Shopping Cart

No products in the cart.

IEEE C50.13 2006

$37.38

IEEE Standard for Cylindrical-Rotor 50 Hz and 60 Hz Synchronous Generators Rated 10 MVA and Above

Published By Publication Date Number of Pages
IEEE 2006 60
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Revision Standard – Active. The requirements in this standard are applied to 50 Hz and 60 Hz, two-pole and four-pole, cylindrical-rotor synchronous generators driven by steam turbines and/or by combustion gas turbines. The drive may be direct or through a gearbox or other device that permits different speeds for the turbine and the generator. The generators covered by this standard are to have rated outputs of 10 MVA and above.

PDF Catalog

PDF Pages PDF Title
1 IEEE Std C50.13™-2005, IEEE Standard for Cylindrical-Rotor 50 Hz and 60 Hz Synchronous Generators Rated 10 MVA and Above
3 Title page
6 Introduction
7 Notice to users
Errata
Interpretations
Patents
8 Participants
10 CONTENTS
13 1. Scope
2. Normative references
14 3. Definitions
16 4. Operational requirements
4.1 Service conditions and steady-state duty
22 4.2 Transient event and emergency duty requirements
28 4.3 Service environment
29 5. Rating and performance characteristics
5.1 Output rating
30 5.2 Capabilities
31 5.3 Voltage and current ratings
5.4 Power factor and reactive power capability
33 5.5 Short-circuit ratio
5.6 Transient and subtransient reactances
34 5.7 Voltage wave shape
35 6. Insulation systems
6.1 Insulation systems defined
36 6.2 Classes of insulation systems
6.3 The use of different classes of insulation systems
37 7. Temperatures and temperature limits
7.1 Temperature limits
40 7.2 Methods of temperature determination
41 7.3 Locations of embedded temperature detectors
7.4 Location of coolant temperature detectors
8. Efficiency
8.1 Methods
8.2 Reference conditions
42 8.3 Types of losses
43 8.4 Test tolerance on losses
9. Tests
9.1 Categories and scope of tests
45 9.2 Test procedural requirements
47 9.3 Heat exchanger testing
9.4 Testing high-voltage terminal bushings
9.5 Overspeed testing
10. Marking
10.1 Nameplate
48 10.2 Information about other output capabilities
10.3 Other information about the unit
10.4 Other marking
49 Annex A (informative) Bibliography
51 Annex B (informative) Guide for the basic specification of generators
B.1 Introduction
B.2 Sources of requirements
57 B.3 Expanded discussions of selected requirements
59 Annex C (normative) TIF weighting factors
IEEE C50.13 2006
$37.38