Shopping Cart

No products in the cart.

NFPA 92A 2009

$80.71

Recommended Practice for Smoke-Control Systems

Published By Publication Date Number of Pages
NFPA 2009 38
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Prevent the spread of smoke with NFPA 92A: Standard for Smoke-Control Systems Utilizing Barriers and Pressure Differences.

Updated to reflect recent research and technology changes, the 2009 edition of NFPA 92A provides mandatory provisions for the design, installation, and testing of smoke control systems.

Consult this edition for the latest information on:

  • Power supplies for smoke control systems
  • Openings and leakage through smoke barriers including egress doors in stairways
  • System wiring
  • Design documentation
  • Test procedures
  • Zoning of elevator shafts and elevator lobbies

Adoptable and enforceable by local authorities, the 2009

NFPA 92A

is a “must” for enforcers, engineers, architects, and industry professionals.

PDF Catalog

PDF Pages PDF Title
2 Important Notices and Disclaimers
Important Notices and Disclaimers
3 Additional Notices and Disclaimers
Additional Notices and Disclaimers
4 2.1 General
2.1 General
2.2 NFPA Publications
2.2 NFPA Publications
7 Chapter 1 Administration
Chapter 1 Administration
1.1 Scope
1.1 Scope
1.2 Purpose
1.2 Purpose
1.3 Application
1.3 Application
1.4 Retroactivity
1.4 Retroactivity
1.5 Equivalency
1.5 Equivalency
Chapter 2 Referenced Publications
Chapter 2 Referenced Publications
2.3 Other Publications
2.3 Other Publications
8 2.4 References for Extracts in Mandatory Sections
2.4 References for Extracts in Mandatory Sections
Chapter 3 Definitions
Chapter 3 Definitions
3.1 General
3.1 General
3.2 NFPA Official Definitions
3.2 NFPA Official Definitions
3.3 General Definitions
3.3 General Definitions
9 Chapter 4 Fundamentals
Chapter 4 Fundamentals
4.1 Design Objectives
4.1 Design Objectives
4.2 Design Basis
4.2 Design Basis
4.3 Design Approaches
4.3 Design Approaches
4.4 Tenability
4.4 Tenability
4.5 Egress Analysis
4.5 Egress Analysis
4.6 Design Considerations
4.6 Design Considerations
4.7 Gaseous Fire Suppression Systems
4.7 Gaseous Fire Suppression Systems
Chapter 5 Smoke-Control Systems and Applicability
Chapter 5 Smoke-Control Systems and Applicability
5.1 System Operation
5.1 System Operation
5.2 Pressure Differences
5.2 Pressure Differences
10 5.3 Stairwell Pressurization Systems
5.3 Stairwell Pressurization Systems
5.4 Elevator Smoke Control
5.4 Elevator Smoke Control
5.5 Zoned Smoke Control
5.5 Zoned Smoke Control
5.6 Smoke Refuge Areas
5.6 Smoke Refuge Areas
5.7 Combination of Systems
5.7 Combination of Systems
Chapter 6 Building Equipment and Controls
Chapter 6 Building Equipment and Controls
6.1 General
6.1 General
6.2 Heating, Ventilating, and Air-Conditioning (HVAC) Equipment
6.2 Heating, Ventilating, and Air-Conditioning (HVAC) Equipment
6.3 Smoke Dampers.
6.3 Smoke Dampers.
11 6.4 Controls
6.4 Controls
13 6.5 Energy Management
6.5 Energy Management
6.6 Materials
6.6 Materials
6.7 Electric Services Installation
6.7 Electric Services Installation
Chapter 7 Smoke-Control System Design Documentation
Chapter 7 Smoke-Control System Design Documentation
7.1 Documentation Required
7.1 Documentation Required
Chapter 8 Testing
Chapter 8 Testing
8.1 General
8.1 General
8.2 Preliminary Building Inspections
8.2 Preliminary Building Inspections
14 8.3 Operational Testing
8.3 Operational Testing
8.4 Acceptance Testing
8.4 Acceptance Testing
16 8.5 Modifications
8.5 Modifications
8.6 Periodic Testing
8.6 Periodic Testing
Annex A Explanatory Material
Annex A Explanatory Material
25 Annex B Types of Stairwell Pressurization Systems
Annex B Types of Stairwell Pressurization Systems
27 Annex C HVAC Air-Handling System Types
Annex C HVAC Air-Handling System Types
28 Annex D Fire Fighters’ Smoke-Control Station (FSCS) Considerations
Annex D Fire Fighters’ Smoke-Control Station (FSCS) Considerations
29 Annex E Information on Testing for Leakage Between Smoke Zones
Annex E Information on Testing for Leakage Between Smoke Zones
31 Annex F Advisory Information on Acceptance Testing
Annex F Advisory Information on Acceptance Testing
Annex G Informational References
Annex G Informational References
33 Index
Index
NFPA 92A 2009
$80.71