IEEE 15289-2017
$59.58
ISO/IEC/IEEE International Standard – Systems and software engineering — Content of life-cycle information items (documentation)
Published By | Publication Date | Number of Pages |
IEEE | 2017 | 97 |
Revision Standard – Superseded. The purpose and content of all identified systems and software life cycle and service management information items (documentation) are specified in this document. The information item contents are defined according to generic document types (description, plan, policy, procedure, report, request, and specification) and the specific purpose of the document. This document provides a mapping of ISO/IEC/IEEE 15288:2015, ISO/IEC 12207:2008 (IEEE Std 12207‐2008), ISO/IEC 20000‐1:2011 (IEEE Std 20000‐1:2013), and ISO/IEC 20000‐2 (IEEE Std 20000‐2:2013) clauses with a set of information items. This document identifies records and information items based on analysis of references in ISO/IEC/IEEE 15288:2015, ISO/IEC 12207:2008 (IEEE Std 12207‐2008), ISO/IEC 20000‐1:2011 (IEEE Std 20000‐1:2013) and ISO/IEC 20000‐2:2012 (IEEE 20000‐2:2013), which in some cases provide partial or complete outlines for the content of specific documents. Information items may be combined or subdivided as needed for project or organizational purposes.
PDF Catalog
PDF Pages | PDF Title |
---|---|
6 | Foreword |
7 | Introduction |
9 | 1 Scope |
11 | 2 Normative references 3 Terms, definitions, and abbreviated terms 3.1 Terms and definitions |
14 | 3.2 Abbreviated terms 4 Applicability 4.1 Purpose 4.2 Intended users of this document |
15 | 4.3 Applicability to work efforts 4.4 Applicability to information item audiences 5 Conformance 5.1 Definition of conformance |
16 | 5.2 Conformance situations |
17 | 5.3 Type of conformance 6 Life-cycle data and information items 6.1 Life-cycle data characteristics 6.2 Records compared to information items (documents) |
18 | 6.3 Management of life-cycle data (records) 6.4 Management of information items (documents) 6.4.1 Developing the documentation plan |
19 | 6.4.2 Managing and controlling information items 7 Generic types of information items 7.1 General 7.2 Description – generic content |
20 | 7.3 Plan – generic content |
22 | 7.4 Policy – generic content |
23 | 7.5 Procedure – generic content |
24 | 7.6 Report – generic content |
26 | 7.7 Request – generic content 7.8 Specification – generic content |
27 | 8 Mapping of information items to the life cycle and service management processes |
28 | 8.1 Mapping of information items to the system life cycle |
33 | 8.2 Mapping of information items to the software life cycle |
40 | 8.3 Mapping of information items to the service management processes |
45 | 9 Records 9.1 Record – generic content |
46 | 9.2 Specific record contents |
49 | 10 Specific information item (document) contents 10.1 General 10.2 Acceptance plan 10.3 Acceptance report |
50 | 10.4 Acquisition plan 10.5 Asset management plan 10.6 Audit acknowledgement report |
51 | 10.7 Audit plan 10.8 Audit procedure 10.9 Audit report 10.10 Capacity plan |
52 | 10.11 Capacity management procedure 10.12 Change request 10.13 Communication procedure 10.14 Complaint procedure |
53 | 10.15 Concept of operations 10.16 Configuration management plan and policy |
54 | 10.17 Configuration management procedure |
55 | 10.18 Configuration status report 10.19 Contract |
56 | 10.20 Customer satisfaction survey 10.21 Database design description |
57 | 10.22 Development plan 10.23 Disposal plan |
58 | 10.24 Documentation plan 10.25 Documentation procedure 10.26 Domain engineering plan 10.27 Evaluation report |
59 | 10.28 Implementation procedure 10.29 Improvement plan 10.30 Improvement procedure |
60 | 10.31 Incident management procedure 10.32 Incident report |
61 | 10.33 Information management plan 10.34 Information management procedure 10.35 Information security plan |
62 | 10.36 Information security policy 10.37 Information security procedure |
63 | 10.38 Installation plan 10.39 Installation report 10.40 Integration and test report 10.41 Integration plan |
64 | 10.42 Interface description 10.43 Life-cycle policy and procedure 10.44 Maintenance plan |
65 | 10.45 Maintenance procedure 10.46 Measurement plan 10.47 Measurement procedure 10.48 Monitoring and control report |
66 | 10.49 Operational test procedure 10.50 Problem management procedure 10.51 Problem report |
67 | 10.52 Process assessment procedure 10.53 Process improvement report 10.54 Product need assessment |
68 | 10.55 Progress report 10.56 Project management plan |
69 | 10.57 Proposal 10.58 Qualification test procedure |
70 | 10.59 Qualification test report 10.60 Quality management plan 10.61 Quality management policy and procedure |
71 | 10.62 Release plan (and policy) |
72 | 10.63 Request for proposal (RFP) 10.64 Resource request 10.65 Reuse plan |
73 | 10.66 Review minutes 10.67 Risk action request 10.68 Risk management policy and plan 10.69 Service catalog 10.70 Service continuity and availability plan |
74 | 10.71 Service level agreement (SLA) |
75 | 10.72 Service management plan (and policy) 10.73 Service plan |
76 | 10.74 Service report 10.75 Software architecture description |
77 | 10.76 Software design description |
78 | 10.77 Software requirements specification |
79 | 10.78 Software unit description 10.79 Software unit test procedure 10.80 Software unit test report 10.81 Supplier management procedure |
80 | 10.82 Supplier selection procedure 10.83 System architecture description |
81 | 10.84 System element description 10.85 System requirements specification |
82 | 10.86 Training documentation 10.87 Training plan 10.88 User documentation |
83 | 10.89 User notification 10.90 Validation plan 10.91 Validation procedure (validation test specification) 10.92 Validation report 10.93 Verification plan |
85 | 10.94 Verification procedure 10.95 Verification report |
86 | Annex A |
88 | Annex B |
92 | Bibliography |