Shopping Cart

No products in the cart.

ICC IPSDC 2021 1stptg

$28.71

International Private Sewage Disposal Code, 2nd Printing

Published By Publication Date Number of Pages
ICC 2021 99
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

The 2021 IPSDC® companion to the IPC® includes provisions for design, installation, and inspection of private sewage disposal systems, and provides flexibility in the development of safe systems.

PDF Catalog

PDF Pages PDF Title
1 2021 IPSDC® INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE®
2 2021 IPSDC® INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE® TITLE PAGE
3 COPYRIGHT
4 PREFACE
10 ARRANGEMENT AND FORMAT OF THE 2021 IPSDC
14 TABLE OF CONTENTS
16 CHAPTER 1 SCOPE AND ADMINISTRATION
PART 1—SCOPE AND APPLICATION
SECTION 101 SCOPE AND GENERAL REQUIREMENTS
SECTION 102 APPLICABILITY
17 PART 2—ADMINISTRATION AND ENFORCEMENT
SECTION 103 CODE COMPLIANCE AGENCY
SECTION 104 DUTIES AND POWERS OF THE CODE OFFICIAL
18 SECTION 105 APPROVAL
19 SECTION 106 PERMITS
20 SECTION 107 CONSTRUCTION DOCUMENTS
21 SECTION 108 NOTICE OF APPROVAL
SECTION 109 TEMPORARY EQUIPMENT, SYSTEMS AND USES
SECTION 110 SERVICE UTILITIES
SECTION 111 INSPECTIONS
22 SECTION 112 MEANS OF APPEAL
SECTION 113 BOARD OF APPEALS
SECTION 114 VIOLATIONS
23 SECTION 115 STOP WORK ORDER
24 CHAPTER 2 DEFINITIONS
SECTION 201 GENERAL
SECTION 202 GENERAL DEFINITIONS
28 CHAPTER 3 GENERAL REGULATIONS
SECTION 301 GENERAL
SECTION 302 SPECIFIC LIMITATIONS
SECTION 303 FLOOD HAZARD AREAS
SECTION 304 ALTERNATIVE ENGINEERED DESIGN
30 CHAPTER 4 SITE EVALUATION AND REQUIREMENTS
SECTION 401 GENERAL
SECTION 402 SLOPE
SECTION 403 SOIL BORINGS AND EVALUATION
31 SECTION 404 PERCOLATION OR PERMEABILITY EVALUATION
32 SECTION 405 SOIL VERIFICATION
33 SECTION 406 SITE REQUIREMENTS
TABLE 406.1 MINIMUM HORIZONTAL SEPARATION DISTANCES FOR SOIL ABSORPTION SYSTEMS
34 FIGURE 406.7.3 CONCEPTUAL DESIGN SKETCH FOR ALTERING SLOPES
36 CHAPTER 5 MATERIALS
SECTION 501 GENERAL
SECTION 502 IDENTIFICATION
SECTION 503 PERFORMANCE REQUIREMENTS
SECTION 504 TANKS
37 TABLE 504.1.2 TANK CAPACITY
SECTION 505 PIPE, JOINTS AND CONNECTIONS
38 TABLE 505.1 PRIVATE SEWAGE DISPOSAL SYSTEM PIPE
TABLE 505.1.1 DISTRIBUTION PIPE
39 SECTION 506 PROHIBITED JOINTS AND CONNECTIONS
40 CHAPTER 6 SOIL ABSORPTION SYSTEMS
SECTION 601 GENERAL
SECTION 602 SIZING SOIL ABSORPTION SYSTEMS
SECTION 603 RESIDENTIAL SIZING
SECTION 604 OTHER BUILDING SIZING
EQUATION 6-1
SECTION 605 INSTALLATION OF CONVENTIONAL SOIL ABSORPTION SYSTEMS
41 TABLE 603.1 MINIMUM ABSORPTION AREA FOR ONE- AND TWO-FAMILY DWELLINGS
TABLE 604.1(1) MINIMUM ABSORPTION AREA FOR OTHER THAN ONE- AND TWO-FAMILY DWELLINGS
42 TABLE 604.1(2) CONVERSION FACTOR
43 TABLE 604.1(2)—continued CONVERSION FACTOR
TABLE 605.3 EFFECTIVE SQUARE-FOOT ABSORPTION AREA FOR SEEPAGE PITS
44 CHAPTER 7 PRESSURE DISTRIBUTION SYSTEMS
SECTION 701 GENERAL
SECTION 702 DESIGN LOADING RATE
TABLE 702.1 SOIL REQUIRED
TABLE 702.2 DESIGN LOADING RATE
SECTION 703 SYSTEM DESIGN
45 FORMULA 7-1
TABLE 703.3 HAZEN-WILLIAMS FRICTION FACTOR
EQUATION 7-1
EQUATION 7-2
EQUATION 7-3
SECTION 704 BED AND TRENCH CONSTRUCTION
SECTION 705 PUMPS
46 SECTION 706 DOSING
TABLE 706.1 ESTIMATED VOLUME FOR VARIOUS DIAMETER PIPES
48 CHAPTER 8 TANKS
SECTION 801 GENERAL
SECTION 802 SEPTIC TANKS AND OTHER TREATMENT TANKS
49 TABLE 802.7.1 SEPTIC TANK CAPACITY FOR ONE AND TWO-FAMILY DWELLINGS
TABLE 802.7.2 ADDITIONAL CAPACITY FOR OTHER BUILDINGS
50 TABLE 802.7.2—continued ADDITIONAL CAPACITY FOR OTHER BUILDINGS
TABLE 802.8 MINIMUM HORIZONTAL SEPARATION DISTANCES FOR TREATMENT TANKS
51 TABLE 802.11.1 PUMP CHAMBER SIZES
SECTION 803 MAINTENANCE AND SLUDGE DISPOSAL
SECTION 804 CHEMICAL RESTORATION
SECTION 805 HOLDING TANKS
TABLE 805.2 MINIMUM LIQUID CAPACITY OF HOLDING TANKS
52 CHAPTER 9 MOUND SYSTEMS
SECTION 901 GENERAL
SECTION 902 SOIL AND SITE REQUIREMENTS
TABLE 902.2 MINIMUM SOIL DEPTHS FOR MOUND SYSTEM INSTALLATION
SECTION 903 SYSTEM DESIGN
53 EQUATION 9-1
EQUATION 9-2
EQUATION 9-3
EQUATION 9-4
54 TABLE 903.1(1) DESIGN CRITERIA FOR A MOUND FOR A ONE-BEDROOM HOME ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL
TABLE 903.1(2) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL
55 TABLE 903.1(3) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL
TABLE 903.1(4) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL
56 TABLE 903.1(4)—continued DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL
TABLE 903.1(5) DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK
57 TABLE 903.1(6) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK
TABLE 903.1(7) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK
58 TABLE 903.1(7)—continued DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK
TABLE 903.1(8) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK
59 TABLE 903.1(9) DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE
TABLE 903.1(10) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE
60 TABLE 903.1(11) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE
TABLE 903.1(12) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE
61 TABLE 903.1(12)—continued DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE
EQUATION 9-5
EQUATION 9-6
EQUATION 9-7
EQUATION 9-8
TABLE 903.5.5 DOWNSLOPE AND UPSLOPE WIDTH CORRECTIONS FOR MOUNDS ON SLOPING SITES
TABLE 903.6 INFILTRATIVE CAPACITY OF NATURAL SOIL
EQUATION 9-9
EQUATION 9-10
62 EQUATION 9-11
EQUATION 9-12
SECTION 904 CONSTRUCTION TECHNIQUES
64 CHAPTER 10 CESSPOOLS
SECTION 1001 GENERAL
66 CHAPTER 11 RESIDENTIAL WASTEWATER SYSTEMS
SECTION 1101 GENERAL
68 CHAPTER 12 INSPECTIONS
SECTION 1201 GENERAL
SECTION 1202 INSPECTIONS
70 CHAPTER 13 NONLIQUID SATURATED TREATMENT SYSTEMS
SECTION 1301 GENERAL
72 CHAPTER 14 REFERENCED STANDARDS
ASTM
74 CISPI
CSA
ICC
NSF
75 UL
76 APPENDIX A SYSTEM LAYOUT ILLUSTRATIONS
A101 SYSTEM LAYOUTS
FIGURE A101.1(1) (SECTION 403.1.1) EXAMPLE OF SOIL-BORING LOCATIONS FOR TWO CONTIGUOUS ABSORPTION AREAS
FIGURE A101.1(2) (SECTION 405.2.4) MONITORING WELL DESIGN
77 FIGURE A101.1(3) (SECTION 406.6.7) DESIGN OF FILLED AREA SYSTEM
FIGURE A101.1(4) (SECTION 605.7) OBSERVATION PIPE
78 FIGURE A101.1(5) (SECTION 703.1) PRESSURE DISTRIBUTION SYSTEM DESIGN
FIGURE A101.1(6) (SECTION 903.1) MOUND USING THREE TRENCHES FOR ABSORPTION AREA
79 FIGURE A101.1(7) (SECTION 903.1) PLAN VIEW OF MOUND USING A BED FOR THE ABSORPTION AREA
FIGURE A101.1(8) (SECTION 903.1) CROSS SECTION OF A MOUND SYSTEM USING THREE TRENCHES FOR THE ABSORPTION AREA
80 FIGURE A101.1(9) (SECTION 903.1) CROSS SECTION OF A MOUND SYSTEM USING A BED FOR THE ABSORPTION AREA
FIGURE A101.1(10) (SECTION 903.1) DISTRIBUTION PIPE LAYOUT
82 APPENDIX B TABLES FOR PRESSURE DISTRIBUTION SYSTEMS
B101 PRESSURE DISTRIBUTION SYSTEMS
TABLE B101.1(1) REQUIRED DISTRIBUTION PIPE DIAMETERS FOR VARIOUS HOLE DIAMETERS, HOLE SPACINGS AND DISTRIBUTION PIPE LENGTHS (SCHEDULE 40 PLASTIC PIPE)
83 FIGURE B101.1(1) DISTRIBUTION PIPE DISCHARGE RATEa
TABLE B101.1(2) RECOMMENDED MANIFOLD DIAMETERS FOR VARIOUS MANIFOLD LENGTHS, NUMBER OF DISTRIBUTION PIPES AND DISTRIBUTION PIPE DISCHARGE RATES (SCHEDULE 40 PLASTIC PIPE)
84 FIGURE B101.1(2) PUMP DOSING RATEa
TABLE B101.1(3) FRICTION LOSSa IN SCHEDULE 40 PLASTIC PIPE (C = 150)
85 TABLE B101.1(3)—continued FRICTION LOSSa IN SCHEDULE 40 PLASTIC PIPE (C = 150)
86 FIGURE B101.1(3) MINIMUM DOSE VOLUME BASED ON PIPE SIZE, LENGTH AND NUMBERaFor
88 APPENDIX C BOARD OF APPEALS
[A] C101 GENERAL
90 INDEX
96 ICC EVALUATION SERVICE
97 ICC LEARNING CENTER
98 ICC ASSESSMENT CENTER
99 ICC DIGITAL CODES LIBRARY
ICC IPSDC 2021 1stptg
$28.71