National Grid – PDF Standards Store ?u= Sat, 26 Oct 2024 16:54:43 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.1 ?u=/wp-content/uploads/2024/11/cropped-icon-150x150.png National Grid – PDF Standards Store ?u= 32 32 NationalGrid shared constr esb759a 2010 ?u=/product/publishers/national-grid/nationalgrid-shared-constr-esb759a-2010/ Sun, 20 Oct 2024 09:02:30 +0000 Electric System Bulletin No. 759A - July 2010: URD Installation & Responsibility Guide
Published By Publication Date Number of Pages
National Grid 2010 50
]]>
None

]]>
NationalGrid shared constr esb759b 2010 ?u=/product/publishers/national-grid/nationalgrid-shared-constr-esb759b-2010/ Sun, 20 Oct 2024 09:02:30 +0000 Electric System Bulletin No. 759B - July 2010: UCD Installation & Responsibility Guide
Published By Publication Date Number of Pages
National Grid 2010
]]>
None

]]>
NationalGrid esb 757 2018 ?u=/product/publishers/national-grid/nationalgrid-esb-757-2018/ Sun, 20 Oct 2024 09:02:29 +0000 Electric System Bulletin No. 757 - April 2018: Network Services
Published By Publication Date Number of Pages
National Grid 2018 74
]]>
None

]]>
NationalGrid shared constr esb756 2023 ?u=/product/publishers/national-grid/nationalgrid-shared-constr-esb756-2023/ Sun, 20 Oct 2024 09:02:29 +0000 Electric System Bulletin No. 756 - January 2023: Requirements for Parallel Generation Connected to a National Grid Owned EPS
Published By Publication Date Number of Pages
National Grid 2023 160
]]>
None

PDF Catalog

PDF Pages PDF Title
2 Preface
3 Table of Contents
Introduction
6 Revision History
List of Appendices of ESB-756
7 ESB-756 Appendix A
8 Table of Contents
9 1.0 Purpose
2.0 Scope
10 3.0 Definitions
11 4.0 General
4.1 Permitted Connections
4.2 Access & Contacts
12 4.3 Design Requirements
16 4.4 Types of Generators or Other Parallel Sources
19 4.5 Limitations
20 5.0 Project Management
5.1 Responsibilities
25 5.2 Cooperation
27 5.3 Development of an Interconnection Arrangement
28 5.4 Compliance
6.0 Service Installation
6.1 Service Equipment
29 6.2 Grounding
6.3 Metering
7.0 Plant Requirements
7.1 Telemetering
31 7.2 Telecommunictions Steps and Requirements
32 7.3 Power Quality
7.4 Performance/Design
34 7.5 Plant Protection
38 8.0 Operating
8.1 Manual Disconnect Switch
8.2 Disconnection by the Compnay (Isolation)
39 8.3 Other
9.0 Revision History
40 ESB-756 Appendix B
41 Table of Contents
43 1.0 Purpose
44 2.0 Scope
45 3.0 Applicable Codes, Standards, and Guidelines
46 4.0 Definitions
5.0 Interconnection Customer Interface Procedures
5.1 Application Process Overview
51 5.2 Interconnection Process- Non Expedited
5.3 Objectives in the Application Process
52 5.4 Special System Considerations
53 5.5 Interconnection Charges
55 6.0 Potential Issues Related to Interconnection
6.1 General Considerations
57 6.2 Significant EPS Considerations
58 7.0 General Design and Operating Requirements
59 7.1 General Criteria
61 7.2 Service Equipment and Revenue Metering
62 7.3 Transformer
64 7.4 Manual Disconnecting Means
66 7.5 Generator Interrupting Device Requirements
67 7.6 Protection and Protective Equipment Requirements
76 7.7 Monitoring and Control (M&C) at DER Facility
81 7.8 Voltage and Frequency Ride Through and Control Requirements
83 8.0 Testing and Commissioning
84 9.0 Operating
10.0 Power Quality Monitoring
10.1 Power Quality Compliance Verification
85 10.2 Power Quality Disturbance and Mitigation
10.3 Transient Overvoltage/Load Rejection Overvoltage (LROV)
11.0 Facility Audit
12.0 Disconnection by the Company (Isolation)
86 13.0 Revision History
87 Exhibits Attached
Exhibit 1: Company Requirements for DER Systems Not Eligable for the Expedited Process
Exhibit 2: Reference Maps of National Grid Upstate NY Secondary Netwrok EPS Areas
89 Exhibit 3: Distribution Secondary Grid and Spot Network Description
90 Exhibit 4 Recommended Guidelines for Residential and Commercial Single-line Diagram Submittals
91 Figure 1: Sample Distributed Generator One-Line Diagram
92 Figure 2: Typical Symbology for Electrical Drawings
93 Exhibit 5: Recommended Guidelines for Functional Sinle-line Diagram Submittals
94 Figure 3: Sample Functional Single-Line Diagram
95 Figure 4: Typical 3V0 Requirements for Local EPS Ground Fault Detection
Figure 5: Typical Overhead Single Primary Service Configuration in NY for Large DER Installations
97 Figure 6: Typical Underground Single Primary Service Configuration in NY for Large DER Installations
98 Exhibit 6: Net Metering Compliance Verification Checklist
Exhibit 7: Net Metering Compliance Verification Checklist (Simplified Process)
100 ESB-756 Appendix C
101 Table of Contents
103 1.0 Purpose
104 2.0 Scope
105 3.0 Applicable Codes, Standards, and Guidelines
106 4.0 Definitions
107 5.0 Interconnection Customer Interface Procedures
5.1 Application Process Overview
112 5.2 Interconnection Process for DER Not Eligable for the Simplified Process
5.3 Objectives in the Application Process
114 5.4 Special System Considerations
116 5.5 Interconnection Charges
117 6.0 Potential Issues Related to Interconnection
6.1 General Considerations
119 6.2 Significant EPS Considerations
120 7.0 General Design and Operating Requirements
121 7.1 General Criteria
123 7.2 Service Equipment and Revenue Metering
125 7.3 Transformer
127 7.4 Manual Generator Disconnecting Means
129 7.5 Generator Interrupting Device Requirements
130 7.6 Protection and Protective Equipment Requirements
141 7.7 Monitoring and Control (M&C) at DER Facility
143 7.8 Voltage and Frequency Ride Through and Control Requirements
145 8.0 Testing and Commissioning
146 9.0 Operating
10.0 Power Quality Monitoring
10.1 Power Quality Compliance Verification
147 10.2 Power Quality Disturbance and Mitigation
10.3 Transient Overvoltage/Load Rejection Overvoltage (LROV)
11.0 Facility Audit
12.0 Disconnection by the Company (Isolation)
148 13.0 Revision History
149 Exhibits Attached
Exhibit 1: Company Requirements for Projects Not Eligable for the Simplified Process
150 Exhibit 2: Reference Maps of National Grid Massachusetts Secondary Network EPS Areas
151 Exhibit 3: Distribution Secondary Grid and Spot Network Description
152 Exhibit 4: Recommended Guidelines for Residential and Commercial Single-line Diagram Submittals
153 Figure 1: Sample Residential Photovoltaic Distributed Generator Installation – Single Phase, Net Metered
154 Figure 2: Sample Distributed Generator One-Line Diagram
155 Figure 3: Typical Symbology for Electrical Drawings
156 Exhibit 5: Recommended Guidelines for Functional Single-line Diagram Submittals
157 Figure 4: Sample Functional Single-Line Diagram
158 Figure 5: Typical 3V0 Requirements for Local EPS Ground Fault Detection
159 Exhibit 6: Typical Overhead Primary Service Configuration in MA for Large DER Installation
160 Exhibit 7: Net Metering Verification Checklist (Simplified Process)
]]>
NationalGrid esb 754 june 2021 ?u=/product/publishers/national-grid/nationalgrid-esb-754-june-2021/ Sun, 20 Oct 2024 09:02:29 +0000 Electric System Bulletin No. 754-2021: Requirements for National Grid Equipment in Customer Owned Vaults
Published By Publication Date Number of Pages
National Grid 2021 57
]]>
None

]]>
NationalGrid esb750 errata revisions 2023 ?u=/product/publishers/national-grid/nationalgrid-esb750-errata-revisions-2023/ Sun, 20 Oct 2024 09:02:28 +0000 Electrical Service Bulletin (ESB) 750: Specifications for Electrical Installations - Errata and Revisions (May 2023)
Published By Publication Date Number of Pages
National Grid 2023 34
]]>
None

PDF Catalog

PDF Pages PDF Title
2 TABLE of CONTENTS
3 General Notice
ESB No. 750-2022 (January 2022) – Specifications for Electrical Installations (Upstate NY, MA)
4 ESB No. 751-2014 (June 2014) “General Requirements for Services Above 600 Volts”
ESB No. 752-1994, 2nd Printing April 2002 “Service above 15,000 volts”
5 ESB No. 753-1993, 2nd Printing April 2002 “Primary Meter Pole”
7 753ER-1
8 753ER-1A
9 753ER-2
10 753ER-3
11 753ER-4
12 753ER-5
13 753ER-6
14 753ER-7
15 753ER-7A
16 753ER-8
17 753ER-9
18 ESB No. 754A-1992, 2nd Printing June 2002 “Single Phase Outdoor Pad Mounted Transformer”
ESB No. 754-2007 “Outdoor Pad Mounted or Vault Enclosed Three Phase Transformer”
ESB No. 755-2003 “Operation & Maintenance Requirements for Services Above 600 volts”
ESB No. 756-2021 “General Requirements for Parallel Generation Connected to a National Grid Owned EPS”, version 7.0
ESB No. 756 Appendix A; “Requirements for Parallel Generation Connected to National Grid Facilities in New York”, version 6.0
19 ESB No. 756 Appendix B; “Distributed Generation Connected to National Grid Distribution Facilities Per The New York Standardized Interconnection Requirements”, version 8.0
20 ESB No. 756 Appendix C; “Distributed Generation Connected to National Grid Distribution Facilities Per The Massachusetts Standards for Interconnecting Distributed Generation”, version 9.0”
ESB No. 756 Appendix D; “Distributed Generation Connected to National Grid Distribution Facilities Per The Rhode Island Standards for Interconnecting Distributed Generation”
21 ESB No. 756 Appendix E; “Requirements for Parallel Generation Connected to National Grid Facilities in New Hampshire”
ESB No. 757, April 2018 “Requirements for Services Supplied from National Grid’s Secondary Networks”
ESB No. 758, Jan. 1985 “Primary Service to Metal Enclosed Gear”
28 ESB No. 759A
29 ESB No. 759B
34 REVISION HISTORY
]]>
NationalGrid esb751 june 2014 ?u=/product/publishers/national-grid/nationalgrid-esb751-june-2014/ Sun, 20 Oct 2024 09:02:28 +0000 Electric System Bulletin No. 751 - June 2014: Service Above 600 Volts, General Requirements
Published By Publication Date Number of Pages
National Grid 2014 21
]]>
None

]]>
NationalGrid constr esb758 1985 ?u=/product/publishers/national-grid/nationalgrid-constr-esb758-1985/ Sun, 20 Oct 2024 09:02:28 +0000 Electric System Bulletin No. 758: Primary Service to Metal Enclosed Gear, Commercial & Industrial
Published By Publication Date Number of Pages
National Grid 1985 14
]]>
None

]]>
NationalGrid constr esb755 2003 ?u=/product/publishers/national-grid/nationalgrid-constr-esb755-2003/ Sun, 20 Oct 2024 09:02:24 +0000 Electric System Bulletin No. 755 - June 2003: Operation and Maintenance Requirements for Services Above 600 Volts
Published By Publication Date Number of Pages
National Grid 2003 10
]]>
None

]]>
NationalGrid constr esb753 2002 ?u=/product/publishers/national-grid/nationalgrid-constr-esb753-2002/ Sun, 20 Oct 2024 09:02:23 +0000 Electric System Bulletin No. 753-1993, 2nd Printing - April 2002: Primary Meter Pole, Commercial & Industrial
Published By Publication Date Number of Pages
National Grid 2002
]]>
None

PDF Catalog

PDF Pages PDF Title
1 ESB 753
2 Table of Contents
3 List of Figures
]]>