Shopping Cart

No products in the cart.

IEEE 1035 1989

$23.29

IEEE Recommended Practice: Test Procedure for Utility-Interconnected Static Power Converters

Published By Publication Date Number of Pages
IEEE 1989 28
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

New IEEE Standard – Inactive – Withdrawn. A test procedure that applies to single- and three-phase units rated from 1 kW to 500 kW and may also be applied in principle to larger units is given. The objective is the measurement of electrical parameters at the ac terminals of the power converter. The procedure may serve as a basis for factory or acceptance testing. It focuses on equipment that lends itself to mass production and is readily interconnected to an electric utility, rather than on equipment subject to site-specific design and testing. Test results may be used in evaluating or comparing different types of static power converters. Only equipment with the primary function of delivering electric energy to circuits interconnected with the electric utility is covered by this procedure.

PDF Catalog

PDF Pages PDF Title
9 Scope and References
1.1 Scope
1.2 References
Terms and Definitions
Static Power Converter (SPC)
2.2 Islanding
2.3 Utility Interconnection Point
2.4 Total Harmonic Distortion (THD)
2.5 Total Distortion (TD)
Testing Overview
10 Test Procedures-Power Factor and Harmonics Measurements
4.1 General
12 4.1.1 Total Harmonic Distortion (THD) versus Total Distortion (TD)
4.1.2 Power Factor
13 4.2 Test Equipment
14 4.3 Test Requirements and Setup
4.3.1 Total Harmonic Distortion (THD)
4.3.2 Power Factor
4.4 Circuit Descriptions and Block Diagrams
15 Sample Current Harmonic Distortion Data Form Using Percent Amplitudes
16 4.5 Test Procedures
Sample Harmonics Spectrum Using Decibel (dB) Amplitudes
17 5.1 General
Block Diagram for Utility Voltagemequency Tests
18 5.3 Test EquipmentSystem and Subsystem Tests
5.4 Circuit Descriptions and Block Diagrams
5.5 Test Procedures
Instrumentation for Utility VoltageD™requency Tests
19 Test Procedures-Time for SPC Disconnect
6.1 General
20 6.2 Test Equipment
6.3 Test Requirements
6.4 Circuit Descriptions and Block Diagrams
Block Diagram for Utility Voltage firip and Threshold Tests
21 Instrument Connections for Voltage Trip and Threshold Tests
Block Diagram for Multiple SPC Islanding Tests
22 6.5 Test ProceduresCPC Time to TripBhutdown
Instrument Connections for Multiple SPC Islanding Tests
23 Sample Chart Recording for a Utility Disconnect Test
24 7 Test Procedureoonducted and Radiated EM1 Detection
7.1 General
Oscillograph Recording for a Multiple SPC Islanding Test
25 7.2 Test Equipment
7.3 Test Requirements
Circuit Descriptions and Block Diagrams
7.5 Test Procedures
26 8 Bibliography
28 Appendix Total Harmonic Distortion (THD) and Total Distortion (TD) Measurements
IEEE 1035 1989
$23.29