Shopping Cart

No products in the cart.

NFPA 3 12:2012 Edition

$80.71

NFPA 3: Recommended Practice on Commissioning and Integrated Testing of Fire Protection and Life Safety Systems

Published By Publication Date Number of Pages
NFPA 2012 58
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Introducing NFPA 3 — the first and only commissioning program for fire protection and life safety systems. Lack of accountability for the commissioning of fire protection and life safety systems jeopardizes system functionality and causes conflicts between designers, contractors, owners, and AHJs. All-new NFPA 3: Recommended Practice on Commissioning and Integrated Testing of Fire Protection and Life Safety Systems resolves these issues with a complete commissioning program for system start-up and testing. Developed in response to a request from the National Institute of Building Science (NIBS), this landmark 2012 edition document outlines a process for the commissioning and integrated testing of interconnected safety systems, to help stakeholders verify systems are optimized to function as intended. NFPA 3 covers procedures, methods, responsibilities, and documentation. Adaptable for all types of systems — fire protection suppression and control, fire alarm, emergency communications, smoke control, power, fire doors, commercial cooking operations, elevators, and more — NFPA 3 spells out:     Qualifications of commissioning team members, such as job titles     Thirteen categories for a commissioning team appropriate to the project size and scope     Guidelines for an integrated testing plan developed by an integrated testing agent     Direction for retro-commissioning and recommissioning of existing buildings to verify system performance and interconnectivity     Forms and reports that provide a baseline for documentation NFPA 3 is a breakthrough in building safety. Make commissioning and integrated testing clear. Ensure systems are ready for action with practical guidance in a single source.

PDF Catalog

PDF Pages PDF Title
1 NFPA® 3
2 Important Notices and Disclaimers
3 Additional Notices and Diclaimers
4 2.1 General
2.2 NFPA Publications
7 Chapter 1 Administration
1.1 Scope
1.2 Purpose
1.3 Application
1.4 New Technology
8 Chapter 2 Referenced Publications
2.3 Other Publications
2.4 References for Extracts in Recommendations Sections
Chapter 3 Definitions
3.1 General
3.2 NFPA Official Definitions
3.3 General Definitions
9 Chapter 4 Qualifications of Commissioning Personnel
4.1 Applicability
4.2 Qualifications
11 Chapter 5 Commissioning
5.1 General
5.2 Planning Phase
14 5.3 Design Phase
15 5.4 Construction Phase
16 5.5 Occupancy Phase
Chapter 6 Integrated Systems Commissioning
6.1 General
6.2 Design Phase
17 6.3 Construction Phase
6.4 Occupancy Phase
6.5 Data Sharing Systems
Chapter 7 Integrated System Testing
7.1 General
7.2 Test Frequency
18 7.3 Test Method
7.4 Testing Responsibility
Chapter 8 Re-commissioning (Re-Cx) and Retro-commissioning (RCx) of Fire Protection and Life Safety Systems
8.1 General
8.2 Re-commissioning
8.3 Retro-commissioning
19 Chapter 9 Commissioning Documentation and Forms
9.1 Documentation
9.2 Allowable Documents
9.3 Forms and Checklists
9.4 Document Retention
Annex A Explanatory Material
36 Annex B Sample Basis of Design Narrative Report
38 Annex C Sample Commissioning Documentation
51 Annex D Referenced Publications
52 Index
NFPA 3 12
$80.71