IMC 12:2012 Edition
$45.77
International Mechanical Code
Published By | Publication Date | Number of Pages |
ICC | 2012 | 159 |
Establishes minimum regulations for mechanical systems using prescriptive and performance-related provisions. First introduced in 1996, the IMC was developed with broad-based principles that make possible the use of new materials, methods and design. Changes include:
- New and existing mechanical systems must be maintained in accordance with ASHRAE/ACCA/ANSI Standard 180.
- Parking garage exhaust now defined as environmental air.
- Includes specifications for grease reservoirs in commercial cooking exhaust duct systems.
- Includes requirements for underground grease ducts.
- Requires any combustible material in a return air plenum to be listed and labeled to verify compliance with ASTM E-84 or UL 723.
- Air dispersion systems are now allowed.
- New requirements for evaporative coolers.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 2012 INTERNATIONAL MECHANICAL CODE® |
2 | 2012 INTERNATIONAL MECHANICAL CODE® IMC® TITLE PAGE |
3 | COPYRIGHT |
4 | PREFACE |
8 | EFFECTIVE USE OF THE INTERNATIONAL MECHANICAL CODE |
12 | LEGISLATION |
14 | TABLE OF CONTENTS |
18 | CHAPTER 1 SCOPE AND ADMINISTRATION PART 1–SCOPE AND APPLICATION SECTION 101 GENERAL SECTION 102 APPLICABILITY |
19 | PART 2–ADMINISTRATION AND ENFORCEMENT SECTION 103 DEPARTMENT OF MECHANICAL INSPECTION SECTION 104 DUTIES AND POWERS OF THE CODE OFFICIAL |
20 | SECTION 105 APPROVAL SECTION 106 PERMITS |
22 | SECTION 107 INSPECTIONS AND TESTING |
23 | SECTION 108 VIOLATIONS |
24 | SECTION 109 MEANS OF APPEAL |
25 | SECTION 110 TEMPORARY EQUIPMENT, SYSTEMS AND USES |
26 | CHAPTER 2 DEFINITIONS SECTION 201 GENERAL SECTION 202 GENERAL DEFINITIONS |
38 | CHAPTER 3 GENERAL REGULATIONS SECTION 301 GENERAL |
39 | SECTION 302 PROTECTION OF STRUCTURE |
40 | SECTION 303 EQUIPMENT AND APPLIANCE LOCATION SECTION 304 INSTALLATION |
42 | SECTION 305 PIPING SUPPORT TABLE 305.4 PIPING SUPPORT SPACINGa SECTION 306 ACCESS AND SERVICE SPACE |
44 | SECTION 307 CONDENSATE DISPOSAL TABLE 307.2.2 CONDENSATE DRAIN SIZING |
45 | SECTION 308 CLEARANCE REDUCTION [B] SECTION 309 TEMPERATURE CONTROL [F] SECTION 310 EXPLOSION CONTROL |
46 | TABLE 308.6 CLEARANCE REDUCTION METHODSb [F] SECTION 311 SMOKE AND HEAT VENTS SECTION 312 HEATING AND COOLING LOAD CALCULATIONS |
48 | CHAPTER 4 VENTILATION SECTION 401 GENERAL TABLE 401.5 OPENING SIZES IN LOUVERS, GRILLES AND SCREENS PROTECTING AIR INTAKE OPENINGS SECTION 402 NATURAL VENTILATION |
49 | SECTION 403 MECHANICAL VENTILATION |
50 | TABLE 403.3 MINIMUM VENTILATION RATES |
51 | TABLE 403.3—continued MINIMUM VENTILATION RATES |
52 | TABLE 403.3—continued MINIMUM VENTILATION RATES |
53 | EQUATION 4-1 TABLE 403.3.1.2 ZONE AIR DISTRIBUTION EFFECTIVENESSa,b,c,d,e EQUATION 4-2 EQUATION 4-3 EQUATION 4-4 EQUATION 4-5 |
54 | TABLE 403.3.2.3.2 SYSTEM VENTILATION EFFICIENCYa,b EQUATION 4-6 EQUATION 4-7 EQUATION 4-8 SECTION 404 ENCLOSED PARKING GARAGES SECTION 405 SYSTEMS CONTROL |
55 | SECTION 406 VENTILATION OF UNINHABITED SPACES |
56 | CHAPTER 5 EXHAUST SYSTEMS SECTION 501 GENERAL |
57 | SECTION 502 REQUIRED SYSTEMS EQUATION 5-1 |
63 | SECTION 503 MOTORS AND FANS SECTION 504 CLOTHES DRYER EXHAUST |
64 | TABLE 504.6.4.1 DRYER EXHAUST DUCT FITTING EQUIVALENT LENGTH |
65 | SECTION 505 DOMESTIC KITCHEN EXHAUST EQUIPMENT SECTION 506 COMMERCIAL KITCHEN HOOD VENTILATION SYSTEM DUCTS AND EXHAUST EQUIPMENT |
70 | SECTION 507 COMMERCIAL KITCHEN HOODS |
71 | TABLE 507.11 MINIMUM DISTANCE BETWEEN THE LOWEST EDGE OF A GREASE FILTER AND THE COOKING SURFACE OR THE HEATING SURFACE |
72 | SECTION 508 COMMERCIAL KITCHEN MAKEUP AIR |
73 | SECTION 509 FIRE SUPPRESSION SYSTEMS SECTION 510 HAZARDOUS EXHAUST SYSTEMS |
74 | TABLE 510.8 MINIMUM DUCT THICKNESS |
75 | TABLE 510.8.2 CLEARANCE TO COMBUSTIBLES SECTION 511 DUST, STOCK AND REFUSE CONVEYING SYSTEMS SECTION 512 SUBSLAB SOIL EXHAUST SYSTEMS |
76 | TABLE 511.2 CONSTRUCTION, CLEARANCE AND TERMINATION REQUIREMENTS FOR SINGLE-WALL METAL CHIMNEYS SECTION 513 SMOKE CONTROL SYSTEMS |
77 | EQUATION 5-2 |
78 | EQUATION 5-3 EQUATION 5-4 |
80 | SECTION 514 ENERGY RECOVERY VENTILATION SYSTEMS |
82 | CHAPTER 6 DUCT SYSTEMS SECTION 601 GENERAL |
83 | SECTION 602 PLENUMS |
84 | SECTION 603 DUCT CONSTRUCTION AND INSTALLATION TABLE 603.4 DUCT CONSTRUCTION MINIMUM SHEET METAL THICKNESSES FOR SINGLE DWELLING UNITS |
86 | SECTION 604 INSULATION |
87 | SECTION 605 AIR FILTERS SECTION 606 SMOKE DETECTION SYSTEMS CONTROL |
88 | [B] SECTION 607 DUCT AND TRANSFER OPENINGS TABLE 607.3.2.1 FIRE DAMPER RATING |
94 | CHAPTER 7 COMBUSTION AIR SECTION 701 GENERAL |
96 | CHAPTER 8 CHIMNEYS AND VENTS SECTION 801 GENERAL |
97 | SECTION 802 VENTS TABLE 802.2 VENT APPLICATION |
98 | SECTION 803 CONNECTORS TABLE 803.9(1) MINIMUM CHIMNEY CONNECTOR THICKNESS FOR LOW-HEAT APPLIANCES TABLE 803.9(2) MINIMUM CHIMNEY CONNECTOR THICKNESS FOR MEDIUM- AND HIGH-HEAT APPLIANCE |
99 | TABLE 803.10.4 CHIMNEY CONNECTOR SYSTEMS AND CLEARANCES TO COMBUSTIBLE WALL MATERIALS FOR DOMESTIC HEATING APPLIANCESa, b, c, d TABLE 803.10.6 CONNECTOR CLEARANCES TO COMBUSTIBLES SECTION 804 DIRECT-VENT, INTEGRAL VENT AND MECHANICAL DRAFT SYSTEMS |
100 | SECTION 805 FACTORY-BUILT CHIMNEYS |
101 | SECTION 806 METAL CHIMNEYS |
102 | CHAPTER 9 SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT SECTION 901 GENERAL SECTION 902 MASONRY FIREPLACES SECTION 903 FACTORY-BUILT FIREPLACES SECTION 904 PELLET FUEL-BURNING APPLIANCES SECTION 905 FIREPLACE STOVES AND ROOM HEATERS SECTION 906 FACTORY-BUILT BARBECUE APPLIANCES SECTION 907 INCINERATORS AND CREMATORIES SECTION 908 COOLING TOWERS, EVAPORATIVE CONDENSERS AND FLUID COOLERS |
103 | SECTION 909 VENTED WALL FURNACES SECTION 910 FLOOR FURNACES SECTION 911 DUCT FURNACES SECTION 912 INFRARED RADIANT HEATERS SECTION 913 CLOTHES DRYERS |
104 | SECTION 914 SAUNA HEATERS SECTION 915 ENGINE AND GAS TURBINE-POWERED EQUIPMENT AND APPLIANCES SECTION 916 POOL AND SPA HEATERS SECTION 917 COOKING APPLIANCES |
105 | SECTION 918 FORCED-AIR WARM-AIR FURNACES |
106 | SECTION 919 CONVERSION BURNERS SECTION 920 UNIT HEATERS SECTION 921 VENTED ROOM HEATERS SECTION 922 KEROSENE AND OIL-FIRED STOVES SECTION 923 SMALL CERAMIC KILNS SECTION 924 STATIONARY FUEL CELL POWER SYSTEMS SECTION 925 MASONRY HEATERS SECTION 926 GASEOUS HYDROGEN SYSTEMS SECTION 927 RADIANT HEATING SYSTEMS |
107 | SECTION 928 EVAPORATIVE COOLING EQUIPMENT |
108 | CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS SECTION 1001 GENERAL SECTION 1002 WATER HEATERS SECTION 1003 PRESSURE VESSELS SECTION 1004 BOILERS |
109 | TABLE 1004.3.1 BOILER TOP CLEARANCES SECTION 1005 BOILER CONNECTIONS SECTION 1006 SAFETY AND PRESSURE RELIEF VALVES AND CONTROLS |
110 | SECTION 1007 BOILER LOW-WATER CUTOFF SECTION 1008 STEAM BLOWOFF VALVE SECTION 1009 HOT WATER BOILER EXPANSION TANK EQUATION 10-1 SECTION 1010 GAUGES SECTION 1011 TESTS |
112 | CHAPTER 11 REFRIGERATION SECTION 1101 GENERAL SECTION 1102 SYSTEM REQUIREMENTS |
113 | SECTION 1103 REFRIGERATION SYSTEM CLASSIFICATION |
114 | [F] TABLE 1103.1 REFRIGERANT CLASSIFICATION, AMOUNT AND OEL |
115 | [F] TABLE 1103.1—continued REFRIGERANT CLASSIFICATION, AMOUNT AND OEL |
116 | [F] TABLE 1103.1—continued REFRIGERANT CLASSIFICATION, AMOUNT AND OEL |
117 | [F] TABLE 1103.1—continued REFRIGERANT CLASSIFICATION, AMOUNT AND OEL |
118 | SECTION 1104 SYSTEM APPLICATION REQUIREMENTS |
119 | TABLE 1104.3. 2MAXIMUM PERMISSIBLE QUANTITIES OF REFRIGERANTS SECTION 1105 MACHINERY ROOM, GENERAL REQUIREMENTS EQUATION 11-1 |
120 | EQUATION 11-2 SECTION 1106 MACHINERY ROOM, SPECIAL REQUIREMENTS SECTION 1107 REFRIGERANT PIPING |
122 | SECTION 1108 FIELD TEST [F] SECTION 1109 PERIODIC TESTING |
124 | CHAPTER 12 HYDRONIC PIPING SECTION 1201 GENERAL SECTION 1202 MATERIAL TABLE 1202.4 HYDRONIC PIPE TABLE 1202.4—continued HYDRONIC PIPE TABLE 1202.5 HYDRONIC PIPE FITTINGS |
125 | SECTION 1203 JOINTS AND CONNECTIONS |
127 | SECTION 1204 PIPE INSULATION SECTION 1205 VALVES SECTION 1206 PIPING INSTALLATION |
128 | SECTION 1207 TRANSFER FLUID SECTION 1208 TESTS SECTION 1209 EMBEDDED PIPING |
130 | CHAPTER 13 FUEL OIL PIPING AND STORAGE SECTION 1301 GENERAL SECTION 1302 MATERIAL TABLE 1302.3 FUEL OIL PIPING SECTION 1303 JOINTS AND CONNECTIONS |
131 | SECTION 1304 PIPING SUPPORT SECTION 1305 FUEL OIL SYSTEM INSTALLATION |
132 | SECTION 1306 OIL GAUGING SECTION 1307 FUEL OIL VALVES SECTION 1308 TESTING |
134 | CHAPTER 14 SOLAR SYSTEMS SECTION 1401 GENERAL SECTION 1402 INSTALLATION |
135 | SECTION 1403 HEAT TRANSFER FLUIDS SECTION 1404 MATERIALS |
136 | CHAPTER 15 REFERENCED STANDARDS ACCA AHRI AMCA ANSI ASHRAE |
137 | ASME ASSE ASTM |
139 | AWS AWWA CSA |
140 | DOL FS ICC |
141 | IIAR MSS NAIMA NFPA |
142 | SMACNA UL |
144 | APPENDIX A CHIMNEY CONNECTOR PASS-THROUGHS FIGURE A-1 CHIMNEY CONNECTOR SYSTEMS |
145 | FIGURE A-1—continued CHIMNEY CONNECTOR SYSTEMS |
146 | APPENDIX B RECOMMENDED PERMIT FEE SCHEDULE B101 MECHANICAL WORK, OTHER THAN GAS PIPING SYSTEMS B102 FEE FOR REINSPECTION B103 TEMPORARY OPERATION INSPECTION FEE B104 SELF-CONTAINED UNITS LESS THAN 2 TONS |
148 | INDEX |
154 | EDITORIAL CHANGES |
156 | ICC MEMBERSHIP INFORMATION |
157 | ICC-ES ICC EVALUATION SERVICES PMG PROGRAM |
158 | COMMITTED TO BUILDING A GREEN AND SUSTAINABLE WORLD |
159 | VALUABLE GUIDES TO CHANGES IN THE 2012 I-CODES® |