Shopping Cart

No products in the cart.

IEEE C37.016 2018:2019 Edition

$42.25

IEEE Standard for AC High Voltage Circuit Switchers Rated 15.5 kV through 245 kV

Published By Publication Date Number of Pages
IEEE 2019 62
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Revision Standard – Active. This standard is applicable to ac circuit switchers designed for outdoor installation and for rated power frequencies of 50 Hz and 60 Hz and rated maximum voltages of 15.5 kV through 245 kV. It is applicable only to three-pole circuit switchers for use in three-phase systems. This standard is also applicable to the operating devices of circuit switchers and to their auxiliary equipment. Included in this document are the normal and special service conditions under which the ratings are based and requirements for design and construction, which include those for interrupting media, stored energy systems, operating characteristics, mechanical loading and operation capabilities, electrical insulation, and auxiliary devices. The rating structure establishes the basis for all assigned ratings, including continuous current, dielectric withstand voltages, primary-bus fault breaking current, transformer-limited fault breaking current, short-circuit making current, transient recovery voltages, and capacitor switching, plus associated capabilities such as mechanical endurance and operation under high- and low-temperature environmental extremes. Routine (production) tests are defined and requirements for their execution documented.

PDF Catalog

PDF Pages PDF Title
1 IEEE Std C37.016-2018 Front Cover
2 Untitled
Title page
4 Important Notices and Disclaimers Concerning IEEE Standards Documents
7 Participants
9 Introduction
10 Contents
12 1. Overview
1.1 Scope
2. Normative references
13 3. Definitions
14 4. Normal and special service conditions
4.1 Normal service conditions
4.2 Special service conditions
15 5. Ratings
5.1 General
5.2 Rated maximum voltage (Ur)
16 5.3 Rated insulation level
5.4 Rated power frequency (fr)
5.5 Rated continuous current (Ir)
17 5.6 Rated short-time withstand current (Ik)
5.7 Rated peak withstand current (Ip)
5.8 Rated duration of short-circuit (tk)
5.9 Rated control voltage of operating devices and of auxiliary and control circuits (Ua)
5.10 Rated control frequency of operating devices and auxiliary circuits
5.11 Rated pressures of compressed gas supply for insulation, operation, and/or interruption
5.12 Rated primary-bus fault breaking current (Ipbf)
18 5.12.1 AC component of the rated primary-bus fault breaking current
5.12.2 DC component of the rated primary-bus fault breaking current
20 5.13 TRV related to the rated primary-bus fault breaking current
5.13.1 General
21 5.13.2 Representation of TRV
23 5.13.3 Standard values of TRV
24 5.13.4 TRVs for currents below rated primary-bus fault breaking current
25 5.14 Rated transformer-limited fault breaking current (Itf)
5.15 Rated TRV related to the transformer-limited fault breaking current
5.15.1 General
5.15.2 Representation of TRV
26 5.15.3 Preferred values of TRV for rated transformer-limited fault breaking current
27 5.15.4 TRV for transformer-limited fault currents less than the rated value
5.16 Rated short-circuit making current (Im)
5.17 Rated operating sequence
5.18 Rated capacitive switching currents
5.18.1 General
29 5.18.2 Rated line-charging breaking current (LC)
5.18.3 Rated cable-charging breaking current (CC)
5.18.4 Rated single capacitor bank breaking current (BC)
5.18.5 Rated back-to-back capacitor bank transient peak inrush making current (Ibb)
5.19 Rated time quantities
5.19.1 General
31 5.19.2 Rated interrupting time
5.20 Mechanical operations endurance
5.21 Rated static terminal load
33 5.22 Rated ice-breaking ability
6. Design and construction
6.1 Requirements for liquids in circuit switchers
6.2 Requirements for gases in circuit switchers
6.3 Grounding of circuit switchers
34 6.4 Auxiliary and control equipment and circuits
6.5 Dependent power operation
6.6 Stored energy closing
6.6.1 General
6.6.2 Energy storage in gas receivers or hydraulic accumulators
6.6.3 Energy storage in springs (or weights)
35 6.7 Manually operated releases
6.8 Operation of releases
6.9 Nameplates
37 6.10 Locking devices
6.11 Position indication
6.12 Degrees of protection provided by enclosures
6.13 Creepage distances for outdoor insulators
6.14 Gas and vacuum tightness
6.15 Tightness for liquid systems
6.16 Flammability
6.17 Electromagnetic compatibility (EMC)
38 6.18 X-ray emission
6.19 Pressurized components
6.20 Pressurized systems
6.21 Low- and high-pressure interlocking and monitoring devices
6.22 Disconnect operation
6.22.1 Operating requirements for coordinated disconnect operation
6.22.2 Operating requirements for independent disconnect operation
39 7. Design (type) tests
7.1 General
7.1.1 Introduction
7.1.2 Information for identification of specimens
7.1.3 Information to be included in design test (type test) reports
7.2 Dielectric tests
7.2.1 General
7.2.2 Ambient air conditions during tests
7.2.3 Wet test procedure
40 7.2.4 Arrangement of the equipment
7.2.5 Criteria to pass the test
7.2.6 Application of test voltage and test conditions
7.2.6.1 General
7.2.6.2 General case
42 7.2.6.3 Special case (when the test voltage across the open circuit switcher is higher than the phase-to-ground withstand voltage)
7.2.7 Tests of circuit switchers
7.2.7.1 General
7.2.7.2 Power-frequency voltage tests
7.2.7.3 Lightning impulse voltage test
7.2.7.4 Chopped wave (optional)
43 7.2.8 Artificial pollution tests
7.2.9 Partial discharge tests
7.2.10 Dielectric tests on auxiliary and control circuits
7.2.11 Voltage test as a condition check
7.3 Radio interference voltage (R.I.V.) tests
7.4 Resistance measurement
7.5 Continuous current tests
7.6 Short-time withstand current and peak withstand current tests
44 7.7 Verification of the protection provided by enclosures
7.8 Tightness tests
7.9 Electromagnetic compatibility tests
7.10 X-radiation procedure for vacuum interrupters
7.11 Mechanical and environmental tests
7.11.1 General
7.11.2 Mechanical endurance test object and conditions
7.11.3 Circuit switcher operational characteristics
45 7.11.4 Mechanical endurance test at ambient air temperature
7.11.4.1 Mechanical endurance CSM1, CSM2, and CSM3 test items and sequences
46 7.11.4.2 Mechanical endurance qualification criteria
7.11.4.3 Mechanical endurance test report requirements
7.11.5 Low and high temperature tests
7.11.5.1 Test object and conditions
7.11.5.2 Low temperature test data and sequence
49 7.11.5.3 High temperature test data and sequence
50 7.11.5.4 Low and high temperature qualification criteria
7.12 Ice-loading test
51 7.13 Static terminal load test
7.13.1 General
7.13.2 Tests
7.14 Short-circuit current making and breaking tests
7.14.1 General
52 7.14.2 Test conditions
7.14.2.1 Power factor
7.14.2.2 Frequency of test circuit
7.14.2.3 Demonstration of arcing time
53 7.14.2.4 Recovery voltage
7.14.2.5 Initial TRV test conditions
7.14.2.6 Control voltage
7.14.2.7 Operating conditions
7.14.2.8 Conditions during single-pole tests and unit tests
7.14.2.9 Grounding of the circuit switcher and test circuit
7.14.2.10 Reversal of test connections
7.14.3 Test methods
7.14.4 Test duties
7.14.4.1 General
54 7.14.4.2 Test duty TLF
7.14.4.3 Test duty PBF60
7.14.4.4 Test duty PBF100s
7.14.4.5 Test duty PBF100a
7.14.4.6 Single-phase tests
7.14.5 Short-circuit making current
7.14.5.1 General
55 7.14.5.2 Applied voltage before short-circuit making tests
7.14.5.3 Test procedure
57 7.14.6 Condition of circuit switcher tested
7.14.6.1 General
7.14.6.2 Circuit switcher operating characteristics prior to test initiation
7.14.6.3 Reconditioning of circuit switcher during testing
7.14.6.4 Circuit switcher operating characteristics after test
7.14.6.5 Condition of circuit switcher after test
58 7.15 Capacitor switching
7.15.1 Characteristics of the capacitive circuit to be switched
7.15.2 Characteristics of supply circuits
7.15.3 Test current
7.15.4 Preconditioning for Class C2
7.15.5 Test programs
7.15.6 Common criteria to pass the capacitance switching tests
7.16 Design tests on pressurized components
8. Production tests
8.1 General
59 8.2 Dielectric test on the main circuit
8.3 Inspection and testing of auxiliary and control circuits
8.3.1 Resistors, heaters, and coils check tests
8.3.2 Auxiliary and control circuit check tests
8.3.3 Dielectric test on auxiliary and control circuits
8.4 Measurement of resistance of main circuit
60 8.5 Tightness test
8.6 Design and visual checks
8.7 Mechanical operation tests
8.8 Timing tests
8.9 Gas system pressure tests
8.10 Vacuum integrity tests
61 Annex A (informative) Bibliography
62 Back Cover
IEEE C37.016 2018
$42.25