IEEE 1069 1991
$72.04
IEEE Recommended Practice for Precipitator and Baghouse Hopper Heating Systems
Published By | Publication Date | Number of Pages |
IEEE | 1991 | 30 |
New IEEE Standard – Inactive – Withdrawn. Withdrawn Standard. Withdrawn Date: Feb 06, 2006. Recommendations on hopper heating system performance and equipment requirements necessary to provide an economical and effective hopper heating system are presented. System characteristics are described, and heat transfer analysis is covered. Heating module design considerations are presented. Control, monitoring, and alarm systems are discussed. Insulation, installation, operation, and maintenance are addressed.
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | Foreword Participants |
6 | CONTENTS |
8 | 1. Scope 2. Purpose 3. System Characteristics |
9 | 3.1 Fuel, Flue Gas, and Fly Ash |
10 | 3.2 Hopper Temperature Requirements 3.3 Flue Gas Temperature Excursions 3.4 Hopper Design |
11 | 3.5 Insulation 3.6 Long-Term Performance 4. Heat Transfer Analysis 4.1 Equipment Operating Conditions 4.2 Physical Properties |
12 | 4.3 Start-Up Dynamics |
13 | 4.4 Normal Operating Heating Loads |
14 | 4.5 Low-Load or Upset Conditions 4.6 Hopper Wall Temperature Profiles |
15 | 4.7 Special Design Considerations 5. Heating Module Design Considerations |
16 | 5.1 Vibration/Impact Loading Exposure 5.2 Maximum Temperature Exposure 5.3 Power Supply Voltage 5.4 Moisture/Humidity Resistance 5.5 Hopper Walls |
17 | 5.6 Fly Ash Levels 5.7 Handling and Installation 6. Control, Monitoring, and Alarm Systems 6.1 Power Distribution |
19 | 6.2 Temperature Controllers |
20 | 6.3 Monitoring and Alarm Systems |
21 | 7. Insulation 7.1 Insulating Material Considerations 7.2 Insulation System Design |
22 | 7.3 Installation Factors 8. Installation Considerations 8.1 Field Environment 8.2 Pre-Installation Review 8.3 Locating Mounting Equipment |
23 | 8.4 Heating Module and Blanket Heater Installation 8.5 Lead Wire Routing 8.6 Junction Box and Temperature Sensor Installation 8.7 Heating Module Checkout 8.8 Insulation Installation |
24 | 8.9 Final Checkout and Energization 9. Operation and Maintenance of Precipitator/Baghouse Hopper Heating Systems 9.1 Initial Pre-Operational Checkout |
25 | 9.2 Initial Energization 9.3 Normal Operations 9.4 Periodic Maintenance |
26 | 9.5 Troubleshooting |
27 | Annex A Specification Guideline for Precipitator and Baghouse Hopper Heating Systems |