IEEE STD 493 2007
$55.25
IEEE Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems
Published By | Publication Date | Number of Pages |
IEEE | 2007 | 383 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 493-2007 IEEE Std 493-2007 |
3 | IEEE Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems IEEE Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems |
4 | Abstract/Keywords Abstract/Keywords |
5 | Acknowledgments Acknowledgments |
7 | Introduction/Notice to users Introduction/Notice to users |
8 | Participants Participants |
11 | Contents Contents |
15 | Chapter 1 Introduction Chapter 1 Introduction 1.1 Objectives and scope 1.1 Objectives and scope |
16 | 1.2 Summary of contents of each chapter 1.2 Summary of contents of each chapter |
19 | 1.3 How to use this book 1.3 How to use this book 1.4 Normative references 1.4 Normative references |
21 | Chapter 2 Basic concepts of reliability Chapter 2 Basic concepts of reliability 2.1 Introduction 2.1 Introduction 2.2 Definitions 2.2 Definitions |
23 | 2.3 Calculation reference 2.3 Calculation reference |
24 | 2.4 Acronyms and abbreviations 2.4 Acronyms and abbreviations |
25 | 2.5 Review of basic probability 2.5 Review of basic probability |
26 | 2.6 Reliability and availability 2.6 Reliability and availability |
29 | 2.7 Defining frequency and duration of outages and interruptions, l, MTBF 2.7 Defining frequency and duration of outages and interruptions, l, MTBF |
30 | 2.8 Probability distributions 2.8 Probability distributions |
37 | 2.9 Methods of reliability and availability analysis 2.9 Methods of reliability and availability analysis |
41 | 2.10 Performing reliability and availability analyses 2.10 Performing reliability and availability analyses |
42 | 2.11 Bibliography 2.11 Bibliography |
43 | Chapter 3 Planning and design Chapter 3 Planning and design 3.1 Introduction 3.1 Introduction |
44 | 3.2 Fundamentals of power system reliability evaluation 3.2 Fundamentals of power system reliability evaluation |
46 | 3.3 Examples of reliability and availability analysis of common low- voltage industrial power dis… 3.3 Examples of reliability and availability analysis of common low- voltage industrial power dis… |
79 | 3.4 Cost of power outages 3.4 Cost of power outages |
92 | 3.5 IEEE Gold Book Standard Network 3.5 IEEE Gold Book Standard Network |
99 | 3.6 Normative references 3.6 Normative references 3.7 Biography 3.7 Biography |
103 | Chapter 4 Evaluating and improving the reliability of an existing electrical system Chapter 4 Evaluating and improving the reliability of an existing electrical system 4.1 Introduction 4.1 Introduction |
104 | 4.2 Evaluation methodology 4.2 Evaluation methodology |
105 | 4.3 Utility supply availability 4.3 Utility supply availability |
108 | 4.4 Configuration 4.4 Configuration |
110 | 4.5 Assessing control and protection 4.5 Assessing control and protection |
112 | 4.6 Physical assessment 4.6 Physical assessment |
113 | 4.7 Operations and maintenance 4.7 Operations and maintenance |
116 | 4.8 Other vulnerable areas 4.8 Other vulnerable areas |
117 | 4.9 Conclusion 4.9 Conclusion |
118 | 4.10 Normative references 4.10 Normative references 4.11 Bibliography 4.11 Bibliography |
119 | Chapter 5 Preventive maintenance Chapter 5 Preventive maintenance 5.1 Introduction 5.1 Introduction 5.2 Relationship of maintenance practice and equipment failure 5.2 Relationship of maintenance practice and equipment failure |
121 | 5.3 Equipment preventive maintenance 5.3 Equipment preventive maintenance |
123 | 5.4 Design for preventive maintenance 5.4 Design for preventive maintenance |
124 | 5.5 Reliability centered maintenance 5.5 Reliability centered maintenance |
126 | 5.6 Relationship of RCM to other disciplines 5.6 Relationship of RCM to other disciplines |
127 | 5.7 RCM implementation plan 5.7 RCM implementation plan |
128 | 5.8 Data collection requirements 5.8 Data collection requirements |
131 | 5.9 Bibliography 5.9 Bibliography |
133 | Chapter 6 Emergency and standby power Chapter 6 Emergency and standby power 6.1 Introduction 6.1 Introduction |
134 | 6.2 Emergency and standby power supply types 6.2 Emergency and standby power supply types |
142 | 6.3 Conclusions 6.3 Conclusions 6.4 Normative references 6.4 Normative references |
143 | Chapter 7 Voltage sag analysis Chapter 7 Voltage sag analysis 7.1 Introduction 7.1 Introduction |
145 | 7.2 Voltage sag characteristics and reporting 7.2 Voltage sag characteristics and reporting |
149 | 7.3 Equipment susceptibility to voltage sags 7.3 Equipment susceptibility to voltage sags |
152 | 7.4 Line faults—A major cause for voltage sags 7.4 Line faults—A major cause for voltage sags |
153 | 7.5 Voltage sag predictions 7.5 Voltage sag predictions |
163 | 7.6 Methods of stochastic prediction of voltage sags 7.6 Methods of stochastic prediction of voltage sags |
165 | 7.7 Examples for rectangular sag calculations 7.7 Examples for rectangular sag calculations |
173 | 7.8 Nonrectangular sags 7.8 Nonrectangular sags |
177 | 7.9 Development of voltage sag coordination charts 7.9 Development of voltage sag coordination charts |
186 | 7.11 Economic costs of voltage sags 7.11 Economic costs of voltage sags 7.12 Conclusions and future work 7.12 Conclusions and future work |
187 | 7.13 Normative references 7.13 Normative references 7.14 Bibliography 7.14 Bibliography |
191 | Chapter 8 7 x 24 continuous power facilities Chapter 8 7 x 24 continuous power facilities 8.1 Introduction 8.1 Introduction 8.2 Special equipment to support continuous operation 8.2 Special equipment to support continuous operation |
194 | 8.3 Defining failure in a 7 x 24 facility 8.3 Defining failure in a 7 x 24 facility |
196 | 8.4 Reliability and availability as tools in evaluation of critical facilities 8.4 Reliability and availability as tools in evaluation of critical facilities |
199 | 8.5 Critical distribution system configurations 8.5 Critical distribution system configurations |
208 | 8.6 Reliability and availability of critical distribution system configurations 8.6 Reliability and availability of critical distribution system configurations |
211 | 8.7 Normative references 8.7 Normative references 8.8 Bibliography 8.8 Bibliography |
213 | Chapter 9 Reliability and maintainability verification Chapter 9 Reliability and maintainability verification 9.1 Introduction 9.1 Introduction |
214 | 9.2 Definition of success ratio 9.2 Definition of success ratio |
215 | 9.3 Acceptance sampling plan 9.3 Acceptance sampling plan |
216 | 9.4 Minimizing manufacturer and customer risks 9.4 Minimizing manufacturer and customer risks |
217 | 9.5 Sequential testing plan 9.5 Sequential testing plan |
218 | 9.6 Development of a sequential testing plan 9.6 Development of a sequential testing plan |
219 | 9.7 Compliance sequential test acceptance limits 9.7 Compliance sequential test acceptance limits |
220 | 9.8 Compliance sequential test rejection limits 9.8 Compliance sequential test rejection limits |
223 | 9.9 Case study 9.9 Case study |
224 | 9.10 Discussion of sequential tests 9.10 Discussion of sequential tests |
225 | 9.11 Conclusion 9.11 Conclusion |
226 | 9.12 Normative references 9.12 Normative references 9.13 Bibliography 9.13 Bibliography |
227 | Chapter 10 Summary of equipment reliability data Chapter 10 Summary of equipment reliability data 10.1 Introduction 10.1 Introduction |
235 | 10.2 Part 1: Mechanical and electrical equipment reliability and availability data collection con… 10.2 Part 1: Mechanical and electrical equipment reliability and availability data collection con… |
273 | 10.3 Part 2: Equipment reliability surveys (1976–1989) 10.3 Part 2: Equipment reliability surveys (1976–1989) |
297 | 10.4 Part 3: Equipment reliability surveys conducted prior to 1976 10.4 Part 3: Equipment reliability surveys conducted prior to 1976 |
314 | 10.5 Bibliography 10.5 Bibliography |
319 | Chapter 11 Data collection Chapter 11 Data collection 11.1 Data collection 11.1 Data collection 11.2 Facility identification data 11.2 Facility identification data 11.3 Facility one-line drawings 11.3 Facility one-line drawings 11.4 Nameplate information 11.4 Nameplate information |
320 | 11.5 Critical equipment designation and sparing 11.5 Critical equipment designation and sparing 11.6 Maintenance data 11.6 Maintenance data 11.7 Data forms 11.7 Data forms |
323 | Annex 11A (informative) Data collection forms Annex 11A (informative) Data collection forms |
377 | Annexes A–Q Annexes A–Q |
379 | Index Index |