Shopping Cart

No products in the cart.

ISA 77.70.02-2014

$15.60

Fossil Fuel Power Plant Instrument Piping Installation

Published By Publication Date Number of Pages
ISA 2014-12-15 26
Guaranteed Safe Checkout
Categories: , , ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Full Description

This standard covers the mechanical design, engineering, fabrication, installation, testing, and protection of fossil power plant instrumentation sensing and control lines. The boundaries of this standard span the process tap root valve to the instrument connection. This standard applies to all fluid media (liquid, gas, or vapor).

Purpose

This standard establishes the applicable installation requirements and limits of instrumentation sensing and control lines and their instruments in fossil power plants.

This standard addresses the requirements of maintaining the pressure boundary integrity of the instrumentation sensing line (in accordance with the appropriate parts of American National Standards Institute [ANSI] standards).

ISA 77.70.02-2014
$15.60