NFPA 17A:2009 Edition
$80.71
Standard for Wet Chemical Extinguishing Systems
Published By | Publication Date | Number of Pages |
NFPA | 2009 | 21 |
NFPA 17A: Standard for Wet Chemical Extinguishing Systems outlines today’s rules for wet chemical extinguishing systems associated with restaurant and institutional hoods, plenums, ducts, and associated cooking appliances. Everything you need to maximize equipment integrity and reliability is covered:
- Components
- System requirements
- Plans and acceptance tests
- Inspection, maintenance, and recharging
Changes in the 2009 edition include clarified criteria for certification and training of maintenance personnel and a new requirement for tagging of all non-compliant systems.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | Important Notices and Disclaimers Important Notices and Disclaimers |
3 | Additional Notices and Disclaimers Additional Notices and Disclaimers |
4 | 2.1 General 2.1 General 2.2 NFPA Publications 2.2 NFPA Publications |
7 | Chapter 1 Administration Chapter 1 Administration 1.1 Scope 1.1 Scope 1.2 Purpose 1.2 Purpose 1.3 Application 1.3 Application 1.4 Retroactivity 1.4 Retroactivity 1.5 Equivalency 1.5 Equivalency 1.6 Units and Formulas 1.6 Units and Formulas 1.7 Qualifications 1.7 Qualifications Chapter 2 Referenced Publications Chapter 2 Referenced Publications 2.3 Other Publications 2.3 Other Publications 2.4 References for Extracts in Mandatory Sections 2.4 References for Extracts in Mandatory Sections |
8 | Chapter 3 Definitions Chapter 3 Definitions 3.1 General 3.1 General 3.2 NFPA Official Definitions 3.2 NFPA Official Definitions 3.3 General Definitions 3.3 General Definitions |
9 | Chapter 4 Components Chapter 4 Components 4.1 General 4.1 General 4.2 Detectors 4.2 Detectors 4.3 Discharge Nozzles 4.3 Discharge Nozzles 4.4 Operating Devices 4.4 Operating Devices 4.5 Pipe and Fittings, Tubing, Hose 4.5 Pipe and Fittings, Tubing, Hose 4.6 Wet Chemical 4.6 Wet Chemical 4.7 Electrical Wiring and Equipment 4.7 Electrical Wiring and Equipment 4.8 Indicators 4.8 Indicators Chapter 5 System Requirements Chapter 5 System Requirements 5.1 General 5.1 General |
10 | 5.2 System Actuation 5.2 System Actuation 5.3 Supervision 5.3 Supervision 5.4 System Location 5.4 System Location |
11 | 5.5 Discharge Nozzles 5.5 Discharge Nozzles 5.6 Special Requirements 5.6 Special Requirements Chapter 6 Plans and Acceptance Tests Chapter 6 Plans and Acceptance Tests 6.1 Specifications 6.1 Specifications 6.2 Review and Certification 6.2 Review and Certification 6.3 Plans 6.3 Plans |
12 | 6.4 Approval of Installations 6.4 Approval of Installations Chapter 7 Inspection, Maintenance, and Recharging Chapter 7 Inspection, Maintenance, and Recharging 7.1 General 7.1 General 7.2 Owner’s Inspection 7.2 Ownerās Inspection 7.3 Maintenance 7.3 Maintenance |
13 | 7.4 Recharging 7.4 Recharging 7.5 Hydrostatic Testing 7.5 Hydrostatic Testing Annex A Explanatory Material Annex A Explanatory Material |
16 | Annex B Informational References Annex B Informational References |
17 | Index Index |