IEEE 1333 1995
$58.50
IEEE Guide for Installation of Cable Using the Guided Boring Method
Published By | Publication Date | Number of Pages |
IEEE | 1995 | 25 |
New IEEE Standard – Inactive – Withdrawn. Withdrawn Standard. Withdrawn Date: Feb 06, 2006. The method and equipment involved in proper and economical installation of insulated conductors and/or conduits using the guided boring method are covered. The method addresses installations of insulated cable, cable preinstalled in conduit (CIC), and conduit alone.
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | Introduction |
6 | CONTENTS |
8 | 1. Overview 2. References |
9 | 3. General description 3.1 Cable 3.2 Cable preinstalled in conduit (CIC) |
10 | 3.3 Plastic conduit 3.4 Metal conduit |
11 | 4. Equipment description 4.1 Boring unit (drill frame) 4.2 Field power unit (supply unit) 4.3 Drill (boring) head and locator |
12 | 4.4 Required safety equipment |
13 | 4.5 Supplemental equipment |
14 | 5. Preliminary inspection 5.1 Observation of field maps and circuit diagrams 5.2 Field survey |
15 | 5.3 Surface marking of substructures 5.4 Material and equipment preparation |
16 | 5.5 Job conditions |
18 | 6. Precautions 6.1 General safety precautions 6.2 Guarding and protecting work area |
19 | 6.3 Testing enclosure atmosphere 6.4 Shoring |
20 | 7. Drilling the run 7.1 Planning 7.2 Start of bore 7.3 Obstructions 7.4 Depth and spacing requirements 7.5 Pits 7.6 Drilling fluid control |
21 | 8. Cable preparation 8.1 Reel and reel trailers 8.2 Cable 8.3 Attaching cable to drill string |
22 | 8.4 Reamers |
23 | 9. Installation 9.1 Cable/conduit pulling |
24 | 9.2 Completing the installation |
25 | 10. Post-installation activities 10.1 Cleanup 10.2 Record as-built conditions |