IEEE C37.21-2005
$49.83
IEEE Standard for Control Switchboards
Published By | Publication Date | Number of Pages |
IEEE | 2005 | 34 |
Revision Standard – Superseded. This standard covers ratings, construction, and testing of dead-front control switchboards containing but not limited to devices such as switches, control devices, instrumentation, metering, monitoring, alarms, annunciators, protective and auxiliary relays, and regulating devices and accessories. It includes, but is not specifically limited to, switchboards for the control and protection of apparatus used for or associated with power generation, conversion, transmission, and distribution. Types of switchboards may include control, vertical, dead-front, enclosed, dual, or duplex switchboards. Other construction types include control desks, consoles, benchboards, dual or duplex benchboards, fixed rack, cabinet, and swing rack cabinets. It does not apply to industrial controls, communication equipment, switchboards for use on board ships, or Class 1E switchboards for use in nuclear generating stations.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std C37.21-2005 Front Cover |
3 | IEEE Standard for Control Switchboards |
4 | Abstract/Keywords |
6 | Introduction |
7 | Notice to users Errata Interpretations Patents |
8 | Participants |
10 | CONTENTS |
11 | 1.Overview 2. Normative references |
12 | 3. Definitions Type of switchboards |
14 | Common or related terms |
15 | 4. Service conditions 4.1 Usual service conditions 5. Ratings 5.1 Voltage and power frequency ratings |
16 | 5.2 Temperature limitations for air surrounding devices within an enclosedswitchboard 6. Tests 6.1 General 6.2 Design tests |
18 | 6.3 Production tests |
19 | 6.4 Field dielectric test |
20 | 7. Construction 7.1 General requirements |
25 | 7.2 Materials and finish |
26 | 7.3 Indoor switchboards 7.4 Outdoor switchboards |
27 | 8. General application guide 8.1 Unusual service conditions |
29 | 8.2 Nuclear power plant application |
30 | 9. Handling, storage, and installation guide 9.1 General 9.2 Handling |
31 | 9.3 Pre-operation check |
33 | Annex A (informative) Bibliography |