IEEE C37.66-2021
$36.83
IEEE Standard Requirements for Capacitor Switches for AC Systems (1 kV to 38 kV)
Published By | Publication Date | Number of Pages |
IEEE | 2021 |
Revision Standard – Active. Required definitions, ratings, and procedures for performing design tests, production tests, and construction requirements for capacitor switches for ac systems from 1 kV to 38 kV are covered in this standard.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std C37.66™-2021 Front cover |
2 | Title page |
4 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
8 | Participants |
10 | Introduction |
11 | Contents |
13 | 1. Overview 1.1 Scope 1.2 Purpose 1.3 Word usage |
14 | 2. Normative references 3. Definitions |
15 | 4. Usual and unusual service conditions 4.1 Usual service conditions 4.2 Unusual service conditions |
16 | 5. Ratings and requirements 5.1 General 5.2 Rating information |
17 | 5.3 Rated maximum voltage (V) or (Ur) 5.4 Rated power frequency (fr) 5.5 Rated peak fault-making current 5.6 Rated symmetrical fault-making current |
20 | 5.7 Rated capacitive switching current (Ir) |
21 | 5.8 Rated peak withstand current (Ip) |
22 | 5.9 Rated short-time (symmetrical) withstand current and duration (Ik) 5.10 Rated transient peak inrush current 5.11 Transient inrush frequency 5.12 Rated lightning impulse withstand voltage 5.13 Rated power-frequency withstand voltage 5.14 Rated control voltages and ranges |
23 | 6. Design tests 6.1 General 6.2 Insulation (dielectric) tests |
24 | 6.3 Short-time current tests 6.4 Rated fault-making current tests |
25 | 6.5 Switching duty tests |
26 | 6.6 Condition of capacitor switch after short-time current tests, rated fault-making current tests, and switching duty tests (see 6.3, 6.4, and 6.5) 6.7 Temperature-rise tests |
27 | 6.8 Radio influence voltage (RIV) tests 6.9 Mechanical life tests |
28 | 6.10 Control wiring tests 7. Production tests 7.1 Dielectric withstand test; 1 min dry power-frequency |
29 | 7.2 Control, secondary wiring, and accessory devices check tests 7.3 Measurement of the resistance of the main circuit 7.4 Tightness tests 7.5 Design and visual checks 7.6 Mechanical operations tests 8. Construction requirements 8.1 Requirements for liquids in capacitor switches 8.2 Requirements for gases in capacitor switches |
30 | 8.3 Grounding provisions 8.4 Auxiliary and control equipment 8.5 Dependent power operation 8.6 Stored energy mechanism charge indicator 8.7 Independent manual operation 8.8 Operation of releases 8.9 Low- and high-pressure interlocking devices 8.10 Nameplate markings |
31 | 8.11 Interlocking devices 8.12 Position indicator 8.13 Degrees of protection by enclosures 8.14 Creepage distances for outdoor insulators |
32 | 8.15 Gas and vacuum tightness 8.16 Liquid tightness 8.17 Flammability 8.18 Electromagnetic compatibility (EMC) 8.19 X-ray emission |
33 | Annex A (informative) Fault-handling ratings for capacitor switches A.1 Introduction A.2 Quantitative distinction A.3 Time constant (τmL) and X/R ratio |
34 | A.4 Related, required capabilities |
35 | Annex B (informative) Consideration of inrush current in back-to-back capacitor switching B.1 Introduction B.2 General application guidelines |
36 | B.3 Inrush current and frequency formulas for switching capacitor banks |
37 | B.4 Example equations |
38 | B.5 Formula definitions |
39 | Annex C (informative) Bibliography |
40 | Back cover |