ICC IPSDC 2021 1stptg
$28.71
International Private Sewage Disposal Code, 2nd Printing
Published By | Publication Date | Number of Pages |
ICC | 2021 | 99 |
The 2021 IPSDC® companion to the IPC® includes provisions for design, installation, and inspection of private sewage disposal systems, and provides flexibility in the development of safe systems.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 2021 IPSDC® INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE® |
2 | 2021 IPSDC® INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE® TITLE PAGE |
3 | COPYRIGHT |
4 | PREFACE |
10 | ARRANGEMENT AND FORMAT OF THE 2021 IPSDC |
14 | TABLE OF CONTENTS |
16 | CHAPTER 1 SCOPE AND ADMINISTRATION PART 1—SCOPE AND APPLICATION SECTION 101 SCOPE AND GENERAL REQUIREMENTS SECTION 102 APPLICABILITY |
17 | PART 2—ADMINISTRATION AND ENFORCEMENT SECTION 103 CODE COMPLIANCE AGENCY SECTION 104 DUTIES AND POWERS OF THE CODE OFFICIAL |
18 | SECTION 105 APPROVAL |
19 | SECTION 106 PERMITS |
20 | SECTION 107 CONSTRUCTION DOCUMENTS |
21 | SECTION 108 NOTICE OF APPROVAL SECTION 109 TEMPORARY EQUIPMENT, SYSTEMS AND USES SECTION 110 SERVICE UTILITIES SECTION 111 INSPECTIONS |
22 | SECTION 112 MEANS OF APPEAL SECTION 113 BOARD OF APPEALS SECTION 114 VIOLATIONS |
23 | SECTION 115 STOP WORK ORDER |
24 | CHAPTER 2 DEFINITIONS SECTION 201 GENERAL SECTION 202 GENERAL DEFINITIONS |
28 | CHAPTER 3 GENERAL REGULATIONS SECTION 301 GENERAL SECTION 302 SPECIFIC LIMITATIONS SECTION 303 FLOOD HAZARD AREAS SECTION 304 ALTERNATIVE ENGINEERED DESIGN |
30 | CHAPTER 4 SITE EVALUATION AND REQUIREMENTS SECTION 401 GENERAL SECTION 402 SLOPE SECTION 403 SOIL BORINGS AND EVALUATION |
31 | SECTION 404 PERCOLATION OR PERMEABILITY EVALUATION |
32 | SECTION 405 SOIL VERIFICATION |
33 | SECTION 406 SITE REQUIREMENTS TABLE 406.1 MINIMUM HORIZONTAL SEPARATION DISTANCES FOR SOIL ABSORPTION SYSTEMS |
34 | FIGURE 406.7.3 CONCEPTUAL DESIGN SKETCH FOR ALTERING SLOPES |
36 | CHAPTER 5 MATERIALS SECTION 501 GENERAL SECTION 502 IDENTIFICATION SECTION 503 PERFORMANCE REQUIREMENTS SECTION 504 TANKS |
37 | TABLE 504.1.2 TANK CAPACITY SECTION 505 PIPE, JOINTS AND CONNECTIONS |
38 | TABLE 505.1 PRIVATE SEWAGE DISPOSAL SYSTEM PIPE TABLE 505.1.1 DISTRIBUTION PIPE |
39 | SECTION 506 PROHIBITED JOINTS AND CONNECTIONS |
40 | CHAPTER 6 SOIL ABSORPTION SYSTEMS SECTION 601 GENERAL SECTION 602 SIZING SOIL ABSORPTION SYSTEMS SECTION 603 RESIDENTIAL SIZING SECTION 604 OTHER BUILDING SIZING EQUATION 6-1 SECTION 605 INSTALLATION OF CONVENTIONAL SOIL ABSORPTION SYSTEMS |
41 | TABLE 603.1 MINIMUM ABSORPTION AREA FOR ONE- AND TWO-FAMILY DWELLINGS TABLE 604.1(1) MINIMUM ABSORPTION AREA FOR OTHER THAN ONE- AND TWO-FAMILY DWELLINGS |
42 | TABLE 604.1(2) CONVERSION FACTOR |
43 | TABLE 604.1(2)—continued CONVERSION FACTOR TABLE 605.3 EFFECTIVE SQUARE-FOOT ABSORPTION AREA FOR SEEPAGE PITS |
44 | CHAPTER 7 PRESSURE DISTRIBUTION SYSTEMS SECTION 701 GENERAL SECTION 702 DESIGN LOADING RATE TABLE 702.1 SOIL REQUIRED TABLE 702.2 DESIGN LOADING RATE SECTION 703 SYSTEM DESIGN |
45 | FORMULA 7-1 TABLE 703.3 HAZEN-WILLIAMS FRICTION FACTOR EQUATION 7-1 EQUATION 7-2 EQUATION 7-3 SECTION 704 BED AND TRENCH CONSTRUCTION SECTION 705 PUMPS |
46 | SECTION 706 DOSING TABLE 706.1 ESTIMATED VOLUME FOR VARIOUS DIAMETER PIPES |
48 | CHAPTER 8 TANKS SECTION 801 GENERAL SECTION 802 SEPTIC TANKS AND OTHER TREATMENT TANKS |
49 | TABLE 802.7.1 SEPTIC TANK CAPACITY FOR ONE AND TWO-FAMILY DWELLINGS TABLE 802.7.2 ADDITIONAL CAPACITY FOR OTHER BUILDINGS |
50 | TABLE 802.7.2—continued ADDITIONAL CAPACITY FOR OTHER BUILDINGS TABLE 802.8 MINIMUM HORIZONTAL SEPARATION DISTANCES FOR TREATMENT TANKS |
51 | TABLE 802.11.1 PUMP CHAMBER SIZES SECTION 803 MAINTENANCE AND SLUDGE DISPOSAL SECTION 804 CHEMICAL RESTORATION SECTION 805 HOLDING TANKS TABLE 805.2 MINIMUM LIQUID CAPACITY OF HOLDING TANKS |
52 | CHAPTER 9 MOUND SYSTEMS SECTION 901 GENERAL SECTION 902 SOIL AND SITE REQUIREMENTS TABLE 902.2 MINIMUM SOIL DEPTHS FOR MOUND SYSTEM INSTALLATION SECTION 903 SYSTEM DESIGN |
53 | EQUATION 9-1 EQUATION 9-2 EQUATION 9-3 EQUATION 9-4 |
54 | TABLE 903.1(1) DESIGN CRITERIA FOR A MOUND FOR A ONE-BEDROOM HOME ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL TABLE 903.1(2) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL |
55 | TABLE 903.1(3) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL TABLE 903.1(4) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL |
56 | TABLE 903.1(4)—continued DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL TABLE 903.1(5) DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK |
57 | TABLE 903.1(6) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK TABLE 903.1(7) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK |
58 | TABLE 903.1(7)—continued DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK TABLE 903.1(8) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK |
59 | TABLE 903.1(9) DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE TABLE 903.1(10) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE |
60 | TABLE 903.1(11) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE TABLE 903.1(12) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE |
61 | TABLE 903.1(12)—continued DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE EQUATION 9-5 EQUATION 9-6 EQUATION 9-7 EQUATION 9-8 TABLE 903.5.5 DOWNSLOPE AND UPSLOPE WIDTH CORRECTIONS FOR MOUNDS ON SLOPING SITES TABLE 903.6 INFILTRATIVE CAPACITY OF NATURAL SOIL EQUATION 9-9 EQUATION 9-10 |
62 | EQUATION 9-11 EQUATION 9-12 SECTION 904 CONSTRUCTION TECHNIQUES |
64 | CHAPTER 10 CESSPOOLS SECTION 1001 GENERAL |
66 | CHAPTER 11 RESIDENTIAL WASTEWATER SYSTEMS SECTION 1101 GENERAL |
68 | CHAPTER 12 INSPECTIONS SECTION 1201 GENERAL SECTION 1202 INSPECTIONS |
70 | CHAPTER 13 NONLIQUID SATURATED TREATMENT SYSTEMS SECTION 1301 GENERAL |
72 | CHAPTER 14 REFERENCED STANDARDS ASTM |
74 | CISPI CSA ICC NSF |
75 | UL |
76 | APPENDIX A SYSTEM LAYOUT ILLUSTRATIONS A101 SYSTEM LAYOUTS FIGURE A101.1(1) (SECTION 403.1.1) EXAMPLE OF SOIL-BORING LOCATIONS FOR TWO CONTIGUOUS ABSORPTION AREAS FIGURE A101.1(2) (SECTION 405.2.4) MONITORING WELL DESIGN |
77 | FIGURE A101.1(3) (SECTION 406.6.7) DESIGN OF FILLED AREA SYSTEM FIGURE A101.1(4) (SECTION 605.7) OBSERVATION PIPE |
78 | FIGURE A101.1(5) (SECTION 703.1) PRESSURE DISTRIBUTION SYSTEM DESIGN FIGURE A101.1(6) (SECTION 903.1) MOUND USING THREE TRENCHES FOR ABSORPTION AREA |
79 | FIGURE A101.1(7) (SECTION 903.1) PLAN VIEW OF MOUND USING A BED FOR THE ABSORPTION AREA FIGURE A101.1(8) (SECTION 903.1) CROSS SECTION OF A MOUND SYSTEM USING THREE TRENCHES FOR THE ABSORPTION AREA |
80 | FIGURE A101.1(9) (SECTION 903.1) CROSS SECTION OF A MOUND SYSTEM USING A BED FOR THE ABSORPTION AREA FIGURE A101.1(10) (SECTION 903.1) DISTRIBUTION PIPE LAYOUT |
82 | APPENDIX B TABLES FOR PRESSURE DISTRIBUTION SYSTEMS B101 PRESSURE DISTRIBUTION SYSTEMS TABLE B101.1(1) REQUIRED DISTRIBUTION PIPE DIAMETERS FOR VARIOUS HOLE DIAMETERS, HOLE SPACINGS AND DISTRIBUTION PIPE LENGTHS (SCHEDULE 40 PLASTIC PIPE) |
83 | FIGURE B101.1(1) DISTRIBUTION PIPE DISCHARGE RATEa TABLE B101.1(2) RECOMMENDED MANIFOLD DIAMETERS FOR VARIOUS MANIFOLD LENGTHS, NUMBER OF DISTRIBUTION PIPES AND DISTRIBUTION PIPE DISCHARGE RATES (SCHEDULE 40 PLASTIC PIPE) |
84 | FIGURE B101.1(2) PUMP DOSING RATEa TABLE B101.1(3) FRICTION LOSSa IN SCHEDULE 40 PLASTIC PIPE (C = 150) |
85 | TABLE B101.1(3)—continued FRICTION LOSSa IN SCHEDULE 40 PLASTIC PIPE (C = 150) |
86 | FIGURE B101.1(3) MINIMUM DOSE VOLUME BASED ON PIPE SIZE, LENGTH AND NUMBERaFor |
88 | APPENDIX C BOARD OF APPEALS [A] C101 GENERAL |
90 | INDEX |
96 | ICC EVALUATION SERVICE |
97 | ICC LEARNING CENTER |
98 | ICC ASSESSMENT CENTER |
99 | ICC DIGITAL CODES LIBRARY |