IEEE Guide for Development of Specifications for Turnkey Substation Projects
Published By | Publication Date | Number of Pages |
IEEE | 2019 | 47 |
Revision Standard – Active. Systematic methodology, guidelines and practices for developing turnkey substation specifications are provided in this guide. Guidance on engineering, procurement, construction, testing and commissioning, quality assurance/quality control and training is provided.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 1267™-2019 Front cover |
2 | Title page |
4 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
7 | Participants |
9 | Introduction |
10 | Contents |
11 | 1. Overview 1.1 Scope 1.2 Purpose 2. Definitions, abbreviations, and acronyms 2.1 Definitions |
12 | 2.2 Abbreviations and acronyms 3. General 3.1 Overall discussion and requirements of a substation turnkey specification |
13 | 3.2 Contractor qualification and certification 3.3 Importance of detailed scope |
14 | 3.4 Suggested format of turnkey specification package |
19 | 4. Engineering 4.1 General description 4.2 Design standards 4.3 Design requirements |
26 | 4.4 Documentation 5. Procurement 5.1 Materials furnished by Others 5.2 Equipment specifications 5.3 Other considerations |
27 | 6. Construction 6.1 Specific construction specifications |
28 | 6.2 Scheduling 7. Testing and commissioning 7.1 General 7.2 Scope |
29 | 7.3 Requirements 7.4 Documentation 8. Quality assurance/quality control |
30 | 9. Training |
31 | Annex A (informative) Recommended equipment requirements A.1 Land use and environmental considerations |
32 | A.2 Aesthetic and environmental impact considerations |
33 | A.3 Permits and ordinances |
34 | A.4 Equipment |
43 | Annex B (informative) Bibliography |
47 | Back cover |