Shopping Cart

No products in the cart.

IWA 33-3:2021

$50.70

Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements

Published By Publication Date Number of Pages
ISO 2021-03 90
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.

Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.

IWA 33-3:2021
$50.70