WRC volume 38 No. 08:1983
$27.95
Progress Reports Volume 38 No. 08
Published By | Publication Date | Number of Pages |
WRC | 1983 | 106 |
Contents
– Executive Committee & Attachments, January 26, 1983
– Steering Committee on Piping Systems, January 24, 1983
– Technical Committee on Piping Systems, January 21-22, 1983
– Materials Division, January 26, 1983
– Subcommittee on Pressure Vessel Steels, January 25, 1983
– Subcommittee on Failure Modes in Pressure Vessel Materials, January 24, 1983
– Subcommittee on Nondestructive Examination of Pressure Components, January 25, 1983
– Subcommittee on Hydrogen Effects, January 25, 1983
– Design Division, January 26, 1983
– Subcommittee on Dynamic Analysis of Pressure Vessel Components, January 25, 1983
– Task Group on Dynamic Stress Criteria, January 25, 1983
– Subcommittee on Elevated Temperature Design, January 26, 1983
– Task Group Long-Range Planning, January 25, 1983
– Joint Task Group on Elevated Temperature Behavior of Bolted Flanges, January 24, 1983
– Task Group on Pipe Reactions on Pumps, January 24, 1983
– Task Group on Piping System Interaction Studies Tasks #1 & #3, January 25, 1983
– Subcommittee on Shells & Ligaments, January 25, 1983
– Subcommittee on Bolted Flanged Components, January 25, 1983
– Task Group on Gasket Testing, January 25, 1983
– Subcommittee on Reinforced Openings and External Loads, January 24, 1983
– Task Group on Laterals, January 24, 1983
– Fabrication Division, January 25, 1983
– Subcommittee on Significance of Weld Discontinuities, January 24, 1983
– Subcommittee on Thermal and Mechanical Effects, January 24, 1983
– Subcommittee on Thermal and Mechanical Effects, September 28, 1982
– Subcommittee on Cyclic and Creep Behavior of Components, January 24, 1983
– PVRC Survey to Investigate Influence of Pipe Reactions on Pumps
– Request for Damping Data
– PVRC Future Meeting Dates