RI FuelGasCode 2019 1stptg
$51.73
Rhode Island Fuel Gas Code, 1st Printing
Published By | Publication Date | Number of Pages |
RI | 2019 | 227 |
This is a fully integrated code based on the 2015 IFGC.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 2019 RHODE ISLAND FUEL GAS CODE |
2 | 2019 RHODE ISLAND FUEL GAS CODE BASED ON THE 2015 INTERNATIONAL FUEL GAS CODEยฎ TITLE PAGE |
3 | COPYRIGHT |
4 | PREFACE |
8 | EFFECTIVE USE OF THE INTERNATIONAL FUEL GAS CODE |
10 | LEGISLATION |
12 | RHODE ISLAND STATE BUILDING CODE SBC-19 STATE FUEL GAS CODE |
13 | REGULATION SBC-19 STATE FUEL GAS CODE AUGUST 1, 2019 |
14 | STATE OF RHODE ISLAND BUILDING CODE STANDARDS COMMITTEE |
15 | STATE BUILDING CODE REGULATIONS โ 2019 |
16 | TABLE OF CONTENTS |
18 | CHAPTER 23โ27.3 STATE BUILDING CODE ยง 23-27.3-100.0 SCOPE ยง 23-27.3-100.1 SHORT TITLE – APPLICABILITY ยง 23-27.3-100.1.1 CHAPTER TITLE – APPLICABILITY ยง 23-27.3-100.1.2 PURPOSE ยง 23-27.3-100.1.3 CREATION OF THE STATE BUILDING CODE STANDARDS COMMITTEE |
19 | ยง 23-27.3-100.1.4 APPOINTMENT AND QUALIFICATIONS OF THE COMMITTEE ยง 23-27.3-100.1.5 BUILDING CODE – ADOPTION AND PROMULGATION BY COMMITTEE |
20 | ยง 23-27.3-100.1.5.1 HOUSING AND MAINTENANCE CODE ยง 23-27.3-100.1.5.2 EXISTING CODES ยง 23-27.3-100.1.5.3 STATE REHABILITATION BUILDING AND FIRE CODE FOR EXISTING BUILDINGS AND STRUCTURES ยง 23-27.3-100.1.5.4 STATE ENERGY CONSERVATION CODE |
21 | ยง 23-27.3-100.1.5.5 HURRICANE, STORM, AND FLOOD STANDARDS ยง 23-27.3-100.1.6 COMMITTEE AS BOARD OF STANDARDS AND APPEALS – POWERS AND DUTIES – APPEALS ยง 23-27.3-100.1.7 EFFECT OF LOCAL CODES – REPEAL OF LOCAL AUTHORITY ยง 23-27.3-100.1.8 SEVERABILITY ยง 23-27.3-100.2 APPLICATION OF REFERENCES ยง 23-27.3-100.3 CONSTRUCTION ยง 23-27.3-100.4 SPECIALIZED CODES INCORPORATED |
22 | ยง 23-27.3-101.0 MATTERS COVERED ยง 23-27.3-101.1 EXEMPTION FOR ORDINARY REPAIRS ยง 23-27.3-101.2 MATTERS NOT COVERED ยง 23-27.3-101.2.1 PROPOSED BUILDINGS ยง 23-27.3-101.2.2 BUILDINGS AND STRUCTURES, EXISTING AND UNDER CONSTRUCTION ยง 23-27.3-101.3 ZONING RESTRICTIONS ยง 23-27.3-102.0 ORDINARY REPAIRS ยง 23-27.3-103.0 INSTALLATION OF SERVICE EQUIPMENT ยง 23-27.3-104.0 MAINTENANCE |
23 | ยง 23-27.3-104.1 OWNER RESPONSIBILITY ยง 23-27.3-105.0 CHANGE IN EXISTING USE 23-27.3-105.1 CONTINUATION OF EXISTING USE ยง 23-27.3-105.2 CHANGE IN USE AND OCCUPANCY ยง 23-27.3-105.3 PART CHANGE IN USE ยง 23-27.3-105.4 REESTABLISHMENT OF A PRIOR USE ยง 23-27.3-106.0 EXISTING STRUCTURES ยง 23-27.3-106.1 SUBSTANTIAL IMPROVEMENTS ยง 23-27.3-106.2 SUBSTANTIAL DAMAGES EXCEEDING FIFTY PERCENT |
24 | ยง 23-27.3-106.3 IMPROVEMENTS AND DAMAGES BETWEEN TWENTY-FIVE AND FIFTY PERCENT OF VALUE ยง 23-27.3-106.4 IMPROVEMENTS OR DAMAGES UNDER TWENTY-FIVE PERCENT OF VALUE ยง 23-27.3-106.5 PHYSICAL VALUE ยง 23-27.3-107.0 DEPARTMENT OF BUILDING INSPECTION ยง 23-27.3-107.1 LOCAL BUILDING OFFICIAL – APPOINTMENT ยง 23-27.3-107.1.1 LOCAL INSPECTOR ยง 23-27.3-107.2 ALTERNATE LOCAL BUILDING OFFICIAL |
25 | ยง 23-27.3-107.3 APPOINTMENT OF PERSONNEL BY STATE BUILDING COMMISSIONER ยง 23-27.3-107.4 QUALIFICATIONS AND DUTIES OF THE STATE BUILDING COMMISSIONER ยง 23-27.3-107.5 LOCAL BUILDING OFFICIAL – QUALIFICATIONS – POWERS AND DUTIES ยง 23-27.3-107.6 CERTIFICATION OF LOCAL BUILDING OFFICIALS – EDUCATIONAL PROGRAMS |
26 | ยง 23-27.3-107.7 RECERTIFICATION AND CONTINUING EDUCATION ยง 23-27.3-107.8 RESTRICTION ON EMPLOYEES’ ACTIVITIES ยง 23-27.3-107.9 RELIEF FROM PERSONAL RESPONSIBILITY ยง 23-27.3-108.0 DUTIES AND POWERS OF THE BUILDING OFFICIAL AND THE STATE BUILDING COMMISSIONER ยง 23-27.3-108.1 LOCAL BUILDING OFFICIAL – ENFORCEMENT DUTIES ยง 23-27.3-108.1.1 APPLICATIONS AND PERMITS ยง 23-27.3-108.1.3 NEW MATERIALS AND METHODS OF CONSTRUCTION |
27 | ยง 23-27.3-108.1.3.1 TEST RESULTS ยง 23-27.3-108.1.3.2 RETESTING ยง 23-27.3-108.1.4 INSPECTIONS ยง 23-27.3-108.1.5 REPLEALED ยง 23-27.3-108.1.6 ADMINISTRATIVE PROCEDURES ยง 23-27.3-108.1.7 DEPARTMENT RECORDS ยง 23-27.3-108.1.8 REPORTS ยง 23-27.3-108.2 STATE BUILDING COMMISSIONER’S DUTIES |
28 | ยง 23-27.3-108.2.0.1 REPEALED ยง 23-27.3-108.2.1 DUTIES OF COMMITTEE 23-27.3-108.2.2 COMPENSATION OF COMMITTEE MEMBERS ยง 23-27.3-108.2.3 EMERGENCY PROCEDURES ยง 23-27.3-108.2.4 MUNICIPAL ADVISORY COUNCIL ON STATEWIDE PERMITTING ยง 23-27.3-109.0 COMMITTEE ยง 23-27.3-109.1 COMMITTEE’S RULE MAKING AUTHORITY – LEGISLATIVE REPORT – LEGISLATIVE COMMITTEE |
29 | ยง 23-27.3-109.1.1 COMMITTEE – LICENSING OF LABORATORIES AND TEST PERSONNEL ยง 23-27.3-109.1.2 COMMITTEE – REGULATION OF MANUFACTURED BUILDINGS ยง 23-27.3-109.1.3 ADOPTION OF FEDERAL STANDARDS FOR MANUFACTURED HOMES ยง 23-27.3-109.1.3.1 INSPECTION OF MANUFACTURED HOMES MANUFACTURERS ยง 23-27.3-109.1.3.2 PENALTIES FOR VIOLATION AS TO MANUFACTURED HOMES |
30 | ยง 23-27.3-109.1.3.3 MONITORING INSPECTION FEE ยง 23-27.3-109.1.3.4 REPORTS OF MANUFACTURED HOME MANUFACTURERS, DISTRIBUTORS, AND DEALERS ยง 23-27.3-109.1.3.5 TEMPORARY GREENHOUSE DEFINED ยง 23-27.3-109.1.4 REPEALED ยง 23-27.3-109.2 ACCEPTED ENGINEERING PRACTICE ยง 23-27.3-109.3 PROPOSING AMENDMENTS TO RULES AND REGULATIONS ยง 23-27.3-110.0 MODIFICATIONS AND VARIANCES ยง 23-27.3-111.0 NEW AND ALTERED BUILDING AND STRUCTURE – INSPECTIONS ยง 23-27.3-111.1 PRELIMINARY INSPECTION ยง 23-27.3-111.2 INSPECTION |
31 | ยง 23-27.3-111.3 MANUFACTURING BUILDINGS 23-27.3-111.3.1 PLANT INSPECTION ยง 23-27.3-111.3.2 INSTALLATION SITE INSPECTION ยง 23-27.3-111.4 EXISTING BUILDINGS ยง 23-27.3-111.4.1 PERIODIC INSPECTIONS ยง 23-27.3-111.4.2 REPLEALED ยง 23-27.3-111.5 FINAL INSPECTION 23-27.3-111.6 INSPECTION SERVICES ยง 23-27.3-111.7 COORDINATION OF INSPECTIONS ยง 23-27.3-112.0 RIGHT OF ENTRY ยง 23-27.3-112.1 OFFICIAL IDENTIFICATION CARD |
32 | ยง 23-27.3-112.2 MUNICIPAL COOPERATION ยง 23-27.3-113.0 APPLICATION FOR PERMIT ยง 23-27.3-113.1 WHEN PERMIT IS REQUIRED ยง 23-27.3-113.1.1 ISSUANCE OF PERMITS FOR SIDING ยง 23-27.3-113.2 FORM OF APPLICATION ยง 23-27.3-113.3 BY WHOM APPLICATION IS MADE ยง 23-27.3-113.3.1 APPLICATIONS FOR WORK REQUIRING LICENSED WORKERS ยง 23-27.3-113.3.2 APPLICATIONS FOR WORK REQUIRING REGISTERED WORKERS |
33 | ยง 23-27.3-113.4 DESCRIPTION OF WORK ยง 23-27.3-113.5 PLANS AND SPECIFICATIONS ยง 23-27.3-113.5.1 REPLEALED ยง 23-27.3-113.6 PLOT PLAN ยง 23-27.3-113.6.1 APPROVAL OF AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM ยง 23-27.3-113.7 ENGINEERING DETAILS ยง 23-27.3-113.8 AMENDMENTS TO APPLICATION ยง 23-27.3-113.9 TIME LIMITATION ON APPLICATION ยง 23-27.3-114.0 PERMITS ยง 23-27.3-114.1 ACTION ON APPLICATION |
34 | ยง 23-27.3-114.1.1 REPORTS TO ASSESSORS ยง 23-27.3-114.2 EXPIRATION OF PERMIT ยง 23-27.3-114.3 PREVIOUS APPROVALS |
35 | ยง 23-27.3-114.3.1 DRAWINGS AND SPECIFICATIONS ยง 23-27.3-114.4 BUILDING OFFICIAL TO SIGN PERMIT ยง 23-27.3-114.5 APPROVED PLANS ยง 23-27.3-114.6 REVOCATION OF PERMITS ยง 23-27.3-114.7 APPROVAL IN PART ยง 23-27.3-114.8 POSTING OF PERMIT ยง 23-27.3-114.9 NOTICE OF BUILDING START ยง 23-27.3-115.0 CONDITIONS OF PERMIT ยง 23-27.3-115.1 COMPLIANCE WITH CODE ยง 23-27.3-115.2 COMPLIANCE WITH PERMIT ยง 23-27.3-115.3 COMPLIANCE WITH PLOT PLAN ยง 23-27.3-115.4 CHANGE IN PLOT PLAN |
36 | ยง 23-27.3-115.5 DISMISSAL OF CONTRACTOR OR SUBCONTRACTOR ยง 23-27.3-116.0 MOVING, RAISING, SHORING, OR DEMOLITION OF BUILDINGS ยง 23-27.3-116.1 SERVICE CONNECTIONS ยง 23-27.3-116.2 BUILDINGS TO BE RODENT-ERADICATED PRIOR TO DEMOLITION ยง 23-27.3-116.3 DESCRIPTION AND INSPECTION OF BUILDINGS – TRAVEL ROUTE ยง 23-27.3-116.4 AGREEMENT CONDITION TO MOVING ยง 23-27.3-116.5 PUBLIC UTILITIES, WIRES, POLES, TREES, AND SHRUBS ยง 23-27.3-116.6 MOVING TO BE CONTINUOUS ยง 23-27.3-116.7 WATCHPERSON AND LIGHTS DURING MOVING |
37 | ยง 23-27.3-116.8 BONDS AND LIABILITY INSURANCE ยง 23-27.3-116.9 SHORING ยง 23-27.3-117.0 REMOVAL OF STRUCTURES ยง 23-27.3-117.1 LOT REGULATION ยง 23-27.3-118.0 FEES ยง 23-27.3-118.1 SPECIAL FEES ยง 23-27.3-118.2 RAMPS FOR DISABLED PERSONS ยง 23-27.3-119.0 FEE COMPUTATION ยง 23-27.3-120.0 CERTIFICATE OF USE AND OCCUPANCY ยง 23-27.3-120.1 NEW BUILDINGS ยง 23-27.3-120.2 BUILDINGS HEREAFTER ALTERED |
38 | ยง 23-27.3-120.3 EXISTING BUILDINGS ยง 23-27.3-120.4 CHANGES IN USE AND OCCUPANCY ยง 23-27.3-120.5 TEMPORARY OCCUPANCY ยง 23-27.3-120.6 CONTENTS OF CERTIFICATE ยง 23-27.3-121.0 POSTING BUILDINGS ยง 23-27.3-121.1 POSTED USE AND OCCUPANCY |
39 | ยง 23-27.3-121.2 POSTED OCCUPANCY LOAD ยง 23-27.3-121.3 FURNISHING OF POSTED SIGNS ยง 23-27.3-121.4 PERIODIC INSPECTION FOR POSTING ยง 23-27.3-122.0 VIOLATIONS ยง 23-27.3-122.1 NOTICE OF VIOLATION ยง 23-27.3-122.1.2 NOTICE OR ORDERS – SERVICE AND CONTENT 23-27.3-122.2 PROSECUTION OF VIOLATION ยง 23-27.3-122.3 PENALTIES ยง 23-27.3-122.4 ABATEMENT OF VIOLATIONS |
40 | ยง 23-27.3-123.0 STOP-WORK ORDER ยง 23-27.3-123.1 NOTICE TO OWNER ยง 23-27.3-123.1.1 POSTING OF ORDER ยง 23-27.3-123.2 UNLAWFUL CONTINUANCE ยง 23-27.3-124.0 UNSAFE STRUCTURES – GENERAL PROVISIONS ยง 23-27.3-124.1 UNSAFE CONDITIONS ยง 23-27.3-124.2 NOTICE OF UNSAFE CONDITION |
41 | ยง 23-27.3-124.3 APPEALS ยง 23-27.3-124.4 RESTORATION OF UNSAFE BUILDINGS ยง 23-27.3-124.4.1 COMPLIANCE ยง 23-27.3-124.5 DISREGARD OF UNSAFE NOTICE ยง 23-27.3-124.6 BOARDING |
42 | ยง 23-27.3-124.6.1 DISCONNECTION OF UTILITIES ยง 23-27.3-124.6.2 REMOVAL OF DEBRIS AND RUBBISH ยง 23-27.3-125.0 ENERGENCY MEASURES ยง 23-27.3-125.1 VACATING BUILDINGS ยง 23-27.3-125.2 TEMPORARY SAFEGUARDS ยง 23-27.3-125.3 CLOSING STREETS ยง 23-27.3-125.4 EMERGENCY REPAIRS ยง 23-27.3-125.5 HAZARDOUS BUILDINGS ยง 23-27.3-125.6 COSTS OF EMERGENCY REPAIRS ยง 23-27.3-125.7 LIEN FOR EMERGENCY REPAIRS ยง 23-27.3-126.0 APPEALS FROM ORDERS IN REGARD TO UNSAFE BUILDINGS |
43 | ยง 23-27.3-126.1 APPLICATION FOR REVIEW ยง 23-27.3-126.2 PROCEDURE ยง 23-27.3-126.3 FINDINGS ยง 23-27.3-127.0 STATE AND LOCAL BOARDS OF APPEALS ยง 23-27.3-127.1 COMMITTEE TO SERVE AS A BOARD OF STANDARDS AND APPEALS |
44 | ยง 23-27.3-127.1.1 STAY OF PROCEEDINGS ยง 23-27.3-127.1.2 GRANTING VARIANCE ยง 23-27.3-127.1.3 ADDITIONAL POWERS ยง 23-27.3-127.1.4 PROCEDURES – RECORD OF VARIANCES |
45 | ยง 23-27.3-127.2 LOCAL BOARD OF APPEALS ยง 23-27.3-127.2.1 MEMBERSHIP AND LOCAL BOARD ยง 23-27.3-127.2.2 STAY OF PROCEEDINGS ยง 23-27.3-127.2.3 GRANTING VARIANCE ยง 23-27.3-127.2.4 ADDITIONAL POWERS ยง 23-27.3-127.2.5 PROCEDURES |
46 | ยง 23-27.3-127.2.6 LOCAL DECISION TRANSMITTED TO STATE BOARD ยง 23-27.3-128.0 DESIGN AND CONSTRUCTION PROCEDURES ยง 23-27.3-128.1 SCOPE ยง 23-27.3-128.1.1 OWNER’S RESPONSIBILITIES ยง 23-27.3-128.1.2 โ 23-27.3-128.1.5 REPEALED ยง 23-27.3-128.2 REPEALED ยง 23-27.3-128.2.1 DRAWINGS AND SPECIFICATIONS ยง 23-27.3-128.2.2 RESPONSIBILITIES |
47 | ยง 23-27.3-128.2.3 REPORTING ยง 23-27.3-128.3 CONSTRUCTION CONTRACTOR RESPONSIBILITIES ยง 23-27.3-128.4 TESTING REQUIRED ยง 23-27.3-128.5 BUILDING OFFICIAL’S RESPONSIBILITIES ยง 23-27.3-128.5.1 WAIVER OF PLAN EXAMINATION ยง 23-27.3-128.5.2 WAIVER OF DETAILED FIELD INSPECTION |
48 | ยง 23-27.3-128.5.3 INSPECTION WAIVER – UTILIZATION ยง 23-27.3-128.5.4 BUILDING PERMIT ISSUANCE OR REQUIREMENTS ยง 23-27.3-128.6 SPECIAL TECHNICAL SERVICES ยง 23-27.3-128.7 FEES AND COSTS ยง 23-27.3-129.0, 23-27.3-129.1 REPEALED ยง 23-27.3-129.2 REPEALED ยง 23-27.3-129.3 REPEALED ยง 23-27.3-200.0 SAVINGS CLAUSE ยง 23-27.3-300.0 PUBLICATION OF CODE ยง 23-27.3-400.0 SEVERABILITY |
49 | ยง 23-27.3-401.0 SALE OF PRESSURE VESSEL ยง 23-27.3-500.0 EFFECTIVE DATE OF CODE ยง 23-27.3-501.0, 23-27.3-502.0 REPEALED ยง 23-27.3-503.0, 23-27.3-504.0 [OBSOLETE] ยง 23-27.3-505.0 REPEALED ยง 23-27.3-506.0 [OBSOLETE] ยง 23-27.3-600.0 FRESH WATER WETLANDS ยง 23-27.3-700.0 REPEALED ยง 23-27.3-701.0 BABY CHANGING TABLES |
50 | CHAPTER 1 ADMINISTRATION PART 1โSCOPE AND APPLICATION SECTION 101 (IFGC) GENERAL |
51 | SECTION 102 (IFGC) APPLICABILITY |
52 | PART 2โADMINISTRATION AND ENFORCEMENT SECTION 103 (IFGC) DEPARTMENT OF INSPECTION SECTION 104 (IFGC) DUTIES AND POWERS OF THE CODE OFFICIAL SECTION 105 (IFGC) APPROVAL SECTION 106 (IFGC) PERMITS SECTION 107 (IFGC) INSPECTIONS AND TESTING |
53 | SECTION 108 (IFGC) VIOLATIONS SECTION 109 (IFGC) MEANS OF APPEAL |
54 | SECTION 110 (IFGC) TEMPORARY EQUIPMENT, SYSTEMS AND USES |
56 | CHAPTER 2 DEFINITIONS SECTION 201 (IFGC) GENERAL SECTION 202 (IFGC) GENERAL DEFINITIONS |
66 | CHAPTER 3 GENERAL REGULATIONS SECTION 301 (IFGC) GENERAL |
67 | SECTION 302 (IFGC) STRUCTURAL SAFETY SECTION 303 (IFGC) APPLIANCE LOCATION |
68 | SECTION 304 (IFGS) COMBUSTION, VENTILATION AND DILUTION AIR EQUATION 3-1 EQUATION 3-2 |
69 | FIGURE 304.5.3 ALL AIR FROM INSIDE THE BUILDING (see Section 304.5.3) FIGURE 304.6.1(1) ALL AIR FROM OUTDOORSโINLET AIR FROM VENTILATED CRAWL SPACE AND OUTLET AIR TO VENTILATED ATTIC (see Section 304.6.1) |
70 | FIGURE 304.6.1(2) ALL AIR FROM OUTDOORS THROUGH VENTILATED ATTIC (see Section 304.6.1) FIGURE 304.6.1(3) ALL AIR FROM OUTDOORS (see Section 304.6.1) FIGURE 304.6.2 SINGLE COMBUSTION AIR OPENING, ALL AIR FROM THE OUTDOORS (see Section 304.6.2) |
71 | SECTION 305 (IFGC) INSTALLATION |
72 | SECTION 306 (IFGC) ACCESS AND SERVICE SPACE |
74 | SECTION 307 (IFGC) CONDENSATE DISPOSAL SECTION 308 (IFGS) CLEARANCE REDUCTION |
75 | TABLE 308.2 a through k REDUCTION OF CLEARANCES WITH SPECIFIED FORMS OF PROTECTION |
76 | FIGURE 308.2(1) EXTENT OF PROTECTION NECESSARY TO REDUCE CLEARANCES FROM APPLIANCE OR VENT CONNECTIONS FIGURE 308.2(2) WALL PROTECTOR CLEARANCE REDUCTION SYSTEM FIGURE 308.2(3) MASONRY CLEARANCE REDUCTION SYSTEM |
77 | SECTION 309 (IFGC) ELECTRICAL SECTION 310 (IFGS) ELECTRICAL BONDING SECTION 311 TEMPERATURE CONTROL |
78 | CHAPTER 4 GAS PIPING INSTALLATIONS SECTION 401 (IFGC) GENERAL SECTION 402 (IFGS) PIPE SIZING |
79 | EQUATION 4-1 EQUATION 4-2 TABLE 402.4 Cr AND Y VALUES FOR NATURAL GAS AND UNDILUTED PROPANE AT STANDARD CONDITIONS |
80 | TABLE 402.4(1) SCHEDULE 40 METALLIC PIPE |
81 | TABLE 402.4(2) SCHEDULE 40 METALLIC PIPE |
82 | TABLE 402.4(3) SCHEDULE 40 METALLIC PIPE |
83 | TABLE 402.4(4) SCHEDULE 40 METALLIC PIPE |
84 | TABLE 402.4(5) SCHEDULE 40 METALLIC PIPE |
85 | TABLE 402.4(6) SCHEDULE 40 METALLIC PIPE |
86 | TABLE 402.4(7) SCHEDULE 40 METALLIC PIPE |
87 | TABLE 402.4(8) SEMIRIGID COPPER TUBING |
88 | TABLE 402.4(9) SEMIRIGID COPPER TUBING |
89 | TABLE 402.4(10) SEMIRIGID COPPER TUBING |
90 | TABLE 402.4(11) SEMIRIGID COPPER TUBING |
91 | TABLE 402.4(12) SEMIRIGID COPPER TUBING |
92 | TABLE 402.4(13) SEMIRIGID COPPER TUBING |
93 | TABLE 402.4(14) SEMIRIGID COPPER TUBING |
94 | TABLE 402.4(15) CORRUGATED STAINLESS STEEL TUBING (CSST) |
95 | TABLE 402.4(16) CORRUGATED STAINLESS STEEL TUBING (CSST) |
96 | TABLE 402.4(17) CORRUGATED STAINLESS STEEL TUBING (CSST) |
97 | TABLE 402.4(18) CORRUGATED STAINLESS STEEL TUBING (CSST) |
98 | TABLE 402.4(19) CORRUGATED STAINLESS STEEL TUBING (CSST) |
99 | TABLE 402.4(20) POLYETHYLENE PLASTIC PIPE |
100 | TABLE 402.4(21) POLYETHYLENE PLASTIC PIPE |
101 | TABLE 402.4(22) POLYETHYLENE PLASTIC PIPE |
102 | TABLE 402.4(23) POLYETHYLENE PLASTIC TUBING TABLE 402.4(24) POLYETHYLENE PLASTIC TUBING |
103 | TABLE 402.4(25) SCHEDULE 40 METALLIC PIPE |
104 | TABLE 402.4(26) SCHEDULE 40 METALLIC PIPE |
105 | TABLE 402.4(27) SCHEDULE 40 METALLIC PIPE |
106 | TABLE 402.4(28) SCHEDULE 40 METALLIC PIPE |
107 | TABLE 402.4(29) SEMIRIGID COPPER TUBING |
108 | TABLE 402.4(30) SEMIRIGID COPPER TUBING |
109 | TABLE 402.4(31) SEMIRIGID COPPER TUBING |
110 | TABLE 402.4(32) CORRUGATED STAINLESS STEEL TUBING (CSST) |
111 | TABLE 402.4(33) CORRUGATED STAINLESS STEEL TUBING (CSST) |
112 | TABLE 402.4(34) CORRUGATED STAINLESS STEEL TUBING (CSST) |
113 | TABLE 402.4(35) POLYETHYLENE PLASTIC PIPE |
114 | TABLE 402.4(36) POLYETHYLENE PLASTIC PIPE |
115 | TABLE 402.4(37) POLYETHYLENE PLASTIC TUBING |
116 | SECTION 403 (IFGS) PIPING MATERIALS |
117 | TABLE 403.9.2 SPECIFICATIONS FOR THREADING METALLIC PIPE |
118 | SECTION 404 (IFGC) PIPING SYSTEM INSTALLATION |
120 | SECTION 405 (IFGS) PIPING BENDS AND CHANGES IN DIRECTION |
121 | SECTION 406 (IFGS) INSPECTION, TESTING AND PURGING |
122 | TABLE 406.7.1.1 SIZE AND LENGTH OF PIPING |
123 | SECTION 407 (IFGC) PIPING SUPPORT SECTION 408 (IFGC) DRIPS AND SLOPED PIPING FIGURE 408.4 METHOD OF INSTALLING A TEE FITTING SEDIMENT TRAP SECTION 409 (IFGC) SHUTOFF VALVES |
124 | TABLE 409.1.1 MANUAL GAS VALVE STANDARDS SECTION 410 (IFGC) FLOW CONTROLS |
125 | SECTION 411 (IFGC) APPLIANCE AND MANUFACTURED HOME CONNECTIONS |
126 | SECTION 412 (IFGC) LIQUEFIED PETROLEUM GAS MOTOR VEHICLE FUEL-DISPENSING FACILITIES |
127 | SECTION 413 (IFGC) COMPRESSED NATURAL GAS MOTOR VEHICLE FUEL-DISPENSING FACILITIES |
129 | [F] TABLE 413.9.2.3 SEPARATION DISTANCE FOR ATMOSPHERIC VENTING OF CNG SECTION 414 (IFGC) SUPPLEMENTAL AND STANDBY GAS SUPPLY SECTION 415 (IFGS) PIPING SUPPORT INTERVALS TABLE 415.1 SUPPORT OF PIPING SECTION 416 (IFGS) OVERPRESSURE PROTECTION DEVICES |
132 | CHAPTER 5 CHIMNEYS AND VENTS SECTION 501 (IFGC) GENERAL |
133 | SECTION 502 (IFGC) VENTS |
134 | SECTION 503 (IFGS) VENTING OF APPLIANCES |
135 | TABLE 503.4 TYPE OF VENTING SYSTEM TO BE USED |
137 | FIGURE 503.6.4 TERMINATION LOCATIONS FOR GAS VENTS WITH LISTED CAPS 12 INCHES OR LESS IN SIZE AT LEAST 8 FEET FROM A VERTICAL WALL |
140 | TABLE 503.10.2.4 MINIMUM THICKNESS FOR GALVANIZED STEEL VENT CONNECTORS FOR LOW-HEAT APPLIANCES TABLE 503.10.2.5 MINIMUM THICKNESS FOR STEEL VENT CONNECTORS FOR MEDIUM-HEAT APPLIANCES |
141 | TABLE 503.10.5a CLEARANCES FOR CONNECTORS |
143 | SECTION 504 (IFGS) SIZING OF CATEGORY I APPLIANCE VENTING SYSTEMS |
145 | TABLE 504.3.2 MAXIMUM VENT CONNECTOR LENGTH |
147 | SECTION 505 (IFGC) DIRECT-VENT, INTEGRAL VENT, MECHANICAL VENT AND VENTILATION/EXHAUST HOOD VENTING SECTION 506 (IFGC) FACTORY-BUILT CHIMNEYS |
148 | TABLE 504.2(1) TYPE B DOUBLE-WALL GAS VENT |
149 | TABLE 504.2(1)โcontinued TYPE B DOUBLE-WALL GAS VENT |
150 | TABLE 504.2(1)โcontinued TYPE B DOUBLE-WALL GAS VENT |
151 | TABLE 504.2(1)โcontinued TYPE B DOUBLE-WALL GAS VENT |
152 | TABLE 504.2(2) TYPE B DOUBLE-WALL GAS VENT |
153 | TABLE 504.2(2)-continued TYPE B DOUBLE-WALL GAS VENT |
154 | TABLE 504.2(3) MASONRY CHIMNEY |
155 | TABLE 504.2(3)โcontinued MASONRY CHIMNEY |
156 | TABLE 504.2(4) MASONRY CHIMNEY |
157 | TABLE 504.2(4)โcontinued MASONRY CHIMNEY |
158 | TABLE 504.2(5) SINGLE-WALL METAL PIPE OR TYPE B ASBESTOS CEMENT VENT |
159 | TABLE 504.2(6) EXTERIOR MASONRY CHIMNEY |
160 | TABLE 504.3(1) TYPE B DOUBLE-WALL VENT |
161 | TABLE 504.3(1)-continued TYPE B DOUBLE-WALL VENT |
162 | TABLE 504.3(2) TYPE B DOUBLE-WALL VENT |
163 | TABLE 504.3(3) MASONRY CHIMNEY |
164 | TABLE 504.3(4) MASONRY CHIMNEY |
165 | TABLE 504.3(5) SINGLE-WALL METAL PIPE OR TYPE ASBESTOS CEMENT VENT |
166 | TABLE 504.3(6a) EXTERIOR MASONRY CHIMNEY TABLE 504.3(6b) EXTERIOR MASONRY CHIMNEY TABLE 504.3(6b) EXTERIOR MASONRY CHIMNEY-continued |
167 | TABLE 504.3(7a) EXTERIOR MASONRY CHIMNEY TABLE 504.3(7b) EXTERIOR MASONRY CHIMNEY TABLE 504.3(7b) EXTERIOR MASONRY CHIMNEYโcontinued |
168 | CHAPTER 6 SPECIFIC APPLIANCES SECTION 601 (IFGC) GENERAL SECTION 602 (IFGC) DECORATIVE APPLIANCES FOR INSTALLATION IN FIREPLACES SECTION 603 (IFGC) LOG LIGHTERS SECTION 604 (IFGC) VENTED GAS FIREPLACES (DECORATIVE APPLIANCES) SECTION 605 (IFGC) VENTED GAS FIREPLACE HEATERS SECTION 606 (IFGC) INCINERATORS AND CREMATORIES SECTION 607 (IFGC) COMMERCIAL-INDUSTRIAL INCINERATORS SECTION 608 (IFGC) VENTED WALL FURNACES |
169 | SECTION 609 (IFGC) FLOOR FURNACES SECTION 610 (IFGC) DUCT FURNACES SECTION 611 (IFGC) NONRECIRCULATING DIRECT-FIRED INDUSTRIAL AIR HEATERS |
170 | SECTION 612 (IFGC) RECIRCULATING DIRECT-FIRED INDUSTRIAL AIR HEATERS SECTION 613 (IFGC) CLOTHES DRYERS SECTION 614 (IFGC) CLOTHES DRYER EXHAUST |
171 | [M] TABLE 614.8.4.1 DRYER EXHAUST DUCT FITTING EQUIVALENT LENGTH |
172 | SECTION 615 (IFGC) SAUNA HEATERS |
173 | SECTION 616 (IFGC) ENGINE AND GAS TURBINE-POWERED EQUIPMENT SECTION 617 (IFGC) POOL AND SPA HEATERS SECTION 618 (IFGC) FORCED-AIR WARM-AIR FURNACES |
174 | SECTION 619 (IFGC) CONVERSION BURNERS SECTION 620 (IFGC) UNIT HEATERS SECTION 621 (IFGC) UNVENTED ROOM HEATERS |
175 | SECTION 622 (IFGC) VENTED ROOM HEATERS SECTION 623 (IFGC) COOKING APPLIANCES SECTION 624 (IFGC) WATER HEATERS SECTION 625 (IFGC) REFRIGERATORS SECTION 626 (IFGC) GAS-FIRED TOILETS |
176 | SECTION 627 (IFGC) AIR-CONDITIONING APPLIANCES SECTION 628 (IFGC) ILLUMINATING APPLIANCES |
177 | SECTION 629 (IFGC) SMALL CERAMIC KILNS SECTION 630 (IFGC) INFRARED RADIANT HEATERS SECTION 631 (IFGC) BOILERS SECTION 632 (IFGC) EQUIPMENT INSTALLED IN EXISTING UNLISTED BOILERS SECTION 633 (IFGC) STATIONARY FUEL-CELL POWER SYSTEMS TABLE 634.1 FREE OPENING AREA OF CHIMNEY DAMPER FOR VENTING FLUE GASES FROM UNLISTED DECORATIVE APPLIANCES FOR INSTALLATION IN VENTED FIREPLACES |
178 | SECTION 634 (IFGS) CHIMNEY DAMPER OPENING AREA SECTION 635 (IFGC) GASEOUS HYDROGEN SYSTEMS SECTION 636 (IFGC) OUTDOOR DECORATIVE APPLIANCES |
180 | CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 (IFGC) GENERAL SECTION 702 (IFGC) GENERAL DEFINITIONS SECTION 703 (IFGC) GENERAL REQUIREMENTS |
181 | SECTION 704 (IFGC) PIPING, USE AND HANDLING |
182 | SECTION 705 (IFGC) TESTING OF HYDROGEN PIPING SYSTEMS |
183 | SECTION 706 (IFGC) LOCATION OF GASEOUS HYDROGEN SYSTEMS |
184 | SECTION 707 (IFGC) OPERATION AND MAINTENANCE OF GASEOUS HYDROGEN SYSTEMS SECTION 708 (IFGC) DESIGN OF LIQUEFIED HYDROGEN SYSTEMS ASSOCIATED WITH HYDROGEN VAPORIZATION OPERATIONS |
186 | IFGC/IFGS CHAPTER 8 REFERENCED STANDARDS ANSI |
187 | ASME ASTM CGA |
188 | CSA DOTn ICC MSS |
189 | NFPA UL |
190 | APPENDIX A (IFGS) SIZING AND CAPACITIES OF GAS PIPING A.1 GENERAL PIPING CONSIDERATIONS A.2 DESCRIPTION OF TABLES |
191 | TABLE A.2.2 EQUIVALENT LENGTHS OF PIPE FITTINGS AND VALVES |
192 | TABLE A.2.2โcontinued EQUIVALENT LENGTHS OF PIPE FITTINGS AND VALVES |
193 | TABLE A.2.4 MULTIPLIERS TO BE USED WITH TABLES 402.4(1) THROUGH 402.4(22) WHERE THE SPECIFIC GRAVITY OF THE GAS IS OTHER THAN 0.60 A.3 USE OF CAPACITY TABLES |
195 | TABLE A.3.4 THOUSANDS OF BTU/H (MBH) OF NATURAL GAS PER 100 FEET OF PIPE AT VARIOUS PRESSURE DROPS AND PIPE DIAMETERS A.4 USE OF SIZING EQUATIONS |
196 | A.5 PIPE AND TUBE DIAMETERS TABLE A.5.1 SCHEDULE 40 STEEL PIPE STANDARD SIZES TABLE A.5.2 COPPER TUBE STANDARD SIZES A.6 EXAMPLES OF PIPING SYSTEM DESIGN AND SIZING |
197 | FIGURE A.6.1 PIPING PLAN SHOWING A STEEL PIPING SYSTEM FIGURE A.6.2 PIPING PLAN SHOWING A CSST SYSTEM |
198 | FIGURE A.6.3 PIPING PLAN SHOWING A COPPER TUBING SYSTEM |
199 | FIGURE A.6.4 PIPING PLAN SHOWING A MODIFICATION TO EXISTING PIPING SYSTEM |
202 | APPENDIX B (IFGS) SIZING OF VENTING SYSTEMS SERVING APPLIANCES EQUIPPED WITH DRAFT HOODS, CATEGORY I APPLIANCES AND APPLIANCES LISTED FOR USE WITH TYPE B VENTS EXAMPLES USING SINGLE APPLIANCE VENTING TABLES FIGURE B-1 TYPE B DOUBLE-WALL VENT SYSTEM SERVING A SINGLE APPLIANCE WITH A TYPE B DOUBLE-WALL VENT FIGURE B-2 TYPE B DOUBLE-WALL VENT SYSTEM SERVING A SINGLE APPLIANCE WITH A SINGLE-WALL METAL VENT CONNECTOR |
203 | FIGURE B-3 VENT SYSTEM SERVING A SINGLE APPLIANCE WITH A MASONRY CHIMNEY OF TYPE B DOUBLE-WALL VENT CONNECTOR FIGURE B-4 VENT SYSTEM SERVING A SINGLE APPLIANCE USING A MASONRY CHIMNEY AND A SINGLE-WALL METAL VENT CONNECTOR FIGURE B-5 ASBESTOS CEMENT TYPE B OR SINGLE-WALL METAL VENT SYSTEM SERVING A SINGLE DRAFT-HOOD-EQUIPPED APPLIANCE FIGURE B-6 VENT SYSTEM SERVING TWO OR MORE APPLIANCES WITH TYPE B DOUBLE-WALL VENT AND TYPE B DOUBLE-WALL VENT CONNECTOR |
204 | FIGURE B-7 VENT SYSTEM SERVING TWO OR MORE APPLIANCES WITH TYPE B DOUBLE-WALL VENT AND SINGLE-WALL METAL VENT CONNECTORS FIGURE B-8 MASONRY CHIMNEY SERVING TWO OR MORE APPLIANCES WITH TYPE B DOUBLE-WALL VENT CONNECTOR FIGURE B-9 MASONRY CHIMNEY SERVING TWO OR MORE APPLIANCES WITH SINGLE-WALL METAL VENT CONNECTORS FIGURE B-10 ASBESTOS CEMENT TYPE B OR SINGLE-WALL METAL VENT SYSTEM SERVING TWO OR MORE DRAFT-HOOD-EQUIPPED APPLIANCES |
205 | FIGURE B-11 USE OF MANIFOLD COMMON VENT CONNECTOR FIGURE B-12 USE OF OFFSET COMMON VENT FIGURE B-13 MULTISTORY GAS VENT DESIGN PROCEDURE FOR EACH SEGMENT OF SYSTEM FIGURE B-14 MULTISTORY VENT SYSTEMS |
206 | FIGURE B-15 (EXAMPLE 1) SINGLE DRAFT-HOOD-EQUIPPED APPLIANCE FIGURE B-16 (EXAMPLE 2) SINGLE FAN-ASSISTED APPLIANCE |
207 | EXAMPLES USING COMMON VENTING TABLES FIGURE B-17 (EXAMPLE 4) COMMON VENTING TWO DRAFT-HOOD-EQUIPPED APPLIANCES FIGURE B-18 (EXAMPLE 5A) COMMON VENTING A DRAFT HOOD WITH A FAN-ASSISTED FURNACE INTO A TYPE B DOUBLE-WALL COMMON VENT |
209 | TABLE B-1 MASONRY CHIMNEY LINER DIMENSIONS WITH CIRCULAR EQUIVALENTSa |
210 | FIGURE B-19 |
212 | APPENDIX C (IFGS) EXIT TERMINALS OF MECHANICAL DRAFT AND DIRECT-VENT VENTING SYSTEMS APPENDIX C EXIT TERMINALS OF MECHANICAL DRAFT AND DIRECT-VENT VENTING SYSTEMS |
214 | APPENDIX D (IFGS) RECOMMENDED PROCEDURE FOR SAFETY INSPECTION OF AN EXISTING APPLIANCE INSTALLATION D.1 GENERAL D.2 OCCUPANT AND INSPECTOR SAFETY |
215 | D.3 GAS PIPING AND CONNECTION INSPECTIONS D.4 INSPECTIONS TO BE PERFORMED WITH THE APPLIANCE NOT OPERATING |
216 | D.5 INSPECTIONS TO BE PERFORMED WITH THE APPLIANCE OPERATING |
217 | D.6 APPLIANCE-SPECIFIC INSPECTIONS |
219 | TABLE D.6 CO THRESHOLDS |
220 | INDEX |
224 | ICC EVALUATION SERVICE |
225 | ICC LEARNING CENTER |
226 | ICC ASSESSMENT CENTER |
227 | ICC MEMBERSHIP |