NFPA 59A 13:2013 Edition
$80.71
NFPA 1961: Standard on Fire Hose
Published By | Publication Date | Number of Pages |
NFPA | 2013 | 73 |
Apply NFPA 59A for LNG plant safety and compliance throughout the United States and in installations around the globe.
Liquefied Natural Gas (LNG) plants must meet the requirements of NFPA 59A: Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG), adopted by D.O.T. and referenced by other agencies including the Federal Energy Regulatory Commission. In addition to use in the U.S., NFPA 59A is trusted worldwide as the final word on site selection, design, construction, and fire protection for LNG plants.
New Chapter 15 incorporates a performance-based option.
The 2013 edition of NFPA 59A relocates Annex E, Performance-Based Alternative Standard for Plant Siting into the mandatory text as new Chapter 15, Performance (Risk Assessment) Based LNG Plant Siting. This performance-based option requires analyzing the risks to persons and property in the area surrounding the proposed LNG plant based on risk mitigation techniques incorporated into the facility design. The analysis and siting plan must then be approved by the local Authority Having Jurisdiction (AHJ). Tables and figures in new Chapter 15 help facility designers and AHJs identify risks and determine if risks are tolerable.
Other important changes in the 2013 NFPA 59A:
- Revised Design Spill table separates the design spill requirements for over-the-top fill/withdrawal containers, other containers, and process areas.
- Scope statements have been added to each chapter.
- Term radiant heat flux replaces thermal radiation throughout the document.
The latest edition of NFPA 59A is essential for architects, owners, designers, engineers, fire safety officers, AHJs, and anyone responsible for LNG plant safety.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | Important Notices and Disclaimers |
3 | Additional Notices and Disclaimers |
4 | 2.1 General 2.2 NFPA Publications |
8 | Chapter 1 Administration 1.1 Scope 1.2 Purpose 1.3 Equivalency 1.4 Retroactivity 1.5 SI Units 1.6 Referenced Standards Chapter 2 Referenced Publications |
9 | 2.3 Other Publications |
10 | 2.4 References for Extracts in Mandatory Sections Chapter 3 Definitions 3.1 General 3.2 NFPA Official Definitions 3.3 General Definitions |
11 | Chapter 4 General Requirements 4.1 Scope 4.2 Corrosion Control Overview 4.3 Control Center |
12 | 4.4 Sources of Power 4.5 Records 4.6 Noncombustible Material Chapter 5 Plant Siting and Layout 5.1 Scope 5.2 Plant Site Provisions 5.3 Site Provisions for Spill and Leak Control |
17 | 5.4 Buildings and Structures. |
18 | 5.5 Designer and Fabricator Competence 5.6 Soil Protection for Cryogenic Equipment 5.7 Falling Ice and Snow 5.8 Concrete Design and Materials. 5.9 Portable LNG Facility |
19 | Chapter 6 Process Equipment 6.1 Scope 6.2 Installation of Process Equipment 6.3 Pumps and Compressors 6.4 Flammable Refrigerant and Flammable Liquid Storage 6.5 Process Equipment |
20 | Chapter 7 Stationary LNG Storage 7.1 Scope 7.2 General. 7.3 Design Considerations |
22 | 7.4 Tank Systems. |
24 | 7.5 ASME Containers Designed for Operation at More Than 15 psi (103 kPa) |
25 | Chapter 8 Vaporization Facilities 8.1 Scope 8.2 Classification of Vaporizers 8.3 Design and Materials of Construction |
26 | 8.4 Vaporizer Piping, Intermediate Fluid Piping, and Storage Valves 8.5 Relief Devices on Vaporizers 8.6 Combustion Air Supply 8.7 Products of Combustion Chapter 9 Piping Systems and Components 9.1 Scope 9.2 General |
27 | 9.3 Materials of Construction |
28 | 9.4 Installation |
29 | 9.5 Pipe Supports 9.6 Piping Identification 9.7 Inspection, Examination, and Testing of Piping |
30 | 9.8 Purging of Piping Systems 9.9 Safety and Relief Valves 9.10 Corrosion Control 9.11 Cryogenic Pipe-in-Pipe Systems. |
31 | Chapter 10 Instrumentation and Electrical Services 10.1 Scope 10.2 Liquid Level Gauging 10.3 Pressure Gauging 10.4 Vacuum Gauging 10.5 Temperature Indicators 10.6 Emergency Shutdown 10.7 Electrical Equipment |
35 | 10.8 Electrical Grounding and Bonding Chapter 11 Transfer Systems for LNG, Refrigerants, and Other Flammable Fluids 11.1 Scope 11.2 General Requirements 11.3 Piping System 11.4 Pump and Compressor Control 11.5 Marine Shipping and Receiving |
36 | 11.6 Tank Vehicle and Tank Car Loading and Unloading Facilities 11.7 Pipeline Shipping and Receiving 11.8 Hoses and Arms |
37 | 11.9 Communications and Lighting Chapter 12 Fire Protection, Safety, and Security 12.1 Scope 12.2 General 12.3 Emergency Shutdown (ESD) Systems 12.4 Fire and Leak Detection |
38 | 12.5 Fire Protection Water Systems 12.6 Fire Extinguishing and Other Fire Control Equipment 12.7 Maintenance of Fire Protection Equipment 12.8 Personnel Safety 12.9 Security Chapter 13 Requirements for Stationary Applications Using ASME Containers 13.1 Scope 13.2 General Requirements |
39 | 13.3 Containers |
40 | 13.4 Container Filling 13.5 Container Foundations and Supports 13.6 Container Installation 13.7 Automatic Product Retention Valves 13.8 LNG Spill Containment |
41 | 13.9 Inspection 13.10 Shop Testing of LNG Containers 13.11 Shipment of LNG Containers 13.12 Field Testing of LNG Containers 13.13 Welding on Containers |
42 | 13.14 Piping 13.15 Container Instrumentation 13.16 Fire Protection and Safety 13.17 Gas Detection 13.18 Operations and Maintenance |
45 | Chapter 14 Operating, Maintenance, and Personnel Training 14.1 Scope 14.2 General Requirements 14.3 Manual of Operating Procedures |
46 | 14.4 Emergency Procedures 14.5 Monitoring Operations. |
47 | 14.6 Transfer of LNG and Flammables. |
48 | 14.7 Maintenance Manual |
49 | 14.8 Maintenance |
50 | 14.9 Personnel Training |
51 | 14.10 Records Chapter 15 Performance (Risk Assessment) Based LNG Plant Siting 15.1 Scope 15.2 General Requirements 15.3 Definitions 15.4 Risk Calculations and Basis of Assessment |
52 | 15.5 LNG and Other Hazardous Materials Release Scenarios 15.6 Release Probabilities and Conditional Probabilities |
53 | 15.7 Environmental Conditions and Occurrence Probabilities 15.8 Hazard and Consequence Assessment |
54 | 15.9 Risk Result Presentation 15.10 Risk Tolerability Criteria 15.11 Risk Mitigation Approaches |
55 | Annex A Explanatory Material |
62 | Annex B Seismic Design of LNG Plants |
63 | Annex C Security |
64 | Annex D Training |
65 | Annex E Informational References |
67 | Index |
70 | Formal Interpretation |