VT – PDF Standards Store ?u= Sat, 26 Oct 2024 18:38:40 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.1 ?u=/wp-content/uploads/2024/11/cropped-icon-150x150.png VT – PDF Standards Store ?u= 32 32 Vermont StateClimateSummary 2022 ?u=/product/publishers/vt/vermont-stateclimatesummary-2022/ Sun, 20 Oct 2024 10:05:29 +0000 Vermont State Climate Summary
Published By Publication Date Number of Pages
VT 2022 4
]]>
None

]]>
VT RBES 2020 ?u=/product/publishers/vt/vt-rbes-2020/ Sun, 20 Oct 2024 07:22:49 +0000 Vermont Residential Building Energy Standards (RBES) effective September 1, 2020
Published By Publication Date Number of Pages
VT 2020 69
]]>
None

]]>
VT CBES 2020 ?u=/product/publishers/vt/vt-cbes-2020/ Sun, 20 Oct 2024 07:22:49 +0000 Vermont Commercial Building Energy Standards (CBES) effective September 1, 2020
Published By Publication Date Number of Pages
VT 2020
]]>
None

PDF Catalog

PDF Pages PDF Title
7 PREFACE
Introduction
Development
Background
Update Process
8 EFFECTIVE USE OF THE 2020 VERMONT COMMERCIAL BUILDING ENERGY STANDARDS
Arrangement and Format of the 2020 CBES
Italicized Terms
10 Marginal Markings
Abbreviations and Notations
23 – add – C302.2 Climatic data0F .
24 TABLE C303.1.3(1) DEFAULT GLAZED WINDOW, GLASS DOOR AND SKYLIGHT U-FACTORS
25 TABLE 4.2.1.1 Building Performance Factor (BPF)
30 SECTION C402 BUILDING ENVELOPE REQUIREMENTS
31 TABLE C402.1(1)
33 TABLE C402.1(2) BUILDING ENVELOPE REQUIREMENTS—METAL BUILDING ASSEMBLY DESCRIPTIONS
34 TABLE C402.1(3) ASSEMBLY U-FACTORS FOR METAL BUILDING ROOFS
35 – add – TABLE C402.1(4) ASSEMBLY U-FACTORS FOR ATTIC ROOFS WITH WOOD JOISTS
TABLE C402.1(4) ASSEMBLY U-FACTORS FOR ATTIC ROOFS WITH WOOD JOISTS
36 TABLE C402.1(5) ASSEMBLY U-FACTORS FOR METAL BUILDING WALLS
37 TABLE C402.1(6) ASSEMBLY U-FACTORS FOR METAL-FRAMED WALLS
38 – add – TABLE C402.1(7) ASSEMBLY U-FACTORS FOR WOOD-FRAMED WALLS
TABLE C402.1(7) ASSEMBLY U-FACTORS FOR WOOD-FRAMED WALLS
42 TABLE C402.3 BUILDING ENVELOPE FENESTRATION MAXIMUM U-FACTOR AND SHGC REQUIREMENTS
– delete – TABLE C402.4 BUILDING ENVELOPE FENESTRATION MAXIMUM U-FACTOR AND SHGC REQUIREMENTS
46 – add – C402.4.1.2 Continuous Air Barrier Commissioning
– add – C402.4.1.2.1 Building Envelope Commissioning Guideline
47 TABLE C402.4.1.2.1
BUILDING ENVELOPE COMMISIONING CHECKLIST
53 SECTION C403 BUILDING MECHANICAL SYSTEMS
55 – delete and replace – TABLE C403.3.2(1) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
TABLE C403.3.2(1) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
56 TABLE C403.3.2(1)—continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
57 – delete and replace – TABLE C403.3.2(2) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
TABLE C403.3.2(2) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
58 TABLE C403.3.2(2)—continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
59 – delete and replace – TABLE C403.3.2(7) WATER CHILLING PACKAGES – EFFICIENCY REQUIREMENTS
TABLE C403.3.2(7) WATER CHILLING PACKAGES – EFFICIENCY REQUIREMENTSa, b, d
60 TABLE C403.3.2(10) MINIMUM EFFICIENCY ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR CONDITIONERS
61 – add – TABLE C403.3.2(11) MINIMUM EFFICIENCY ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR-TO-AIR AND APPLIED HEAT PUMPS
TABLE C403.3.2(11) MINIMUM EFFICIENCY ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR-TO-AIR AND APPLIED HEAT PUMPS
62 – modify – TABLE C403.3.2(10) HEAT TRANSFER EQUIPMENT to TABLE C403.3.2(12) HEAT TRANSFER EQUIPMENT
65 – delete – TABLE C403.4.4 VARIABLE SPEED DRIVE (VSD) REQUIREMENTS FOR DEMAND-CONTROLLED PUMPS
66 MINIMUM CHILLED-WATER SYSTEM COOLING CAPACITY FOR DETERMINING ECONOMIZER COOLING REQUIREMENTS
67 – delete and replace – TABLE C403.5.1 DX COOLING STAGE REQUIREMENTS FOR MODULATING AIRFLOW UNITSTABLE C403.5.1 DX COOLING STAGE REQUIREMENTS FOR MODULATING AIRFLOW UNITS
– delete and replace – TABLE C403.5.3.3 HIGH-LIMIT SHUTOFF CONTROL SETTING FOR AIR ECONOMIZERSbTABLE C403.5.3.3 HIGH-LIMIT SHUTOFF CONTROL SETTING FOR AIR ECONOMIZERSb
75 – delete and replace – TABLE C403.8.5.1 COOLING SYSTEMS
TABLE C403.8.5.1 COOLING SYSTEMS
80 – delete and replace – TABLE C403.11.3 MINIMUM PIPE INSULATION THICKNESS (in inches)
TABLE C403.11.3 MINIMUM PIPE INSULATION THICKNESS (in inches)a, c
82 TABLE C404.2 MINIMUM PERFORMANCE OF WATER-HEATING EQUIPMENT
83 TABLE C404.2—continued MINIMUM PERFORMANCE OF WATER-HEATING EQUIPMENT
86 – delete and replace – C405.2.1.4 Occupant sensor control function for egress illumination.
89 – add – C405.2.3.1.1 Dimming.
91 FIGURE C405.2.3.3(4)
DAYLIGHT ZONE ADJACENT TO CLERESTORY FENESTRATION IN A WALL
94 TABLE C405.3.2(1) INTERIOR LIGHTING POWER ALLOWANCES: BUILDING AREA METHOD
95 – delete and replace – TABLE C405.3.2(2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
TABLE C405.3.2(2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
96 TABLE C405.3.2(2)—continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
97 TABLE C405.3.2(2)—continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
98 TABLE C405.3.2(2)—continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
99 TABLE C405.4.2(1) EXTERIOR LIGHTING ZONES
100 TABLE C405.4.2(2) INDIVIDUAL LIGHTING POWER ALLOWANCES FOR BUILDING EXTERIORS
101 – delete – TABLE C405.4.2(3) INDIVIDUAL LIGHTING POWER ALLOWANCES FOR BUILDING EXTERIORS
– add – C405.10 Electric Vehicle Charging Stations
102 TABLE C405.11 ELECTRIC VEHICLE CHARGING PARKING SPACES
111 – modify – FIGURE C408.2.4 COMMISSIONING COMPLIANCE CHECKLIST to FIGURE C407.2.4 COMMISSIONING COMPLIANCE CHECKLIST
117 APPENDIX CA SOLAR-READY ZONE—COMMERCIAL
SECTION CA103 SOLAR-READY ZONE
]]>
VT ElectricalRules 2020 ?u=/product/publishers/vt/vt-electricalrules-2020/ Sun, 20 Oct 2024 07:22:47 +0000 Vermont Electrical Safety Rules 2020 effective April 15, 2022
Published By Publication Date Number of Pages
VT 2020 17
]]>
None

PDF Catalog

PDF Pages PDF Title
3 l. PURPOSE OF THE RULES
2. ADOPTION OF THE RULES
3. ELECTRICAL LICENSING
4 3.1 MASTER ELECTRICIAN
3.2 JOURNEYMAN ELECTRICIAN
5 3.3 TYPE-S JOURNEYMAN ELECTRICIAN
6 3.4 APPLICATION; EXAMINATIONS AND FEES
3.5 RENEWAL OF LICENSE
7 3.6 REVOCATION, SUSPENSION AND REFUSAL OF RENEWAL OF LICENSE
4. DUTIES OF THE LICENSEE
8 5. ADOPTION OF NATIONALLY RECOGNIZED SAFETY STANDARDS
9 6. REFERENCE DOCUMENTS
10 7. WORK NOTICE, FEES, INSPECTION, ENERGIZING, INSTALLATIONS, CERTIFICATE OF COMPLETION
7.1 WORK NOTICE
7.2 WORK NOTICE FEES
11 7.3 INSPECTION
7.4 ENERGIZING INSTALLATIONS
8. POWERS OF ENFORCEMENT
9. LICENSING DISCIPLINARY PROCEDURE
12 9.2 INITIATING THE INVESTIGATION
9.3 RECOMMENED ACTION
9.4 FORMAL HEARING BY THE BOARD
14 10. SEVERABILITY CLAUSE AND EFFECTIVE DATE
15 ANNEX I
Subchapter 1: General Provisions
Subchapter 2: Regulation Of Electrical Installations By Licensing Board
Subchapter 3: Licensing Electricians
16 ANNEX II
17 ANNEX III – HOW TO OBTAIN STANDARDS AND REFERENCE DOCUMENTS
ANNEX IV – HOW TO CONTACT THE DIVISION OF FIRE SAFETY
The Division of Fire Safety has four regional offices:
]]>
VT PlumbingRules 2021 ?u=/product/publishers/vt/vt-plumbingrules-2021/ Sun, 20 Oct 2024 07:22:47 +0000 Vermont Plumbing Rules effective December 15, 2022
Published By Publication Date Number of Pages
VT 2021 32
]]>
None

PDF Catalog

PDF Pages PDF Title
1 Effective Date – December 15, 2022 2021
3 Section 1: PURPOSE OF THE RULES
Section 2: SCOPE OF THE RULES
Section 3: DEFINITIONS
5 Section 4: PLUMBERS’ EXAMINING BOARD
Section 5: THE COMMISSIONER OF PUBLIC SAFETY
6 Section 6: DUTIES OF THE OWNER
7 Section 7: DUTIES OF A LICENSE HOLDER
Section 8: LICENSE EXAMINATIONS
(A) Master Plumbers
(B) Journeyman Plumbers
8 (C) Limited Licensure; Specialists
Specialty fields for limited licenses include the following:
9 (D) Process for Examinations
(E) Examination not Required
10 Section 9: RENEWAL OF LICENSE
11 Section 10: PLUMBING LICENSE FEES
Section 11: LICENSE NOT REQUIRED
12 Section 12: COMPLAINTS
Section 13: DISCIPLINARY PROCEEDINGS.
13 Section 14: WORK NOTICES
Section 15: SCHEDULE OF WORK NOTICE AND INSPECTION FEES
14 Section 16: INSPECTION OF PLUMBING INSTALLATIONS
(A) PLANS
(B) ROUGH INSPECTIONS
(C) FINAL INSPECTIONS
15 Section 17: CONNECTING INSTALLATIONS
Section 18: PRIORITIES FOR INSPECTION, REVIEW AND INVESTIGATION
16 Section 19 APPROVAL, ALTERNATIVES, AND VARIANCES
Section 20: REQUEST FOR RECONSIDERATION
Section 21: ADOPTION OF A NATIONALLY RECOGNIZED CODE:
24 Section 22: SEVERABILITY CLAUSE
25 APPENDIX (A) THE VERMONT PLUMBING LAW 26 V.S.A. CHAPTER 39
26 APPENDIX (B) DEFINITION OF PUBLIC BUILDING – 20 V.S.A 2900(8)
APPENDIX (C) PROCEDURE FOR LICENSING DISCIPLINARY PROCEDURE
(B) INITIATING THE INVESTIGATION.
27 (C) RECOMMENDED ACTION.
(D) FORMAL HEARING BY THE BOARD.
28 APPENDIX (D) ASBESTOS
30 John Hammer
32 – HOW TO CONTACT THE DIVISION OF FIRE SAFETY
]]>
VT ResidentialEnergyCode 2020 1stprint ?u=/product/publishers/vt/vt-residentialenergycode-2020-1stprint/ Sun, 20 Oct 2024 02:34:20 +0000 Vermont Residential Building Energy Standards
Published By Publication Date Number of Pages
VT 2020 69
]]>
Custom code based on the Residential provisions of the 2018 International Energy Conservation Code, first printing.

PDF Catalog

PDF Pages PDF Title
1 2020 VERMONT RESIDENTIAL BUILDING ENERGY STANDARDS
2 2020 VERMONT RESIDENTIAL BUILDING ENERGY STANDARDS TITLE PAGE
3 COPYRIGHT
4 PREFACE
6 EFFECTIVE USE OF THE 2020 VERMONT RESIDENTIAL BUILDING ENERGY STANDARDS
10 TABLE OF CONTENTS
12 CHAPTER 1 [RE] ADMINISTRATION
PART 1—SCOPE AND APPLICATION
SECTION R101 SCOPE AND GENERAL REQUIREMENTS
13 SECTION R102 ALTERNATIVE MATERIALS, DESIGN AND METHODS OF CONSTRUCTION AND EQUIPMENT
PART 2—ADMINISTRATION AND ENFORCEMENT
SECTION R103 CONSTRUCTION DOCUMENTS
14 SECTION R104 INSPECTIONS
15 SECTION R105 VALIDITY
SECTION R106 REFERENCED STANDARDS
16 CHAPTER 2 [RE] DEFINITIONS
SECTION R201 GENERAL
SECTION R202 GENERAL DEFINITIONS
26 CHAPTER 3 [RE] GENERAL REQUIREMENTS
SECTION R301 [RESERVED]
SECTION R302 DESIGN CONDITIONS
TABLE R302.2 THERMAL DESIGN PARAMETERS
SECTION R303 MATERIALS, SYSTEMS AND EQUIPMENT
TABLE R303.1.3(1) DEFAULT GLAZED WINDOW, GLASS DOOR AND SKYLIGHT U-FACTORS
27 TABLE R303.1.3(2) DEFAULT DOOR U-FACTORS
TABLE R303.1.3(3) DEFAULT GLAZED FENESTRATION SHGC AND VT
SECTION R304 DESIGN CRITERIA FOR RESIDENTIAL VENTILATION SYSTEMS
TABLE R304.2 MINIMUM REQUIRED LOCAL EXHAUST
28 TABLE R304.6 PRESCRIPTIVE FAN CAPACITY REQUIREMENTS
29 SECTION R305 COMBUSTION SAFETY (MANDATORY)
32 CHAPTER 4 [RE] RESIDENTIAL ENERGY EFFICIENCY
SECTION R401 GENERAL
SECTION R402 BUILDING THERMAL ENVELOPE
33 TABLE R402.1.2.2 REQUIRED POINTS BY BUILDING SIZE
TABLE R402.1.4 EQUIVALENT U-FACTORSa
34 TABLE R402.1.2.1 INSULATION AND FENESTRATION REQUIREMENTS BY COMPONENT FOR BASE PACKAGES
35 TABLE R402.1.2.3 POINTS BY COMPONENT
36 TABLE R402.1.6 LOG HOME INSULATION, FENESTRATION AND HEATING REQUIREMENTS BY COMPONENTa
37 TABLE R402.2.6 STEEL-FRAME CEILING, WALL AND FLOOR INSULATION (R-VALUE)
40 TABLE R402.4.1.1 AIR BARRIER AND INSULATION INSTALLATION
41 TABLE R402.4.1.1—continued AIR BARRIER AND INSULATION INSTALLATION
42 SECTION R403 SYSTEMS
44 TABLE R403.6.1 WHOLE HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACYa
45 SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS
TABLE R404.3 REQUIRED ELECTRIC VEHICLE CHARGING PARKING SPACES FOR MULTIFAMILY BUILDINGS (BASE and STRETCH CODE)
SECTION R405 ALTERNATIVE USING REScheckTM SOFTWARE
46 SECTION R406 ENERGY RATING INDEX COMPLIANCE ALTERNATIVE
47 SECTION R407 VERMONT STRETCH CODE
TABLE R407.2.1.2 REQUIRED POINTS BY BUILDING SIZE
48 TABLE R407.2.1.1 INSULATION AND FENESTRATION REQUIREMENTS BY COMPONENT FOR STRETCH PACKAGES
49 TABLE R407.2.1.3 POINTS BY COMPONENT
52 CHAPTER 5 (RE) EXISTING BUILDINGS
SECTION R501 GENERAL
SECTION R502 ADDITIONS
53 SECTION R503 ALTERATIONS
54 SECTION R504 REPAIRS
SECTION R505 CHANGE OF OCCUPANCY OR USE
56 CHAPTER 6 REFERENCED STANDARDS
AAMA
ACCA
APSP
ASHRAE
57 ASTM
CSA
DASMA
HVI
ICC
58 IEEE
NFPA
NFRC
RESNET
59 UL
US-FTC
WDMA
60 APPENDIX RA RECOMMENDED PROCEDURE FOR WORST-CASE TESTING OF ATMOSPHERIC VENTING SYSTEMS UNDER R402.4 OR R405 CONDITIONS ≤ 5 ACH50
SECTION RA101 SCOPE
SECTION RA201 GENERAL DEFINITIONS
SECTION RA301 TESTING PROCEDURE
61 TABLE RA301.1(1) CAZ DEPRESSURIZATION LIMITS
TABLE RA301.1(2) ACCEPTABLE DRAFT TEST CORRECTION
TABLE RA301.1(3) ACCEPTABLE DRAFT TEST CORRECTION
62 APPENDIX RB (DELETED)
64 INDEX
]]>
VT CommercialEnergyCode 2020 1stprint ?u=/product/publishers/vt/vt-commercialenergycode-2020-1stprint/ Sun, 20 Oct 2024 02:34:19 +0000 Vermont Commercial Building Energy Standards
Published By Publication Date Number of Pages
VT 2020
]]>
Custom code based on the Commercial provisions of the 2018 International Energy Conservation Code, first printing.

PDF Catalog

PDF Pages PDF Title
1 2020 VERMONT COMMERCIAL BUILDING ENERGY STANDARDS
2 2020 VERMONT COMMERCIAL BUILDING ENERGY STANDARDS TITLE PAGE
3 COPYRIGHT
4 PREFACE
6 EFFECTIVE USE OF THE 2020 VERMONT COMMERCIAL BUILDING ENERGY STANDARDS
10 IECC—COMMERCIAL PROVISIONS TABLE OF CONTENTS
12 CHAPTER 1 [CE] SCOPE AND ADMINISTRATION
PART 1—SCOPE AND APPLICATION
SECTION C101 SCOPE AND GENERAL REQUIREMENTS
13 SECTION C102 ALTERNATIVE MATERIALS, DESIGN AND METHODS OF CONSTRUCTION AND EQUIPMENT
PART 2—ADMINISTRATION AND ENFORCEMENT
SECTION C103 CONSTRUCTION DOCUMENTS
14 SECTION C104 RESERVED
SECTION C105 INSPECTIONS
15 SECTION C106 VALIDITY
SECTION C107 REFERENCED STANDARDS
SECTION C108 RESERVED
SECTION C109 RESERVED
16 CHAPTER 2 [CE] DEFINITIONS
SECTION C201 GENERAL
SECTION C202 GENERAL DEFINITIONS
24 CHAPTER 3 [CE] GENERAL REQUIREMENTS
SECTION C301 CLIMATE ZONES
SECTION C302 DESIGN CONDITIONS
SECTION C303 MATERIALS, SYSTEMS AND EQUIPMENT
25 TABLE C303.1.3(1) DEFAULT GLAZED WINDOW, GLASS DOOR AND SKYLIGHT U-FACTORS
TABLE C303.1.3(2) DEFAULT OPAQUE DOOR U-FACTORS
TABLE C303.1.3(3) DEFAULT GLAZED FENESTRATION SHGC AND VT
26 CHAPTER 4 [CE] COMMERCIAL ENERGY EFFICIENCY
SECTION C401 GENERAL
TABLE 4.2.1.1 BUILDING PERFORMANCE FACTOR (BPF)
28 SECTION C402 BUILDING ENVELOPE REQUIREMENTS
29 EQUATION 4-1
30 TABLE C402.1(1) BUILDING ENVELOPE REQUIREMENTS—OPAQUE ASSEMBLIES AND ELEMENTS
31 TABLE C402.1(2) BUILDING ENVELOPE REQUIREMENTS—METAL BUILDING ASSEMBLY DESCRIPTIONS
32 TABLE C402.1(3) ASSEMBLY U-FACTORS FOR METAL BUILDING ROOFS
33 TABLE C402.1(4) ASSEMBLY U-FACTORS FOR ATTIC ROOFS WITH WOOD JOISTS
34 TABLE C402.1(5) ASSEMBLY U-FACTORS FOR METAL BUILDING WALLS
35 TABLE C402.1(6) ASSEMBLY U-FACTORS FOR METAL-FRAMED WALLS
36 TABLE C402.1(7) ASSEMBLY U-FACTORS FOR WOOD-FRAMED WALLS
37 EQUATION 4-2
38 TABLE C402.3 BUILDING ENVELOPE FENESTRATION MAXIMUM U-FACTOR AND SHGC REQUIREMENTS
EQUATION 4-3
39 EQUATION 4-4
41 TABLE C402.4.1.2.1 BUILDING ENVELOPE COMMISIONING CHECKLIST
42 TABLE C402.4.1.5 MAXIMUM AIR LEAKAGE RATE FOR FENESTRATION ASSEMBLIES
44 SECTION C403 BUILDING MECHANICAL SYSTEMS
45 EQUATION 4-5
EQUATION 4-6
46 TABLE C403.3.2(1) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
47 TABLE C403.3.2(1)—continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
48 TABLE C403.3.2(2) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
49 TABLE C403.3.2(2)—continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
50 TABLE C403.3.2(3) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED PACKAGED TERMINAL AIR CONDITIONERS, PACKAGED TERMINAL HEAT PUMPS, SINGLE-PACKAGE VERTICAL AIR CONDITIONERS, SINGLE VERTICAL HEAT PUMPS, ROOM AIR CONDITIONERS AND ROOM AIR-CONDITIONER HEAT PUMPS
51 TABLE C403.3.2(3)—continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED PACKAGED TERMINAL AIR CONDITIONERS, PACKAGED TERMINAL HEAT PUMPS, SINGLE-PACKAGE VERTICAL AIR CONDITIONERS, SINGLE VERTICAL HEAT PUMPS, ROOM AIR CONDITIONERS AND ROOM AIR-CONDITIONER HEAT PUMPS
TABLE C403.3.2(4) WARM-AIR FURNACES AND COMBINATION WARM-AIR FURNACES/AIR-CONDITIONING UNITS, WARM-AIR DUCT FURNACES AND UNIT HEATERS, MINIMUM EFFICIENCY REQUIREMENTS
52 TABLE C403.3.2(5) MINIMUM EFFICIENCY REQUIREMENTS: GAS- AND OIL-FIRED BOILERS
TABLE C403.3.2(6) MINIMUM EFFICIENCY REQUIREMENTS: CONDENSING UNITS, ELECTRICALLY OPERATED
53 TABLE C403.3.2(7) WATER CHILLING PACKAGES – EFFICIENCY REQUIREMENTS
54 TABLE C403.3.2(8) MINIMUM EFFICIENCY REQUIREMENTS: HEAT REJECTION EQUIPMENT
55 TABLE C403.3.2(9) MINIMUM EFFICIENCY AIR CONDITIONERS AND CONDENSING UNITS SERVING COMPUTER ROOMS
TABLE C403.3.2(10) MINIMUM EFFICIENCY ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR CONDITIONERS
56 TABLE C403.3.2(11) MINIMUM EFFICIENCY ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR-TO-AIR AND APPLIED HEAT PUMPS
57 TABLE C403.3.2(11)—(continued) MINIMUM EFFICIENCY ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR-TO-AIR AND APPLIED HEAT PUMPS
TABLE C403.3.2(12) HEAT TRANSFER EQUIPMENT
59 TABLE C403.5 MINIMUM CHILLED-WATER SYSTEM COOLING CAPACITY FOR DETERMINING ECONOMIZER COOLING REQUIREMENTS
60 TABLE C403.5.1 DX COOLING STAGE REQUIREMENTS FOR MODULATING AIRFLOW UNITS
TABLE C403.5.3.3 HIGH-LIMIT SHUTOFF CONTROL SETTING FOR AIR ECONOMIZERSb
63 TABLE C403.7.4 ENERGY RECOVERY REQUIREMENT (Air systems operating not less than 3,000 hours per year)
64 TABLE C403.7.5 MAXIMUM NET EXHAUST FLOW RATE, CFM PER LINEAR FOOT OF HOOD LENGTH
65 TABLE C403.8.1(1) FAN POWER LIMITATION
TABLE C403.8.1(2) FAN POWER LIMITATION PRESSURE DROP ADJUSTMENT
66 TABLE C403.8.5.1 COOLING SYSTEMS
68 TABLE C403.10.1(1) MINIMUM EFFICIENCY REQUIREMENTS: COMMERCIAL REFRIGERATION
TABLE C403.10.1(2) MINIMUM EFFICIENCY REQUIREMENTS: COMMERCIAL REFRIGERATORS AND FREEZERS
69 TABLE C403.10.1(2)—continued MINIMUM EFFICIENCY REQUIREMENTS: COMMERCIAL REFRIGERATORS AND FREEZERS
70 TABLE C403.10.1(3) WALK-IN COOLER AND FREEZER DISPLAY DOOR EFFICIENCY REQUIREMENTSa
TABLE C403.10.1(4) WALK-IN COOLER AND FREEZER NONDISPLAY DOOR EFFICIENCY REQUIREMENTSa
TABLE C403.10.1(5) WALK-IN COOLER AND FREEZER REFRIGERATION SYSTEM EFFICIENCY REQUIREMENTS
71 EQUATION 4-7
72 TABLE C403.11.3 MINIMUM PIPE INSULATION THICKNESS
SECTION C404 SERVICE WATER HEATING (MANDATORY)
74 TABLE C404.2 MINIMUM PERFORMANCE OF WATER-HEATING EQUIPMENT
75 TABLE C404.2—continued MINIMUM PERFORMANCE OF WATER-HEATING EQUIPMENT
76 SECTION C405 ELECTRICAL POWER AND LIGHTING SYSTEMS
78 EQUATION 4-8
80 FIGURE C405.2.3.2 SIDELIT ZONE
FIGURE C405.2.3.3(1) TOPLIT ZONE
FIGURE C405.2.3.3(2) DAYLIGHT ZONE UNDER A ROOFTOP MONITOR
81 FIGURE C405.2.3.3(3) DAYLIGHT ZONE UNDER A SLOPED ROOFTOP MONITOR
FIGURE C405.2.3.3(4) DAYLIGHT ZONE ADJACENT TO CLERESTORY FENESTRATION IN A WALL
82 EQUATION 4-9
83 TABLE C405.3.2(1) INTERIOR LIGHTING POWER ALLOWANCES: BUILDING AREA METHOD
TABLE C405.3.2(2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
84 TABLE C405.3.2(2)—continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
TABLE C405.3.2(2)—continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
85 EQUATION 4-10
86 TABLE C405.6 MINIMUM NOMINAL EFFICIENCY LEVELS FOR 10 CFR 431 LOW-VOLTAGE DRY-TYPE DISTRIBUTION TRANSFORMERS
TABLE C405.4.2(1) EXTERIOR LIGHTING ZONES
87 TABLE C405.4.2(2) LIGHTING POWER ALLOWANCES FOR BUILDING EXTERIORS
88 TABLE C405.7(1) MINIMUM NOMINAL FULL-LOAD EFFICIENCY FOR NEMA DESIGN A, NEMA DESIGN B, AND IEC DESIGN N MOTORS (EXCLUDING FIRE PUMP) ELECTRIC MOTORS AT 60 HZ
89 TABLE C405.7(2) MINIMUM NOMINAL FULL-LOAD EFFICIENCY FOR NEMA DESIGN C AND IEC DESIGN H MOTORS AT 60 HZ
TABLE C405.7(3) MINIMUM AVERAGE FULL-LOAD EFFICIENCY POLYPHASE SMALL ELECTRIC MOTORSa
90 TABLE C405.7(4) MINIMUM AVERAGE FULL-LOAD EFFICIENCY FOR CAPACITOR-START CAPACITOR-RUN AND CAPACITOR-START INDUCTION-RUN SMALL ELECTRIC MOTORSa
91 TABLE C405.11 ELECTRICAL VEHICLE CHARGING PARKING SPACES
SECTION C406 ADDITIONAL EFFICIENCY PACKAGE OPTIONS
92 TABLE C406.1 EFFICIENCY PACKAGE CREDITS
93 TABLE C406.5 EXTERIOR LIGHTING ZONES
94 SECTION C407 MAINTENANCE INFORMATION AND SYSTEM COMMISSIONING
98 FIGURE C407.2.4 COMMISSIONING COMPLIANCE CHECKLIST
100 CHAPTER 5 [CE] EXISTING BUILDINGS
SECTION C501 GENERAL
SECTION C502 ADDITIONS
101 SECTION C503 ALTERATIONS
102 SECTION C504 REPAIRS
SECTION C505 CHANGE OF OCCUPANCY OR USE
104 CHAPTER 6 [CE] REFERENCED STANDARDS
AAMA
AHAM
AHRI
105 AMCA
ANSI
APSP
ASHRAE
106 ASME
ASTM
107 CRRC
CSA
CTI
DASMA
DOE
108 ICC
IEEE
IES
ISO
109 NEMA
NFPA
NFRC
SMACNA
UL
US-FTC
110 WDMA
112 APPENDIX CA SOLAR-READY ZONE—COMMERCIAL
SECTION CA101 SCOPE
SECTION CA102 GENERAL DEFINITION
SECTION CA103 SOLAR-READY ZONE
114 INDEX
]]>
VT RutlandCounty Rutlandcity Amendment 1 ?u=/product/publishers/vt/vt-rutlandcounty-rutlandcity-amendment-1/ Sat, 19 Oct 2024 09:43:22 +0000 VT - Rutland County - Rutland city - Amendment
Published By Publication Date Number of Pages
VT N/A 44
]]>
None

]]>
VT State 16:2012 Edition ?u=/product/publishers/vt/vt-state-16/ Sat, 19 Oct 2024 09:43:13 +0000 Vermont Access Rules and Adaptable & Visitable Standards for Dwellings
Published By Publication Date Number of Pages
VT 2012 20
]]>
None

PDF Catalog

PDF Pages PDF Title
1 Cover
3 A. Introduction
B. Organization of the Rules
4 C. Adoption of Technical Standards
Chapter 1, Application and Administration
6 Chapter 2, Scoping Requirements
7 Chapter 3, Building Blocks
Chapter 4, Accessible Routes
8 Chapter 5, General Site and Building Elements
Chapter 6, Plumbing Elements and Facilities
Chapter 7, Communication Elements and Features
Chapter 8, Special Rooms, Spaces, and Elements
Chapter 9, Built-in Elements
Chapter 10, Recreation Facilities
Chapter 11, Housing, Adaptable and Visitable [Act 88] Dwelling Units
9 Chapter 12, Variances, Exceptions and Abatements
10 Chapter 13, Effective Date and Severability
11 Annex I. Excerpts from Vermont Law Pertaining to the Vermont Access Rules
13 Annex II. Federal Fair Housing Design Manual
15 Annex III. Technical Assistance
16 Annex IV. Ramp Specifications
17 Annex V. Table for Adaptable and Visitable [Act 88] Dwelling Units
18 Annex VI. Frequently Asked Questions
19 Annex VII. Index by Topic & Use
20 Annex VIII. Contact Information
]]>
VT State 15:2014 Edition ?u=/product/publishers/vt/vt-state-15/ Sat, 19 Oct 2024 09:43:13 +0000 Vermont Electrical Safety Rules
Published By Publication Date Number of Pages
VT 2014 22
]]>
None

PDF Catalog

PDF Pages PDF Title
1 Cover
3 l. PURPOSE OF THE RULES
2. ADOPTION OF THE RULES
3. ELECTRICAL LICENSING
4 3.1. Master Electrician
3.2 Journeyman Electrician
5 3.3 Type-S Journeyman Electrician
6 3.4 Application; Examinations and Fees
3.5 Renewal of License
7 3.6 Revocation, suspension and refusal of renewal of license
4. DUTIES OF THE LICENSEE
8 5. ADOPTION OF NATIONALLY RECOGNIZED SAFETY STANDARDS
9 6. REFERENCE DOCUMENTS
10 7. WORK NOTICE, FEES, INSPECTION, ENERGIZING, INSTALLATIONS, CERTIFICATE OF COMPLETION
7.1 Work Notice
11 7.2 Work Notice Fees
7.3 Inspection
7.4 Energizing Installations
8. POWERS OF ENFORCEMENT
12 9. LICENSING DISCIPLINARY PROCEDURE
9.1 INITIATING A COMPLAINT AGAINST A LICENSE
9.2 Initiating the investigation
13 9.3 Recommended action
9.4 Formal hearing by the board
14 10. SEVERABILITY CLAUSE AND EFFECTIVE DATE
APPENDIX I –
26 VSA CHAPTER 15: ELECTRICIANS AND ELECTRICAL INSTALLATIONS
20 APPENDIX II –
ILLUMINATION OF MEANS OF EGRESS
22 APPENDIX III –
HOW TO OBTAIN STANDARDS AND REFERENCE DOCUMENTS
APPENDIX IV –
HOW TO CONTACT THE DIVISION OF FIRE SAFETY
]]>