{"id":111896,"date":"2024-10-18T16:18:08","date_gmt":"2024-10-18T16:18:08","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1303-2011\/"},"modified":"2024-10-24T22:03:00","modified_gmt":"2024-10-24T22:03:00","slug":"ieee-1303-2011","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1303-2011\/","title":{"rendered":"IEEE 1303 2011"},"content":{"rendered":"

Revision Standard – Active. General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1303\u2122-2011 Front Cover <\/td>\n<\/tr>\n
6<\/td>\nIntroduction
Notice to users
Laws and regulations
Copyrights
Updating of IEEE documents <\/td>\n<\/tr>\n
7<\/td>\nErrata
Interpretations
Patents <\/td>\n<\/tr>\n
8<\/td>\nParticipants <\/td>\n<\/tr>\n
10<\/td>\nContents <\/td>\n<\/tr>\n
11<\/td>\nIMPORTANT NOTICE:
1. Overview
1.1 Scope <\/td>\n<\/tr>\n
12<\/td>\n1.2 Purpose
2. Normative references <\/td>\n<\/tr>\n
13<\/td>\n3. Definitions and Acronyms
3.1 Definitions <\/td>\n<\/tr>\n
14<\/td>\n3.2 Acronyms <\/td>\n<\/tr>\n
15<\/td>\n4. Preparation of a field test program
4.1 Test program phases
4.2 Inspection and test plans (ITPs) <\/td>\n<\/tr>\n
18<\/td>\n5. Implementation of a field test program
5.1 Equipment tests <\/td>\n<\/tr>\n
22<\/td>\n5.2 Subsystem test <\/td>\n<\/tr>\n
26<\/td>\n5.3 System commissioning tests <\/td>\n<\/tr>\n
36<\/td>\n5.4 Acceptance tests <\/td>\n<\/tr>\n
41<\/td>\nAnnex A (informative) Bibliography <\/td>\n<\/tr>\n
43<\/td>\nAnnex B (normative) Coordination of valve and valve firing circuits <\/td>\n<\/tr>\n
48<\/td>\nAnnex C (informative) Staged fault tests
C.1 Typical staged fault method <\/td>\n<\/tr>\n
49<\/td>\nAnnex D (informative) Simulated fault tests <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Guide for Static Var Compensator Field Tests<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2011<\/td>\n49<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":111897,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-111896","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/111896","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/111897"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=111896"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=111896"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=111896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}