IEEE C37.63 1997
$58.50
IEEE Standard Requirements for Overhead, Pad-Mounted, Dry-Vault and Submersible Automatic Line Sectionalizers for AC Systems
Published By | Publication Date | Number of Pages |
IEEE | 1997 | 37 |
Revision Standard – Inactive – Superseded. Required definitions (for cutout type sectionalizers), ratings, procedures for performing design tests and production tests, constructional requirements, and application considerations for overhead and pad-mounted, dry-vault, and submersible automatic line sectionalizers for ac systems are specified. Keywords: sectionalizers, cutout type, dry-vault sectionalizers, pad-mounted, submersible
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Title Page |
3 | Introduction Participants |
6 | CONTENTS |
9 | 1. Overview 1.1 Scope 2. References |
10 | 3. Definitions 4. Service conditions 4.1 Usual service conditions |
11 | 4.2 Unusual service conditions 5. Rating 5.1 Rating Information |
12 | 5.2 Rated maximum voltage 5.3 Rated frequency |
14 | 5.4 Rated continuous current |
16 | 5.5 Rated minimum actuating current 5.6 Rated symmetrical interrupting (load current switching) current (manual operation only) 5.7 Rated making current |
17 | 5.8 Rated momentary current 5.9 Rated 1 s current 5.10 Rated 10 s current 5.11 Rated dielectric withstand levels 5.12 Overload rating 5.13 Rated control voltage and ranges |
18 | 5.14 Rated cable charging interrupting current (where applicable) 6. Design tests |
19 | 6.1 General 6.2 Insulation (dielectric tests) |
20 | 6.3 Interrupting tests |
25 | 6.4 Standard operating duty tests |
26 | 6.5 Making and momentary current tests 6.6 Minimum actuating current tests 6.7 Partial discharge tests 6.8 Radio influence voltage (RIV) tests |
28 | 6.9 Short-Time current tests |
29 | 6.10 Surge current test—Series coil sectionalizers 6.11 Temperature rise test |
31 | 6.12 Mechanical operation test 6.13 Control elements surge withstand capability tests |
33 | 7. Production tests |
34 | 7.1 Counting and overcurrent trip calibration 7.2 Control, secondary wiring, and accessory device check tests 7.3 Dielectric withstand test—1 min dry power frequency 7.4 Mechanical operation tests 7.5 Leak test 8. Construction requirements 8.1 Tank construction |
35 | 8.2 Grounding provisions 8.3 Insulating medium quantity indicators (submersible sectionalizers) 8.4 Oil sampling provisions (submersible sectionalizers) 8.5 Manual operating provision 8.6 Position indicator |
36 | 8.7 Nameplate markings 8.8 Stored energy mechanism charge indicator 8.9 Separate mounting of control apparatus 8.10 Counters 8.11 Conductor terminal sizes 8.12 Vacuum interrupters |
37 | 9. Application considerations 9.1 Safety provisions |