IEEE Standard Test Code for High-Voltage Air Switches

Published By Publication Date Number of Pages
IEEE 1995 38
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Revision Standard – Active. Design test requirements for all high-voltage enclosed indoor and outdoor and non-enclosed indoor and outdoor air switches rated above 1000 V are specified. This includes requirements for such switches as disconnecting, selector, horn-gap, grounding, interrupter, etc., for manual and power operation, except for distribution-enclosed single-pole air switches and distribution cutouts fitted with disconnecting blades.

PDF Catalog

PDF Pages PDF Title
1 Title Page
3 Introduction
4 Participants
7 CONTENTS
9 1. Overview
1.1 Scope
1.2 References
10 2. Definitions
11 3. Design tests
4. Dielectric withstand voltagte tests
4.1 Power-frequency withstand voltage tests
12 4.2 Lightning impulse dry withstand voltage tests
14 4.3 Power frequency and lightning impulse open gap withstand voltage test
15 4.4 Switching-impulse voltage tests of extra-high-voltage switches
18 5. Radio-influence and corona tests
5.1 Simultaneous tests
5.2 Radio-influence tests
19 5.3 Corona tests
21 6. Temperature rise test
6.1 General
6.2 Mounting
6.3 Switch connections
23 6.4 Method of temperature determination
6.5 Ambient temperature during test
6.6 Measurement of ambient temperature
24 6.7 Duration of temperature rise test
6.8 Criteria for acceptance
7. Switch performance tests
7.1 Conditions of test
7.2 Ambient temperature during test
25 7.3 Duration of switch performance test
7.4 Criteria for acceptance
8. Tests for peak withstand and short-time (symmetrical) withstand current ratings
8.1 Equipment
8.2 Mounting
8.3 Switch connections
26 8.4 Test durations
8.5 Measurement of current
8.6 Condition of switch after test
9. Interrupting tests
9.1 Load current interrupting tests
27 9.2 Excitation current interrupting tests
9.3 Capacitive current switching tests
29 9.4 Condition of switch after test
30 10. Ice tests
10.1 General
10.2 Study of ice formation
10.3 Test methods
31 10.4 Test conditions
32 10.5 Test procedure
33 10.6 Criteria for acceptance
11. Mechanical operations test
11.1 General
34 11.2 Test arrangement
11.3 Test procedure
35 11.4 Criteria for acceptance
36 Annex A—Background information
38 Annex B—Bibliography
IEEE C37.34 1995