IEEE 1035 1989
$23.29
IEEE Recommended Practice: Test Procedure for Utility-Interconnected Static Power Converters
Published By | Publication Date | Number of Pages |
IEEE | 1989 | 28 |
New IEEE Standard – Inactive – Withdrawn. A test procedure that applies to single- and three-phase units rated from 1 kW to 500 kW and may also be applied in principle to larger units is given. The objective is the measurement of electrical parameters at the ac terminals of the power converter. The procedure may serve as a basis for factory or acceptance testing. It focuses on equipment that lends itself to mass production and is readily interconnected to an electric utility, rather than on equipment subject to site-specific design and testing. Test results may be used in evaluating or comparing different types of static power converters. Only equipment with the primary function of delivering electric energy to circuits interconnected with the electric utility is covered by this procedure.
PDF Catalog
PDF Pages | PDF Title |
---|---|
9 | Scope and References 1.1 Scope 1.2 References Terms and Definitions Static Power Converter (SPC) 2.2 Islanding 2.3 Utility Interconnection Point 2.4 Total Harmonic Distortion (THD) 2.5 Total Distortion (TD) Testing Overview |
10 | Test Procedures-Power Factor and Harmonics Measurements 4.1 General |
12 | 4.1.1 Total Harmonic Distortion (THD) versus Total Distortion (TD) 4.1.2 Power Factor |
13 | 4.2 Test Equipment |
14 | 4.3 Test Requirements and Setup 4.3.1 Total Harmonic Distortion (THD) 4.3.2 Power Factor 4.4 Circuit Descriptions and Block Diagrams |
15 | Sample Current Harmonic Distortion Data Form Using Percent Amplitudes |
16 | 4.5 Test Procedures Sample Harmonics Spectrum Using Decibel (dB) Amplitudes |
17 | 5.1 General Block Diagram for Utility Voltagemequency Tests |
18 | 5.3 Test EquipmentSystem and Subsystem Tests 5.4 Circuit Descriptions and Block Diagrams 5.5 Test Procedures Instrumentation for Utility VoltageD™requency Tests |
19 | Test Procedures-Time for SPC Disconnect 6.1 General |
20 | 6.2 Test Equipment 6.3 Test Requirements 6.4 Circuit Descriptions and Block Diagrams Block Diagram for Utility Voltage ï¬rip and Threshold Tests |
21 | Instrument Connections for Voltage Trip and Threshold Tests Block Diagram for Multiple SPC Islanding Tests |
22 | 6.5 Test ProceduresCPC Time to TripBhutdown Instrument Connections for Multiple SPC Islanding Tests |
23 | Sample Chart Recording for a Utility Disconnect Test |
24 | 7 Test Procedureoonducted and Radiated EM1 Detection 7.1 General Oscillograph Recording for a Multiple SPC Islanding Test |
25 | 7.2 Test Equipment 7.3 Test Requirements Circuit Descriptions and Block Diagrams 7.5 Test Procedures |
26 | 8 Bibliography |
28 | Appendix Total Harmonic Distortion (THD) and Total Distortion (TD) Measurements |