{"id":125424,"date":"2024-10-19T05:07:25","date_gmt":"2024-10-19T05:07:25","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1378-2022-2\/"},"modified":"2024-10-24T23:15:17","modified_gmt":"2024-10-24T23:15:17","slug":"ieee-1378-2022-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1378-2022-2\/","title":{"rendered":"IEEE 1378-2022"},"content":{"rendered":"
Revision Standard – Active. General guidelines for commissioning high-voltage direct-current (HVDC) converter stations and associated transmission systems are provided. These guidelines apply to HVDC systems utilizing 6-pulse or 12-pulse thyristor-valve converter units operated as a two-terminal HVDC transmission system or an HVDC back-to-back system.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1378\u2122-2022 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 1.3\u2002Word usage <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 1.4\u2002Limitations <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2.\u2002Normative references 3.\u2002Definitions, acronyms, and abbreviations 3.1\u2002Definitions 3.2\u2002Acronyms and abbreviations <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.\u2002General 4.1\u2002Overview <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.2\u2002Commissioning planning 4.3\u2002General test conditions 5.\u2002Commissioning plan 5.1\u2002Field test program <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.2\u2002Disturbance test schedule 5.3\u2002Commissioning test flow diagram 5.4\u2002Detailed test procedures <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.5\u2002Design documentation used <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.6\u2002Health, safety, and environment considerations 6.\u2002Commissioning plan implementation 6.1\u2002Equipment (pre-commissioning) tests <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.2\u2002Subsystem tests <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.3\u2002Converter station tests <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6.4\u2002HVDC transmission tests <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 7.\u2002Trial operation <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 7.1\u2002Preconditions 7.2\u2002Power scheduling operation 8.\u2002On-site acceptance <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 8.1\u2002Preconditions 8.2\u2002Steady-state ratings <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 8.3\u2002Disturbance tests <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 9.\u2002Final documentation 9.1\u2002Performance documentation 9.2\u2002As-built documentation <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 9.3\u2002Nonconformity reports <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Annex A Bibliography <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex B (informative) Off-site testing of HVDC control and protection system <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | B.1\u2002Routine and type tests B.2\u2002Steady-state performance tests <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | B.3\u2002Dynamic performance tests <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | B.4\u2002Functional performance tests <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Commissioning Line-Commutated Converter (LCC) High-Voltage Direct-Current (HVDC) Converter Stations and Associated Transmission Systems (Redline)<\/b><\/p>\n |