ANSI/NETA ECS-2020 Standard for Electrical Commissioning Specifications for Electrical Power Equipment and Systems

Published By Publication Date Number of Pages
NETA 2020 46
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

The ANSI/NETA Standard for Electrical Commissioning Specifications for Electrical Power Equipment and Systems was developed for use by those responsible for testing and commissioning newly installed or retrofitted electrical power systems and equipment to guide them in specifying and performing the necessary inspections, tests, measurements, and system performance verification to commission an electrical power system infrastructure. This document aids in ensuring safe, reliable operation of the electrical power equipment and systems. It is essential to commission newly installed and retrofitted electrical power equipment and systems. Additionally, acceptance testing of the equipment provides the baseline test results for maintenance programs and equipment trending, while commissioning verifies the electrical equipment and system meets the owner’s project requirements and basis of design. The 2020 ANSI/NETA Standard for Electrical Commissioning Specifications for Electrical Power Equipment and Systems is the second edition and most current revision of this document, and was approved as an American National Standard on September 9, 2019.

PDF Catalog

PDF Pages PDF Title
11 1.1 Electrical Commissioning Specifications
12 2.1 Codes, Standards, and Specifications
13 2.2 Other Publications
2.3 Contact Information
15 3.1 Commissioning Organization
3.2 Commissioning Personnel
16 4.1 The Owner’s Representative
4.2 The Commissioning Organization
17 5.1 Safety and Precautions
5.2 Suitability of Test Equipment
18 5.3 Test Instrument Calibration
19 5.4 Documentation
20 6.1 Commissioning Intent
6.2 Owner’s Project Requirements
6.3 Basis of Design
6.4 Commissioning Plan
23 7.1 Low-Voltage Systems (< 1 kV)
26 7.2 Medium-Voltage Systems, Systems Between (> 1 kV and < 100 kV)
31 7.3 High-Voltage and Extra-High Voltage Systems (> 100 kV and < 1,000 kV)
34 8. PRIME, EMERGENCY, AND STANDBY POWER SYSTEMS – RESERVED
36 9.1 Visual and Mechanical Inspection
9.2 Report
9.3 Test Parameters
9.4 Test Results
37 10. TRANSFER TO OWNER/OPERATOR
38 APPENDIX A
41 APPENDIX B
43 APPENDIX C
45 APPENDIX D
46 APPENDIX E