IEEE STD C62.1 1989:1990 Edition
$10.40
IEEE Standard for Gapped Silicon-Carbide Surge Arresters for AC Power Circuits
Published By | Publication Date | Number of Pages |
IEEE | 1990 | 51 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Title page Title page |
3 | Introduction Introduction Participants Participants |
6 | CONTENTS CONTENTS |
8 | 1. Scope 1. Scope 2. Definitions 2. Definitions |
12 | 3. References 3. References 4. Service Conditions 4. Service Conditions 4.1 Usual Service Conditions 4.1 Usual Service Conditions 4.2 Unusual Service Conditions 4.2 Unusual Service Conditions |
13 | 5. Classification and Voltage Rating of Arresters 5. Classification and Voltage Rating of Arresters 5.1 Voltage Ratings 5.1 Voltage Ratings 5.2 Test Requirements 5.2 Test Requirements 6. Performance Characteristics and Tests 6. Performance Characteristics and Tests 6.1 Voltage Withstand Tests 6.1 Voltage Withstand Tests |
14 | 6.2 Power-Frequency Sparkover Test 6.2 Power-Frequency Sparkover Test 6.3 Discharge-Current Withstand Tests 6.3 Discharge-Current Withstand Tests 6.4 Impulse Sparkover Voltage-Time Characteristics 6.4 Impulse Sparkover Voltage-Time Characteristics 6.5 Discharge-Voltage Tests 6.5 Discharge-Voltage Tests |
16 | 6.6 Duty-Cycle Test 6.6 Duty-Cycle Test 6.7 Radio-Influence Voltage Test 6.7 Radio-Influence Voltage Test 6.8 Internal-Ionization Voltage Test 6.8 Internal-Ionization Voltage Test 6.9 Pressure-Relief and Fault-Current Withstand Tests 6.9 Pressure-Relief and Fault-Current Withstand Tests 6.10 Contamination Tests 6.10 Contamination Tests 6.11 Disconnector Tests 6.11 Disconnector Tests 7. Test Procedures 7. Test Procedures 7.1 Complete Arrester Test Specimens 7.1 Complete Arrester Test Specimens |
17 | 7.2 Prorated Arrester Test Section 7.2 Prorated Arrester Test Section 7.3 Test Measurements 7.3 Test Measurements 7.4 Impulse Test-Wave Tolerances 7.4 Impulse Test-Wave Tolerances |
18 | 7.5 Power-Frequency Test Voltages 7.5 Power-Frequency Test Voltages 8. Design Tests for Secondary, Intermediate, and Station Class Arresters 8. Design Tests for Secondary, Intermediate, and Station Class Arresters 8.1 Voltage Withstand Tests of Arrester Insulation 8.1 Voltage Withstand Tests of Arrester Insulation |
19 | 8.2 Power-Frequency Sparkover and Withstand Tests of Complete Arresters 8.2 Power-Frequency Sparkover and Withstand Tests of Complete Arresters |
20 | 8.3 Impulse Sparkover Voltage-Time Characteristics 8.3 Impulse Sparkover Voltage-Time Characteristics |
22 | 8.4 Discharge-Voltage Characteristics 8.4 Discharge-Voltage Characteristics 8.5 Switching-Impulse Discharge-Voltage Test 8.5 Switching-Impulse Discharge-Voltage Test |
23 | 8.6 Discharge-Current Withstand Tests 8.6 Discharge-Current Withstand Tests |
28 | 8.7 Duty-Cycle Tests 8.7 Duty-Cycle Tests |
29 | 8.8 Internal-Ionization Voltage and Radio-Influence Voltage (RIV) 8.8 Internal-Ionization Voltage and Radio-Influence Voltage (RIV) |
30 | 8.9 Pressure-Relief Tests for Station and Intermediate Arresters 8.9 Pressure-Relief Tests for Station and Intermediate Arresters |
33 | 8.10 Contamination Tests 8.10 Contamination Tests |
35 | 9. Design Tests for Distribution Class Surge Arrester 9. Design Tests for Distribution Class Surge Arrester 9.1 Voltage Withstand Tests of Arrester Insulation 9.1 Voltage Withstand Tests of Arrester Insulation 9.2 Power-Frequency Sparkover and Withstand Tests of Complete Arresters 9.2 Power-Frequency Sparkover and Withstand Tests of Complete Arresters 9.3 Impulse Sparkover Voltage-Time Characteristics 9.3 Impulse Sparkover Voltage-Time Characteristics |
36 | 9.4 Discharge-Voltage Characteristics 9.4 Discharge-Voltage Characteristics |
37 | 9.5 Discharge-Current Withstand Tests 9.5 Discharge-Current Withstand Tests |
38 | 9.6 Duty-Cycle Tests 9.6 Duty-Cycle Tests |
40 | 9.7 Internal-Ionization Voltage and Radio-Influence Voltage (RIV) Tests 9.7 Internal-Ionization Voltage and Radio-Influence Voltage (RIV) Tests 9.8 Fault Current Withstand Tests 9.8 Fault Current Withstand Tests |
42 | 9.9 Disconnector Tests 9.9 Disconnector Tests |
44 | 9.10 Contamination Tests 9.10 Contamination Tests |
45 | 9.11 Sealing System Test 9.11 Sealing System Test |
46 | 10. Routine Tests for Distribution Class Surge Arrester 10. Routine Tests for Distribution Class Surge Arrester 10.1 Routine Tests 10.1 Routine Tests |
47 | 11. Conformance Tests 11. Conformance Tests 11.1 Conformance Tests 11.1 Conformance Tests 12. Construction 12. Construction 12.1 Identification Data 12.1 Identification Data |
48 | 12.2 Standard Mountings 12.2 Standard Mountings 12.3 Iron and Steel Parts 12.3 Iron and Steel Parts 12.4 Terminal Connections 12.4 Terminal Connections |
49 | 12.5 Housing Leakage Distance 12.5 Housing Leakage Distance 13. Protective Characteristics 13. Protective Characteristics 14. Certification Test Procedures for Arresters Applied to Unit Substations 14. Certification Test Procedures for Arresters Applied to Unit Substations 14.1 General 14.1 General 14.2 Tests 14.2 Tests |
50 | 14.3 Evaluation Procedure 14.3 Evaluation Procedure 14.4 Certification 14.4 Certification |
51 | 14.5 Production Monitoring and Product Retest Requirements 14.5 Production Monitoring and Product Retest Requirements |