IEEE 1547.2 2009
$58.50
IEEE Application Guide for IEEE Std 1547(TM), IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems
Published By | Publication Date | Number of Pages |
IEEE | 2009 | 219 |
New IEEE Standard – Active. Technical background and application details to support understanding of IEEE Std 1547-2003 are provided. The guide facilitates the use of IEEE Std 1547-2003 by characterizing various forms of distributed resource (DR) technologies and their associated interconnection issues. It provides background and rationale of the technical requirements of IEEE Std 1547-2003. It also provides tips, techniques, and rules of thumb, and it addresses topics related to DR project implementation to enhance the user’s understanding of how IEEE Std 1547-2003 may relate to those topics. This guide is intended for use by engineers, engineering consultants, and knowledgeable individuals in the field of DR. The IEEE 1547 series of standards is cited in the Federal Energy Policy Act of 2005, and this guide is one document in the IEEE 1547 series.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 1547.2-2008 Front cover |
3 | Title page |
6 | Introduction |
7 | Notice to users Laws and regulations Copyrights Updating of IEEE documents Errata Interpretations |
8 | Patents Participants |
11 | Contents |
13 | Important notice 1. Overview 1.1 Scope 1.2 Purpose |
14 | 1.3 Intended audience 1.4 Document structure 1.5 Limitations |
15 | 1.6 Functional descriptions 2. Normative references 3. Definitions, acronyms, and abbreviations 3.1 Definitions, acronyms, and abbreviations |
16 | 3.2 Acronyms and abbreviations |
17 | 4. Interconnection systems 4.1 Interconnection system description |
18 | 4.2 Interconnection system functions |
19 | 5. Distributed resources 5.1 Prime movers |
20 | 5.2 Power conversion technologies |
21 | 6. EPSs (area and local) |
22 | 7. Potential effects on area and local EPS |
24 | 8. Application guidance for IEEE 1547 technical specifications and requirements |
25 | 8.1 General requirements (IEEE Std 1547-2003 4.1) |
54 | 8.2 Response to area EPS abnormal conditions (IEEE Std 1547-2003 4.2) |
78 | 8.3 Power quality (IEEE Std 1547-2003 4.3) |
86 | 8.4 Islanding (IEEE Std 1547-2003 4.4) |
92 | 9. Application guidance for interconnection test specifications and requirements 9.1 Type (design) tests (IEEE Std 1547-2003 5.1, IEEE Std 1547.1-2005 Clause 5) 9.2 Production tests (IEEE Std 1547-2003 5.2, IEEE Std 1547.1-2005 Clause 6) |
93 | 9.3 Interconnection installation evaluation (IEEE Std 1547-2003 5.3) 9.4 Commissioning tests (IEEE Std 1547-2003 5.4, IEEE Std 1547.1-2005 Clause 7) |
94 | 9.5 Periodic interconnection tests (IEEE Std 1547-2003 5.5, IEEE Std 1547.1-2005 Clause 8) 10. Interconnection process information |
96 | Annex A (informative)Interconnection system equipment A.1 Interconnection system functions |
105 | A.2 Distributed resource applications |
106 | A.3 Example interconnection and EPSs |
124 | Annex B (informative)Prime movers B.1 Types of prime movers |
127 | B.2 Distributed resource equipment and flicker |
131 | Annex C (informative)Power conversion technologies C.1 Synchronous generators |
136 | C.2 Induction generators |
139 | C.3 Double-fed asynchronous generators |
140 | C.4 Inverters and static power converters |
156 | Annex D (informative)Design, construction, configuration, operation, and concerns of area and local EPSs D.1 Area EPS |
176 | D.2 Local EPS |
184 | Annex E (informative)Area and local EPS impacts |
189 | Annex F (informative)System impact studies F.1 Introduction F.2 Simple impact studies |
190 | F.3 Detailed impact studies |
196 | F.4 Using the results of impact studies |
198 | Annex G (informative)Electrical distribution system disturbances G.1 Definition of voltage disturbance G.2 Causes of momentary disturbances |
199 | G.3 Sensitive loads |
202 | Annex H (informative)Interconnection process information H.1 Flowchart |
204 | H.2 Expedited projects H.3 Simplified projects H.4 Full projects |
205 | H.5 Tariff issues (revenue metering and net metering) |
206 | H.6 Key information in application forms H.7 Checklist |
208 | H.8 Items to be discussed during the project |
210 | Annex I (informative)Glossary |
215 | Annex J (informative)Bibliography |