Marriott – PDF Standards Store ?u= Fri, 25 Oct 2024 00:01:16 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.1 ?u=/wp-content/uploads/2024/11/cropped-icon-150x150.png Marriott – PDF Standards Store ?u= 32 32 Marriott RenaissanceHotels DesignStandards 2009 ?u=/product/publishers/marriott/marriott-renaissancehotels-designstandards-2009/ Sat, 19 Oct 2024 07:51:06 +0000 Marriott Renaissance Hotels & Resorts - Design Standards - Module GR: General Requirements, January 2009
Published By Publication Date Number of Pages
Marriott 2009 628
]]>
None

PDF Catalog

PDF Pages PDF Title
1 00a-RHR-Module 00 Table of Contents
3 00b-RHR-Module GR Summary
6 Design Standards
7 Project Application
9 Interpretations
Code & Regulation Compliance
10 Accessibility
11 Green & Sustainable Design
12 Criteria Summary & Facilities Program
13 Design Process
14 Expressive Design
15 Project Approval Timetable
16 Cost Schedule
17 Signage & Graphics
23 Building Materials, Products & Equipment
39 Furniture, Fixtures & Equipment (FF&E) – Public Spaces
50 Definitions, Acronyms & Abbreviations
52 01-RHR-Module 1 Site and Building Exterior
54 Site Design
56 Site Development
Site Utilities, Drainage and Soil Treatment
57 Traffic Circulation – Planning
58 Traffic Control – Regulation Signage
59 Paving & Hardscape
61 Main Site Entrance
62 Service / Delivery Entrance
63 Parking Areas
64 Parking Structures
68 Landscaping
Irrigation
69 Water Features, Fountains & Site Amenities
Site & Landscape Lighting
71 Building Structure
Building & Fire Codes
72 Building Exteriors & Features
74 Hotel Entrance – Porte Cochere
77 Exterior Signage
79 Exterior Building Lighting
80 System Coordination
82 02-RHR-Module 2 Public-Entry
DS-RHR-Jan2009-M02A-Public-Spaces
84 M.I. Greatroom
87 Hotel Entrance
93 Guest Services (AYS) Zone
99 Social Business Zone
101 Individual Zone
102 Public Telephones
103 Public Restrooms / Janitor Closet
105 Furniture, Fixtures & Equipment (FF&E)
106 System Features
107 DS-RHR-Jan2009-M02B-EBC
109 Overview
110 Entrance and Foyer (“A”)
111 Reception Station (“B”)
112 Guest Lounge (“C”)
113 Attendant Work Area (“E”)
Computer Work Stations (“F”)
Private Guest Office (“G”)
114 Private Meeting Rooms (Optional)
Conference Room (Optional)
Executive Boardroom (Optional) (“L”)
115 Phone Alcove or Booth (Optional)
Toilet Facilities
Interior Design – Finishes
116 System Features
117 03-RHR-Module 3 Food and Beverage (Front of House)
119 Overview
Program
120 Day / Night Bar
121 M.I. Greatroom Pantry
Three-Meal per Day Restaurant
126 Restaurants – Finishes
Restaurant – FF&E
128 Specialty / Leased Restaurant
130 Entertainment Lounge
131 Retail Coffee Kiosk
System Features
132 04-RHR-Module 4 Recreation
134 Overview
136 Circulation, Corridors & Service Areas
137 Fitness Center
139 Reception for Fitness Center
141 Exercise Areas
145 Swimming & Whirl Pools
152 Locker / Dressing, Drying / Grooming, Shower & Toilet Areas
154 Sauna
155 Steam Room
157 Steam Generator Room
158 Program:
Outdoor Facilities
Indoor Facility:
Other Facilities
System Features
159 05-RHR-Module 5 Retail
161 Overview
163 Lobby Shop
Branded Retail
167 Hotel [Foodservice] Retail Outlets
168 Additional Retail
General & Service Retail
170 System Features
171 06-RHR-Module 6 Function Spaces
173 Overview
176 Ballrooms – Design
185 Pre-function – Design
186 Meeting Rooms – Design
187 Boardrooms – Design
189 Function Space – Interior Design – General
190 Function Space FF&E – General
191 Catering Showroom
Public Support Spaces
192 BOH Function Service Spaces
Banquet Storage
193 Banquet Beverage Storage
Sound Equipment
194 Audio / Visual Equipment Storage Room
195 Banquet Service Manager’s Office
Florist / Floral Preparation
196 Operable / Movable Partitions
198 Function Space Entrance
199 Tour Desk
System Features
201 07-RHR-Module 7 Guest Accommodations
DS-RHR-Jan2009-M07A-Guestrooms
203 Space Planning
Program
Overview
205 Guestroom & Suite Types
207 Features – Common to Guestrooms & Suites
211 Interior Design, Finishes & Materials
213 Guestroom Entry & Foyer
214 Example: Guestroom Plans
216 Guestroom Closet
217 Refreshment Alcove (Dry Bar)
219 Guest Bathroom
224 Pantry in Suites
225 Balconies, Patios & Terraces
227 FF&E (Furniture, Fixtures & Equipment)
234 Attic Stock for Guestrooms & Suites
235 System Features
237 DS-RHR-Jan2009-M07B-Guestroom Corridors
239 Overview
Guestroom Corridors
242 Guest Elevator Foyers
243 Service Elevator Foyers
Ice Dispensing & Vending
244 Housekeeping / Linen Storage
245 Guest Laundry
246 Exit Stairs
247 Distribution Rooms
System Features – Corridors
249 DS-RHR-Jan2009-M07C-Club-Lounge
251 Overview
252 Program Spaces & Areas
256 Interior Design – Finishes
257 System Coordination
260 08-RHR-Module 8 Administrative and Associate Facilities
DS-RHR-Jan2009-M08A-Administration
262 Overview
265 Front Offices / Support Areas
268 “Call Center”
270 Executive Offices
271 Sales & Catering
272 Accounting
273 System Features
274 DS-RHR-Jan2009-M08B-Employees
276 Overview
277 Employee Entrance
278 Human Resource (HR) Offices
280 Training Room – Multi-Media
281 Nurse / First Aid Station
282 Locker / Change Area, Shower & Toilet Rooms
284 Employee Cafeteria
285 Service Corridors
286 System Coordination
287 09-RHR-Module 9 Engineering and Maintenance
289 Overview
Engineering & Maintenance Shops & Offices
291 Receiving Dock
292 Ancillary Receiving Dock Facilities
293 Purchasing & Receiving Offices
294 Mechanical, Electrical & Plumbing (MEP) Equipment
295 Exterior Maintenance Facilities
296 System Features
297 10-RHR-Module 10 Food and Beverage (Production)
362 11-RHR-Module 11 Laundry and Housekeeping
DS-RHR-Jan2009-M11A-LaundryL
364 Design Process
365 Laundry Facility
368 Laundry Manager’s Office
369 Soiled Linen Storage and Sorting
370 Washing
371 Drying
372 Flatwork Ironing
374 Dry Folding
375 Uniform Finishing
376 Clean Linen Storage
378 Valet (Garment Shop)
381 Uniform Storage and Issue
383 Laundry Mechanical Equipment Room
387 Wash Chemical Storage and Injection System
388 Air Compressor Room
390 Clean and Soiled Linen Holding
391 Laundry Equipment Standard of Quality
392 Special MEP Features
394 System Features
395 DS-RHR-Jan2009-M11B-Housekeeping
397 Overview
398 Programmed Spaces & Areas
401 System Features
402 12-RHR-Module 12 Elevators and EscalatorsL
404 Overview
405 Common Elevator Features
408 Fire and Emergency Control
410 Passenger Elevators
412 Shuttle Elevators
413 Service Elevators
416 Freight Elevators
Escalators
418 System Features
420 13-RHR-Module 13 Hotel Support Systems
DS-RHR-Jan2009-M13A-IT Infrastructure
422 Engagement Process
425 Wired LAN
427 Wireless LAN
430 Cellular Phone Coverage
431 Convergence
Network Components
432 Cable Termination Points
434 Computer / Telecom Room
440 Intermediate Distribution Frame (IDF)
442 Hotel Facilities
447 Property Systems
449 DS-RHR-Jan2009-M13B-Telecom
451 System Description
PABX Telephone System
453 Telephone Extensions
454 Other Communication Systems
Telephone System Equipment Room
456 Acronyms and Example Diagrams
466 DS-RHR-Jan2009-M13C-AV
468 General Description
469 References & Definitions
470 Sound Systems – Background Music
473 Event Space Sound Systems & Visual Display
484 Food & Beverage Sound Systems
486 Fitness Area Sound & Video Systems
487 Spa Sound & Video Systems
488 Entertainment Lounges Sound & Video Systems
489 Master Antenna Television (MATV) System
491 Visual Information Systems
493 Infrastructure Requirements
500 System Coordination
501 14-RHR-Module 14-Fire-Protection+LS
503 General Requirements
Definitions
504 Codes, References and Standards
505 Systems Testing
506 Submittals
507 Automatic Sprinkler / Standpipe System
510 Fire Alarm
513 Mechanical Smoke Control
514 Kitchen Hood and Duct Fire Suppression
Emergency Electrical Systems
515 Central Control Station (Fire Command Room)
Means of Egress
516 Special Considerations
517 Example Diagrams
523 15-RHR-Module 15 Mechanical Plumbing and Electrical
DS-RHR-2009-M15A-Mech-FINAL
525 General Requirements
526 Building Cooling/Heating Load Calculations
527 HVAC System Requirements
529 Central Cooling Plant
533 Central Heating Plant
535 Piping Systems
538 Air Side Systems
545 Duct work
547 Smoke Exhaust Systems
550 Fuel Oil System
Building Commissioning
551 Building Automation System (BAS)
558 DS-RHR-2009-M15B-Plumbing-FINAL
560 General Requirements
561 Sanitary System
562 Storm Drainage System
Domestic Water
565 Miscellaneous Requirements
566 Piping Systems
569 Commissioning
575 Plumbing Fixtures, Accessories & Trim
576 Table 15B-1 – Plumbing Requirements
578 DS-RHR-2009-M15C-Electrical-FINAL
580 General Requirements
Base Electrical System
581 Distribution
584 Lighting
597 Power
598 Emergency Electrical Systems
601 Fire Alarm System
Fire Command Room (Central Control Station)
Miscellaneous Electrical
602 Commissioning
603 Table 15C-1 – Lighting Criteria
606 16-RHR-Module 16-Loss Prevention
608 Organization
Objective
Risk Assessment & Safety Assessment
Goal
Overview
Loss Prevention Review
609 Design Integration
610 High Level Threat Condition
611 Building
Site
Application
Access Control
615 Loss Prevention (LP) Office
617 Change in Elevation
Loss Prevention & Safety Information
Safety – Features & Design Elements
623 Loss Prevention Systems & Equipment
628 System Coordination
]]>