Shopping Cart

No products in the cart.

IEEE C37.122.4 2016:2017 Edition

$33.04

IEEE Guide for Application and User Guide for Gas-Insulated Transmission Lines, Rated 72.5 kV and Above

Published By Publication Date Number of Pages
IEEE 2017 49
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

New IEEE Standard – Active. Guidance for the planning, permitting, design, equipment specification, installation, commissioning, operation, and maintenance of gas-insulated transmission lines is provided in this project. Only technical aspects are addressed in this guide. Commercial and legal issues associated with gas-insulated transmission lines are not considered. This guide applies to ac transmission lines rated for maximum operating voltage of 72.5 kV and higher.

PDF Catalog

PDF Pages PDF Title
1 IEEE Std C37.122.4™-2016 Front cover
2 Title page
4 Important Notices and Disclaimers Concerning IEEE Standards Documents
7 Participants
8 Introduction
9 Contents
11 1. Overview
1.1 Scope
1.2 Purpose
2. Normative references
12 3. Definitions
13 4. Technical details of GIL
4.1 General information
4.2 Description
4.3 Typical installations
14 4.4 GIL application information
15 4.5 Influence of GIL on the transmission network
4.6 Temperature design criteria
4.7 Seismic aspects
16 4.8 Terminations
4.9 Installation criteria
17 4.10 Testing criteria
4.11 Environmental aspects
18 4.12 Technical data to be given in the request for proposal
19 5. Detailed project implementation and service
5.1 Construction aspects
5.2 Transportation and storage
20 5.3 GIL installation (on-site welded assembly)
21 5.4 Testing and commissioning
23 5.5 Secondary equipment
24 5.6 GIL grounding
25 5.7 Seismic requirements
5.8 Repair techniques
6. Gas handling of gas mixtures
6.1 General
26 6.2 Pure SF6 and N2/SF6 gas mixture
6.3 Gas handling equipment
6.4 Filling with SF6 or SF6/N2 gas mixture
6.5 Removal of SF6 or SF6/N2 gas mixture
27 7. Maintenance and inspections
8. Training
9. Decommissioning
9.1 General
9.2 Removal of SF6 or SF6/N2 gas mixture
9.3 Dismantling of the GIL
28 Annex A (informative) Typical installations
A.1 Installations in a tunnel
32 A.2 Above ground
35 A.3 Direct buried
37 Annex B (informative) Comparison of GIL, OHL, and XLPE cable
B.1 General information
38 B.2 OHL, cable, and GIL technical points
39 Annex C (informative) Proposal fill-in data table
41 Annex D (informative) Execution of GIL project planning and engineering process
D.1 Flowchart
42 D.2 Initiation of a project
D.3 Preliminary system studies/needs assessment
D.4 Routing
D.5 Pre-proposal stage
D.6 Further studies
43 D.7 Approval of the right-of-way
D.8 Preparation of a request for quotation
44 D.9 Evaluation of quotation
D.10 Project implementation
46 Annex E (informative) Bibliography
49 Back cover
IEEE C37.122.4 2016
$33.04