | 5A1.20 Special Foundations |
324 | 5A1.30 Slab On Grade |
325 | 5A2 Below Grade Construction 5A2.10 Below Grade Excavations |
326 | 5A2.20 Below Grade Walls |
327 | 5B SHELL 5B.0 Introduction |
328 | 5B1.10 Floor Construction |
330 | 5B1.20 Roof Construction |
332 | 5B2 Exterior Enclosure 5B2.10 Exterior Walls |
334 | 5B2.20 Exterior Windows |
335 | 5B2.30 Exterior Doors |
336 | 5B3 Roofing 5B3.10 Roof Coverings |
337 | 5B3.20 Roof Openings |
338 | 5C INTERIORS 5C.0 Introduction |
339 | 5C1 Interior Construction 5C1.10 Partitions |
341 | 5C1.20 Interior Doors |
346 | 5C1.30 Fittings |
350 | 5C2 Stairs 5C2.10 Interior Stairs Construction |
351 | 5C2.20 Interior Stair Finishes |
353 | 5C3 Interior Finishes 5C3.10 Wall Finishes |
355 | 5C3.20 Floor Finishes |
359 | 5C3.30 Ceiling Finishes |
360 | 5D SERVICES 5D0 Introduction |
361 | 5D1 Conveying Systems 5D1.10 Elevators and Lifts |
362 | 5D1.20 Escalators and Moving Walks |
363 | 5D2 Plumbing Systems |
364 | 5D2.10 Plumbing Fixtures |
365 | 5D2.20 Domestic Water Distribution |
367 | 5D2.30 Sanitary Waste and Vent Systems |
368 | 5D2.40 Rain Water Drainage |
369 | 5D2.50 Gas Distributing Systems |
370 | 5D3 HVAC 5D3.10 Boiler Room Piping and Specialties |
371 | 5D3.20 Piping Distribution Systems |
373 | 5D3.21 Air Distribution Systems |
378 | 5D3.22 Exhaust Ventilation Systems |
379 | 5D3.23 Steam Distribution Systems |
381 | 5D3.25 Glycol Distribution Systems |
382 | 5D3.30 Building Automation Systems |
387 | 5D4 Fire Protection |
389 | 5D4.10 Sprinklers |
392 | 5D4.20 Standpipe Systems |
393 | 5D4.30 Fire Pumps |
394 | 5D4.40 Fire Protection Specialties |
395 | 5D4.50 Other Fire Protection Systems |
396 | 5D5 Electrical 5D5.10 Electrical Service & Distribution |
423 | 5D5.11 Electrical Studies |
432 | 5D5.20 Lighting & Branch Wiring |
444 | 5D5.30 Communications, Security & Fire Alarm Systems |
455 | 5D5.40 Lightning Protection/ Grounding |
459 | 5D5.41 Emergency, Legally Required Standby, and Standby Power Systems |
469 | 5D5.42 Special Equipment |
473 | 5D5.43 Communication And Signaling Systems |
474 | 5D5.44 Freezer Alarm System |
475 | 5E EQUIPMENT & FURNISHINGS 5E0 Introduction |
477 | 5E1 Equipment 5E1.10 Office And Office Support Equipment |
481 | 5E1.20 Laboratory And Laboratory Support Equipment |
484 | 5E1.30 Vehicular Equipment |
485 | 5E2 Furnishings 5E2.10 Fixed Furnishings |
487 | 5E2.20 Movable Furnishings |
500 | 5F SPECIAL CONSTRUCTION & DEMOLITION 5F0 Introduction |
501 | 5F1 Special Construction Systems 5F1.10 Special Structures |
502 | 5F1.20 Integrated Construction |
504 | 5F1.50 Special Controls & Instrumentation |
505 | 5F2 Selective Building Demolition 5F2.10 Building Elements Demolition |
506 | 5F2.20 Hazardous Components Abatement |
507 | 5G BUILDING SITEWORK 5G0 General |
509 | 5G1 Site Preparation |
510 | 5G1.10 Site Preparation |
512 | 5G1.20 Site Demolition & Relocation |
514 | 5G1.30 Site Earthwork |
516 | 5G1.40 Hazardous Waste Remediation |
517 | 5G2 Site Improvements 5G2.10 Roadways |
519 | 5G2.20 Parking Lots |
521 | 5G2.30 Pedestrian Circulation |
523 | 5G2.40 Site Development |
526 | 5G2.50 Landscaping |
529 | 5G2.60 Irrigation |
531 | 5G3 Site Mechanical Utilities 5G3.10 Water Supply |
533 | 5G3.20 Sanitary Sewer |
534 | 5G3.30 Storm Sewer |
536 | 5G3.40 Heating Distribution |
537 | 5G3.50 Cooling Distribution |
538 | 5G3.60 Fuel Distribution |
540 | 5G4 Site Electrical Utilities 5G4.10 Electrical Distribution |
542 | 5G4.20 Site Lighting |
545 | 5G4.30 Site Communications & Security |
546 | 5G4.90 Other Site Electrical Utilities |
547 | 5G5 Other Site Construction 5G5.10 Service And Pedestrian Tunnels |
548 | 5G5.20 Pest Management Program During Construction |
549 | 6 APPENDIX 6.10 Request for Exception Form |
550 | 6.20 Request for Clarification Form |
551 | 6.30 Interiors |
601 | 6.40 Document components, writing/editing rules and uniformatUniFormat |
602 | 6.50 Survey Control Monuments’ Locations and Descriptions Electrical |
603 | 6.60 Acronyms |
607 | 6.70 Glossary |
608 | 6.80 Accessibility |
611 | 6.90 Facilities Master Planning Guide |
612 | 6.91 Wayfinding Masterplan |
666 | 6.92 BAS Graphics Standards |
696 | 6.93 Lactation Support Program |
703 | 6.94 ELECTRICAL Arc-Flash and Shock Hazard Appropriate PPE Required |
704 | Arc-Flash and Shock Hazard Appropriate PPE Required |