Shopping Cart

No products in the cart.

IEC 63132-1:2020

$50.05

Guidance for installation procedures and tolerances of hydroelectric machines – Part 1: General aspects

Published By Publication Date Number of Pages
IEC 2020-04-20 58
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

IEC 63132-1:2020 The purpose of this part of IEC 63132 is to establish, in a general way, suitable procedures and tolerances for the installation of hydroelectric turbines and generators. This document presents a typical assembly. There are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse and delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences.
It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it.
Installations for refurbishment projects or for small hydro projects are not in the scope of this document. An agreement between all parties is necessary.
This document excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation.
The tolerances in this document have been established upon best practices and experience, although it is recognized that other standards specify different tolerances.
Wherever this document specifies that documents, drawings or information is supplied by a manufacturer (or manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.

IEC 63132-1:2020
$50.05