IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations
Published By | Publication Date | Number of Pages |
IEEE | 1992 | 27 |
Revision Standard – Inactive – Superseded. Superseded by 308-2001. Class 1E portions of ac and dc power systems and instrumentation and control power systems in single-unit and multiunit nuclear power generating stations are covered. Not included are the preferred power supply; unit generator(s) and their buses; generator breaker; step-up, auxiliary, and start-up transformers; connections to the station switchyard; switchyard; transmission lines; and the transmission network. The intent is to provide criteria for the determination of Class 1E power system design features, criteria for sharing Class 1E power systems in multiunit stations, and the requirements for their testing and surveillance. You will receive an email from Customer Service with the URL needed to access this publication online.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Title Page |
3 | Introduction |
4 | Participants |
6 | CONTENTS |
7 | 1. Scope |
9 | 2. Purpose |
10 | 3. References |
11 | 4. Definitions |
13 | 5. Principal Design Criteria 5.1 General 5.2 Relationship Between the Safety System and Class 1E Power System |
16 | 5.3 Design Basis Event Effects 5.4 Design Basis |
17 | 5.5 Power Quality 5.6 Location of Indicators and Control 5.7 Identification 5.8 Independence 5.9 Equipment Qualification 5.10 Single-Failure Criterion |
18 | 5.11 Connection of Non-Class 1E Circuits 5.12 Control of Access 5.13 Circuits That Penetrate Containment 5.14 Protection 6. Supplementary Design Criteria 6.1 Class 1E Power Systems |
19 | 6.2 Alternating Current Power Systems |
20 | 6.3 Direct Current Power Systems |
22 | 6.4 Instrumentation and Control Power Systems |
23 | 6.5 Execute Features 6.6 Sense and Command Features |
24 | 7. Surveillance and Test Requirements 7.1 Surveillance Methods 7.2 Preoperational Equipment Tests and Inspections |
26 | 7.3 Preoperational System Test 7.4 Periodic Tests 8. Multiunit Station Considerations 8.1 General 8.2 Criteria |
27 | 8.3 Standby Power Supply Capacity 8.4 Battery Supply |