Shopping Cart

No products in the cart.

VT CBES 2020

$34.45

Vermont Commercial Building Energy Standards (CBES) effective September 1, 2020

Published By Publication Date Number of Pages
VT 2020
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

None

PDF Catalog

PDF Pages PDF Title
7 PREFACE
Introduction
Development
Background
Update Process
8 EFFECTIVE USE OF THE 2020 VERMONT COMMERCIAL BUILDING ENERGY STANDARDS
Arrangement and Format of the 2020 CBES
Italicized Terms
10 Marginal Markings
Abbreviations and Notations
23 – add – C302.2 Climatic data0F .
24 TABLE C303.1.3(1) DEFAULT GLAZED WINDOW, GLASS DOOR AND SKYLIGHT U-FACTORS
25 TABLE 4.2.1.1 Building Performance Factor (BPF)
30 SECTION C402 BUILDING ENVELOPE REQUIREMENTS
31 TABLE C402.1(1)
33 TABLE C402.1(2) BUILDING ENVELOPE REQUIREMENTS—METAL BUILDING ASSEMBLY DESCRIPTIONS
34 TABLE C402.1(3) ASSEMBLY U-FACTORS FOR METAL BUILDING ROOFS
35 – add – TABLE C402.1(4) ASSEMBLY U-FACTORS FOR ATTIC ROOFS WITH WOOD JOISTS
TABLE C402.1(4) ASSEMBLY U-FACTORS FOR ATTIC ROOFS WITH WOOD JOISTS
36 TABLE C402.1(5) ASSEMBLY U-FACTORS FOR METAL BUILDING WALLS
37 TABLE C402.1(6) ASSEMBLY U-FACTORS FOR METAL-FRAMED WALLS
38 – add – TABLE C402.1(7) ASSEMBLY U-FACTORS FOR WOOD-FRAMED WALLS
TABLE C402.1(7) ASSEMBLY U-FACTORS FOR WOOD-FRAMED WALLS
42 TABLE C402.3 BUILDING ENVELOPE FENESTRATION MAXIMUM U-FACTOR AND SHGC REQUIREMENTS
– delete – TABLE C402.4 BUILDING ENVELOPE FENESTRATION MAXIMUM U-FACTOR AND SHGC REQUIREMENTS
46 – add – C402.4.1.2 Continuous Air Barrier Commissioning
– add – C402.4.1.2.1 Building Envelope Commissioning Guideline
47 TABLE C402.4.1.2.1
BUILDING ENVELOPE COMMISIONING CHECKLIST
53 SECTION C403 BUILDING MECHANICAL SYSTEMS
55 – delete and replace – TABLE C403.3.2(1) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
TABLE C403.3.2(1) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
56 TABLE C403.3.2(1)—continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
57 – delete and replace – TABLE C403.3.2(2) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
TABLE C403.3.2(2) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
58 TABLE C403.3.2(2)—continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
59 – delete and replace – TABLE C403.3.2(7) WATER CHILLING PACKAGES – EFFICIENCY REQUIREMENTS
TABLE C403.3.2(7) WATER CHILLING PACKAGES – EFFICIENCY REQUIREMENTSa, b, d
60 TABLE C403.3.2(10) MINIMUM EFFICIENCY ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR CONDITIONERS
61 – add – TABLE C403.3.2(11) MINIMUM EFFICIENCY ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR-TO-AIR AND APPLIED HEAT PUMPS
TABLE C403.3.2(11) MINIMUM EFFICIENCY ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR-TO-AIR AND APPLIED HEAT PUMPS
62 – modify – TABLE C403.3.2(10) HEAT TRANSFER EQUIPMENT to TABLE C403.3.2(12) HEAT TRANSFER EQUIPMENT
65 – delete – TABLE C403.4.4 VARIABLE SPEED DRIVE (VSD) REQUIREMENTS FOR DEMAND-CONTROLLED PUMPS
66 MINIMUM CHILLED-WATER SYSTEM COOLING CAPACITY FOR DETERMINING ECONOMIZER COOLING REQUIREMENTS
67 – delete and replace – TABLE C403.5.1 DX COOLING STAGE REQUIREMENTS FOR MODULATING AIRFLOW UNITSTABLE C403.5.1 DX COOLING STAGE REQUIREMENTS FOR MODULATING AIRFLOW UNITS
– delete and replace – TABLE C403.5.3.3 HIGH-LIMIT SHUTOFF CONTROL SETTING FOR AIR ECONOMIZERSbTABLE C403.5.3.3 HIGH-LIMIT SHUTOFF CONTROL SETTING FOR AIR ECONOMIZERSb
75 – delete and replace – TABLE C403.8.5.1 COOLING SYSTEMS
TABLE C403.8.5.1 COOLING SYSTEMS
80 – delete and replace – TABLE C403.11.3 MINIMUM PIPE INSULATION THICKNESS (in inches)
TABLE C403.11.3 MINIMUM PIPE INSULATION THICKNESS (in inches)a, c
82 TABLE C404.2 MINIMUM PERFORMANCE OF WATER-HEATING EQUIPMENT
83 TABLE C404.2—continued MINIMUM PERFORMANCE OF WATER-HEATING EQUIPMENT
86 – delete and replace – C405.2.1.4 Occupant sensor control function for egress illumination.
89 – add – C405.2.3.1.1 Dimming.
91 FIGURE C405.2.3.3(4)
DAYLIGHT ZONE ADJACENT TO CLERESTORY FENESTRATION IN A WALL
94 TABLE C405.3.2(1) INTERIOR LIGHTING POWER ALLOWANCES: BUILDING AREA METHOD
95 – delete and replace – TABLE C405.3.2(2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
TABLE C405.3.2(2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
96 TABLE C405.3.2(2)—continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
97 TABLE C405.3.2(2)—continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
98 TABLE C405.3.2(2)—continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
99 TABLE C405.4.2(1) EXTERIOR LIGHTING ZONES
100 TABLE C405.4.2(2) INDIVIDUAL LIGHTING POWER ALLOWANCES FOR BUILDING EXTERIORS
101 – delete – TABLE C405.4.2(3) INDIVIDUAL LIGHTING POWER ALLOWANCES FOR BUILDING EXTERIORS
– add – C405.10 Electric Vehicle Charging Stations
102 TABLE C405.11 ELECTRIC VEHICLE CHARGING PARKING SPACES
111 – modify – FIGURE C408.2.4 COMMISSIONING COMPLIANCE CHECKLIST to FIGURE C407.2.4 COMMISSIONING COMPLIANCE CHECKLIST
117 APPENDIX CA SOLAR-READY ZONE—COMMERCIAL
SECTION CA103 SOLAR-READY ZONE
VT CBES 2020
$34.45