GSA PBS Project Management Guide N/A
$63.05
GSA PBS Project Management Guide
Published By | Publication Date | Number of Pages |
GSA | N/A | 154 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Project Delivery Method – Design/Build-Bridging |
2 | 2.0.0.0.0.0 Planning |
3 | 2.1.0.0.0.0 Pre-Project Planning (Overview) |
4 | 2.1.0.0.0.1 Pre-Project (Preliminary) Planning |
5 | 1.1.0.0.0.0.a Project Coordination |
6 | 1.1.1.0.0.0.a PMP: Assemble Project Team |
7 | 2.1.12.0.2.0 Existing Conditions Assessments |
8 | 2.1.10.0.0.0 Local Portfolio Plans |
9 | 2.1.1.0.0.0 Campus/Facility Master Plans |
10 | 2.1.3.0.0.0 Building Engineering Report |
11 | 2.1.4.0.0.0 Accessibility Survey |
12 | 2.1.3.1.0.0 Fire/Life Safety Study |
13 | 2.1.5.0.0.0 Hazardous Materials Survey |
14 | 2.1.6.0.0.0 Highest and Best Use Appraisal (R&A) |
15 | 2.1.8.0.0.0 Safety/Security Study(ies) |
16 | 2.1.9.0.0.0 Energy Conservation Audit |
17 | 2.4.1.0.0.0.a Feasibility |
18 | 2.4.1.0.0.0.b Feasibility (Continued) |
19 | 6.3.0.0.0.0 CMa/Commissioning Authority (Cx) Services |
20 | 6.1.0.0.0.0.a Project Consultant Task Order |
21 | 2.4.1.0.0.0.c Feasibility: R&A |
22 | 2.4.1.0.0.0.d Feasibility: New Construction |
23 | 2.4.1.0.0.0.e Feasibility: Lease Construction |
24 | 4.0.0.0.0.0.a Site Acquisition |
25 | 4.0.0.0.0.0.b Site Investigation Tasks for FS |
26 | 4.0.0.0.0.0.c Site Investigation for FS |
27 | 2.2.0.0.0.0 NHPA Tasks for FS through Site Acquisition |
28 | 2.3.0.0.0.0 NEPA Tasks for FS through Site Acquisition |
29 | 2.6.0.0.0.0 Relocation Planning |
30 | 1.1.2.0.0.0 Commissioning Authority (Cx) (Overview) |
31 | 1.1.1.0.0.0.b Project Management Plan (PMP) |
32 | 1.1.1.0.0.0.c Acquisition Plan Program/Project |
33 | 1.1.1.0.0.0.d Procurement Snapshot |
34 | 1.1.1.0.0.0.e Procurement Snapshot (Continued) |
35 | 1.1.3.1.0.0 Initiate Project in PIP |
36 | 1.1.3.2.0.0 Project Updates in PIP |
37 | 1.1.5.0.0.0 Project Website(s) |
38 | 2.4.4.0.0.0 Project Funding Request 3.4.5.0.0.0 Budget Authorization Act (Congressional Approval) |
39 | 6.1.1.0.1.0 Courthouse Orientation and Design Start Workshop |
40 | 2.5.0.0.0.0 Program Development Study (PDS) |
41 | 3.4.0.0.0.0 Construction Authorization (Prospectus) |
42 | 6.0.0.0.0.0 Design |
43 | 4.1.0.0.0.0 Site Selection/Technical Studies: NHPA and NEPA Process (Overview) |
44 | 4.2.0.0.0.0 Site Acquisition (Overview) |
45 | 6.2.0.0.0.0 A/E Procurement (Overview) |
46 | 6.2.1.0.0.0.a A/E Services Scope of Work (Overview) |
47 | 6.4.2.0.0.0 Source Selection Plan |
48 | 6.2.1.0.0.0.b Design Charrette (Optional) |
49 | 6.2.1.0.0.0.c Design Competition |
50 | 6.2.2.0.0.0, 6.2.4.0.0.0, and 6.2.5.0.0.0 A/E Source Selection/Evaluation Process |
51 | 6.2.6.0.0.0 A/E Contract for Design |
52 | 6.3.1.0.0.0.a CMa Scope of Work |
53 | 6.3.1.0.0.0.b CxA Scope of Work (if apart from CMa) |
54 | 6.3.1.0.0.0.b CxA Scope of Work (if apart from CMa) |
55 | 6.1.0.0.0.0.b Art-in-Architecture Contract |
56 | 6.7.0.0.0.0 Concept Design (Overview) |
57 | 6.7.0.0.0.1.a Concept Design |
58 | 6.7.0.0.0.1.b Concept Design (Continued) |
59 | 6.7.2.0.0.0 Concept Design Partnering Workshop |
60 | 6.7.4.0.0.0 Design Charrette Documents |
61 | 6.7.7.0.0.0 Design Excellence Peer Review |
62 | 6.7.6.3.0.0 Concept Design Review Comments Including Concept Design Selection and 6.7.9.0.0.0 VE Workshop |
63 | 6.7.12.2.0.0 Concept Design Review Comments (Urban Design Review Boards) |
64 | 6.7.14.0.0.0 Final Concept Presentation to the Commissioner 6.7.15.0.0.0 Final Concept Approval Memorandum |
65 | 6.7.14.0.1.0 Art-in-Architecture Concept Design |
66 | 6.8.0.0.0.0 Design Development (Overview) |
67 | 6.8.0.0.0.1 Design Development (Process) |
68 | 6.8.0.0.0.2 Utility Rebate Program Review |
69 | 6.8.1.0.0.0 DD Program Review Workshop |
70 | 6.8.2.0.0.0 DD Systems Selection Analyses |
71 | 6.8.5.0.0.0 DD Submission (35%) |
72 | 6.8.9.0.0.0 Construction Strategy/Phasing Plan |
73 | 6.8.11.0.0.0 Independent OCA PBS-P100 Review and IGE |
74 | 7.0.0.0.0.0 Construction |
75 | 6.10.0.0.0.0 Construction Procurement |
76 | 6.10.1.0.0.0 GC/CC Source Selection Plan |
77 | 6.10.2.0.0.0 Advertisement for Construction Services |
78 | 6.10.4.0.0.0 Pre-Proposal Conference |
79 | 6.10.11.0.0.0 Proposal Document Addenda |
80 | 6.10.1.1.0.0 GC/CC Selection Evaluation Factors (Phase I) 6.10.8.0.0.0 GC/CC Evaluations/Selection (Phase I) |
81 | 6.10.13.0.0.0 GC/CC Evaluations/Selection (Phase II) |
82 | 6.10.14.0.0.0 Construction Contract Award and 6.10.15.0.0.0 Pre-NTP Documents (Bonds, Insurance, Security, etc.) |
83 | 7.1.0.0.0.0 (0% to 100% Construction) |
84 | 7.1.1.0.0.0 Notice To Proceed |
85 | 6.9.0.0.0.0 Construction Documents |
86 | 6.9.3.0.0.0 CD Program Review Workshop (CD Start) 6.9.10.0.0.0 CD Program Review Workshop (90%) |
87 | 6.7.13.0.0.0 Independent OCA PBS-P100 Review 6.7.13.0.0.0 Independent OCA PBS-P100 Review |
88 | 6.7.12.0.0.0 CMa’s CD Review/Estimate (100% CDs) |
89 | 6.10.16.0.0.0 Professional Services Task Orders (Construction) |
90 | 7.1.4.0.0.0 Art-in-Architecture Fabrication Task Order |
91 | 7.1.2.0.0.0 Construction Kick-off Meeting |
92 | 7.1.3.0.0.0.a Partnering Session |
93 | 7.1.3.0.0.0.b Partnering Session: Timing Benefits and Drawbacks |
94 | 7.1.5.0.0.0 Groundbreaking/Construction Start |
95 | 7.1.6.0.0.0.a Construction Administration |
96 | 7.1.6.0.0.0.b Construction Administration (Overview) |
97 | 7.1.6.0.0.1.a Construction Administration: Safety |
98 | 7.1.6.0.0.1.b Construction Administration: Project Cost Management |
99 | 7.1.6.0.0.1.c Requests for Information (RFI) |
100 | 7.1.6.2.0.0 Construction Schedules |
101 | 7.1.6.4.0.0 Submittal Schedule/Log/Submissions |
102 | 7.1.2.0.1.2 Quality Assurance Quality Control Plans/Reports (QAQC Review Process) |
103 | 7.1.6.5.0.0 Inspections and Testing Schedule |
104 | 7.1.6.6.0.0 Special Testing/Mock-up Plans/Reports |
105 | 7.1.6.1.1.1 Project Web-Cam |
106 | 7.1.6.8.0.0 GC/CC Contract Modifications |
107 | 7.1.9.0.0.0 GC/CC Evaluations (NIH) |
108 | 7.1.7.0.0.0 CII Benchmarking |
109 | 7.1.10.0.0.0 Follow-up Partnering Session |
110 | 7.1.8.0.0.0 Construction Excellence Peer Review (1st) 7.1.11.0.0.0 Construction Excellence Peer Review (2nd) |
111 | 7.1.12.0.0.0 Art-In-Architecture Deliverable |
112 | 7.1.13.0.0.0 Additional Phases Delivery (TI, Phases, Annexes) |
113 | 7.1.14.0.0.0 Turnover Documents |
114 | 7.1.14.3.0.0 O&M Manuals Submittal |
115 | 7.1.14.4.0.0 Warranties and Certifications |
116 | 7.1.14.6.0.0 Material Samples, Attic Stock and Spare Parts |
117 | 7.1.14.7.0.0 Contractor Record Drawings |
118 | 7.1.14.2.0.0 Systems Start-Up and Testing (Commissioning) |
119 | 7.1.14.5.0.0 Property Management Training |
120 | 7.1.15.0.0.0.a Substantial Completion Certification |
121 | 7.1.15.0.0.0.b Substantial Completion Certificate:Final Cleaning |
122 | 7.1.16.0.0.0 Occupancy Permit |
123 | 7.1.14.1.0.0.a Final Inspections |
124 | 7.1.14.1.0.0.b Punch Lists |
125 | 7.1.15.0.0.0.c Substantial Completion Certificate: Final Completion |
126 | 7.2.0.0.0.0 Closeout (Admin) |
127 | 8.3.4.0.1.2 Maintenance and Cleaning Contracts (GC/CC Option) |
128 | 7.2.1.0.0.0 A/E Record Documents |
129 | 7.2.2.0.0.0 Updated PBS CAD Library Submission |
130 | 7.2.4.0.0.0 Dedication Ceremony Documents |
131 | 7.2.5.0.0.0 Project Awards (LEED, EnergyStar, AiA, PM, etc.) |
132 | 7.2.3.1.0.0 Contract Closeout (GC/CC) |
133 | 7.2.3.2.1.0 Project Management Closeout |
134 | 7.2.3.2.0.0 Financial Closeout |
135 | 8.1.3.0.1.0 Real Property Acquisition Advice (GSA Form 1011) |
136 | 8.0.0.0.0.0 Tenant Occupancy |
137 | 8.1.0.0.0.0 Occupancy Agreements and RENT (Overview) |
138 | 8.1.1.2.2.0.a Occupancy Agreement Planning Phase (Initial Draft) |
139 | 8.1.1.3.0.0 Occupancy Agreement based on PDS-(Proposed Draft)/Updates |
140 | 8.1.1.4.0.0 Concept Design 8.1.1.4.1.0 Design Development 8.1.1.4.2.0 Mid-Point Construction Documents 8.1.1.4.2.0 Mid-Point Construction Documents |
141 | 8.1.1.2.2.0.b Occupancy Agreement (Accepted Draft): Before Construction Award |
142 | 8.1.1.3.1.0 Occupancy Agreement (Accepted Draft): During Construction |
143 | 8.1.1.5.0.1 Final Occupancy Agreement |
144 | 8.1.1.5.0.0 Final Occupancy Agreement (Reconciliation) |
145 | 8.1.2.0.0.0 National CAD/CIFM Standards |
146 | 8.1.3.0.0.0 Initial RENT Start |
147 | 8.2.0.0.0.0 Furniture, Fixtures, and Equipment (FFE)/Move-In (Overview) |
148 | 8.2.1.0.0.0 Systems Furniture |
149 | 8.2.2.0.0.0.a Telecommunications Installation – R& |
150 | 8.2.2.0.0.0.b Telecommunications Installation – New Construction |
151 | 8.2.3.0.0.0 Agency IT/Data Systems |
152 | 8.2.4.0.0.0 Security Systems Installation |
153 | 8.2.5.0.0.0 USMS A/V and Security Systems Installation |
154 | 8.2.6.0.0.0 Tenant Move-In |