{"id":125490,"date":"2024-10-19T05:08:01","date_gmt":"2024-10-19T05:08:01","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/gsa-pbs-project-management-guide-n-a\/"},"modified":"2024-10-24T23:15:32","modified_gmt":"2024-10-24T23:15:32","slug":"gsa-pbs-project-management-guide-n-a","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/gsa\/gsa-pbs-project-management-guide-n-a\/","title":{"rendered":"GSA PBS Project Management Guide N\/A"},"content":{"rendered":"

None<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nProject Delivery Method – Design\/Build-Bridging <\/td>\n<\/tr>\n
2<\/td>\n2.0.0.0.0.0 Planning <\/td>\n<\/tr>\n
3<\/td>\n2.1.0.0.0.0 Pre-Project Planning (Overview) <\/td>\n<\/tr>\n
4<\/td>\n2.1.0.0.0.1 Pre-Project (Preliminary) Planning <\/td>\n<\/tr>\n
5<\/td>\n1.1.0.0.0.0.a Project Coordination <\/td>\n<\/tr>\n
6<\/td>\n1.1.1.0.0.0.a PMP: Assemble Project Team <\/td>\n<\/tr>\n
7<\/td>\n2.1.12.0.2.0 Existing Conditions Assessments <\/td>\n<\/tr>\n
8<\/td>\n2.1.10.0.0.0 Local Portfolio Plans <\/td>\n<\/tr>\n
9<\/td>\n2.1.1.0.0.0 Campus\/Facility Master Plans <\/td>\n<\/tr>\n
10<\/td>\n2.1.3.0.0.0 Building Engineering Report <\/td>\n<\/tr>\n
11<\/td>\n2.1.4.0.0.0 Accessibility Survey <\/td>\n<\/tr>\n
12<\/td>\n2.1.3.1.0.0 Fire\/Life Safety Study <\/td>\n<\/tr>\n
13<\/td>\n2.1.5.0.0.0 Hazardous Materials Survey <\/td>\n<\/tr>\n
14<\/td>\n2.1.6.0.0.0 Highest and Best Use Appraisal (R&A) <\/td>\n<\/tr>\n
15<\/td>\n2.1.8.0.0.0 Safety\/Security Study(ies) <\/td>\n<\/tr>\n
16<\/td>\n2.1.9.0.0.0 Energy Conservation Audit <\/td>\n<\/tr>\n
17<\/td>\n2.4.1.0.0.0.a Feasibility <\/td>\n<\/tr>\n
18<\/td>\n2.4.1.0.0.0.b Feasibility (Continued) <\/td>\n<\/tr>\n
19<\/td>\n6.3.0.0.0.0 CMa\/Commissioning Authority (Cx) Services <\/td>\n<\/tr>\n
20<\/td>\n6.1.0.0.0.0.a Project Consultant Task Order <\/td>\n<\/tr>\n
21<\/td>\n2.4.1.0.0.0.c Feasibility: R&A <\/td>\n<\/tr>\n
22<\/td>\n2.4.1.0.0.0.d Feasibility: New Construction <\/td>\n<\/tr>\n
23<\/td>\n2.4.1.0.0.0.e Feasibility: Lease Construction <\/td>\n<\/tr>\n
24<\/td>\n4.0.0.0.0.0.a Site Acquisition <\/td>\n<\/tr>\n
25<\/td>\n4.0.0.0.0.0.b Site Investigation Tasks for FS <\/td>\n<\/tr>\n
26<\/td>\n4.0.0.0.0.0.c Site Investigation for FS <\/td>\n<\/tr>\n
27<\/td>\n2.2.0.0.0.0 NHPA Tasks for FS through Site Acquisition <\/td>\n<\/tr>\n
28<\/td>\n2.3.0.0.0.0 NEPA Tasks for FS through Site Acquisition <\/td>\n<\/tr>\n
29<\/td>\n2.6.0.0.0.0 Relocation Planning <\/td>\n<\/tr>\n
30<\/td>\n1.1.2.0.0.0 Commissioning Authority (Cx) (Overview) <\/td>\n<\/tr>\n
31<\/td>\n1.1.1.0.0.0.b Project Management Plan (PMP) <\/td>\n<\/tr>\n
32<\/td>\n1.1.1.0.0.0.c Acquisition Plan Program\/Project <\/td>\n<\/tr>\n
33<\/td>\n1.1.1.0.0.0.d Procurement Snapshot <\/td>\n<\/tr>\n
34<\/td>\n1.1.1.0.0.0.e Procurement Snapshot (Continued) <\/td>\n<\/tr>\n
35<\/td>\n1.1.3.1.0.0 Initiate Project in PIP <\/td>\n<\/tr>\n
36<\/td>\n1.1.3.2.0.0 Project Updates in PIP <\/td>\n<\/tr>\n
37<\/td>\n1.1.5.0.0.0 Project Website(s) <\/td>\n<\/tr>\n
38<\/td>\n2.4.4.0.0.0 Project Funding Request 3.4.5.0.0.0 Budget Authorization Act (Congressional Approval) <\/td>\n<\/tr>\n
39<\/td>\n6.1.1.0.1.0 Courthouse Orientation and Design Start Workshop <\/td>\n<\/tr>\n
40<\/td>\n2.5.0.0.0.0 Program Development Study (PDS) <\/td>\n<\/tr>\n
41<\/td>\n3.4.0.0.0.0 Construction Authorization (Prospectus) <\/td>\n<\/tr>\n
42<\/td>\n6.0.0.0.0.0 Design <\/td>\n<\/tr>\n
43<\/td>\n4.1.0.0.0.0 Site Selection\/Technical Studies: NHPA and NEPA Process (Overview) <\/td>\n<\/tr>\n
44<\/td>\n4.2.0.0.0.0 Site Acquisition (Overview) <\/td>\n<\/tr>\n
45<\/td>\n6.2.0.0.0.0 A\/E Procurement (Overview) <\/td>\n<\/tr>\n
46<\/td>\n6.2.1.0.0.0.a A\/E Services Scope of Work (Overview) <\/td>\n<\/tr>\n
47<\/td>\n6.4.2.0.0.0 Source Selection Plan <\/td>\n<\/tr>\n
48<\/td>\n6.2.1.0.0.0.b Design Charrette (Optional) <\/td>\n<\/tr>\n
49<\/td>\n6.2.1.0.0.0.c Design Competition <\/td>\n<\/tr>\n
50<\/td>\n6.2.2.0.0.0, 6.2.4.0.0.0, and 6.2.5.0.0.0 A\/E Source Selection\/Evaluation Process <\/td>\n<\/tr>\n
51<\/td>\n6.2.6.0.0.0 A\/E Contract for Design <\/td>\n<\/tr>\n
52<\/td>\n6.3.1.0.0.0.a CMa Scope of Work <\/td>\n<\/tr>\n
53<\/td>\n6.3.1.0.0.0.b CxA Scope of Work (if apart from CMa) <\/td>\n<\/tr>\n
54<\/td>\n6.3.1.0.0.0.b CxA Scope of Work (if apart from CMa) <\/td>\n<\/tr>\n
55<\/td>\n6.1.0.0.0.0.b Art-in-Architecture Contract <\/td>\n<\/tr>\n
56<\/td>\n6.7.0.0.0.0 Concept Design (Overview) <\/td>\n<\/tr>\n
57<\/td>\n6.7.0.0.0.1.a Concept Design <\/td>\n<\/tr>\n
58<\/td>\n6.7.0.0.0.1.b Concept Design (Continued) <\/td>\n<\/tr>\n
59<\/td>\n6.7.2.0.0.0 Concept Design Partnering Workshop <\/td>\n<\/tr>\n
60<\/td>\n6.7.4.0.0.0 Design Charrette Documents <\/td>\n<\/tr>\n
61<\/td>\n6.7.7.0.0.0 Design Excellence Peer Review <\/td>\n<\/tr>\n
62<\/td>\n6.7.6.3.0.0 Concept Design Review Comments Including Concept Design Selection and 6.7.9.0.0.0 VE Workshop <\/td>\n<\/tr>\n
63<\/td>\n6.7.12.2.0.0 Concept Design Review Comments (Urban Design Review Boards) <\/td>\n<\/tr>\n
64<\/td>\n6.7.14.0.0.0 Final Concept Presentation to the Commissioner 6.7.15.0.0.0 Final Concept Approval Memorandum <\/td>\n<\/tr>\n
65<\/td>\n6.7.14.0.1.0 Art-in-Architecture Concept Design <\/td>\n<\/tr>\n
66<\/td>\n6.8.0.0.0.0 Design Development (Overview) <\/td>\n<\/tr>\n
67<\/td>\n6.8.0.0.0.1 Design Development (Process) <\/td>\n<\/tr>\n
68<\/td>\n6.8.0.0.0.2 Utility Rebate Program Review <\/td>\n<\/tr>\n
69<\/td>\n6.8.1.0.0.0 DD Program Review Workshop <\/td>\n<\/tr>\n
70<\/td>\n6.8.2.0.0.0 DD Systems Selection Analyses <\/td>\n<\/tr>\n
71<\/td>\n6.8.5.0.0.0 DD Submission (35%) <\/td>\n<\/tr>\n
72<\/td>\n6.8.9.0.0.0 Construction Strategy\/Phasing Plan <\/td>\n<\/tr>\n
73<\/td>\n6.8.11.0.0.0 Independent OCA PBS-P100 Review and IGE <\/td>\n<\/tr>\n
74<\/td>\n7.0.0.0.0.0 Construction <\/td>\n<\/tr>\n
75<\/td>\n6.10.0.0.0.0 Construction Procurement <\/td>\n<\/tr>\n
76<\/td>\n6.10.1.0.0.0 GC\/CC Source Selection Plan <\/td>\n<\/tr>\n
77<\/td>\n6.10.2.0.0.0 Advertisement for Construction Services <\/td>\n<\/tr>\n
78<\/td>\n6.10.4.0.0.0 Pre-Proposal Conference <\/td>\n<\/tr>\n
79<\/td>\n6.10.11.0.0.0 Proposal Document Addenda <\/td>\n<\/tr>\n
80<\/td>\n6.10.1.1.0.0 GC\/CC Selection Evaluation Factors (Phase I) 6.10.8.0.0.0 GC\/CC Evaluations\/Selection (Phase I) <\/td>\n<\/tr>\n
81<\/td>\n6.10.13.0.0.0 GC\/CC Evaluations\/Selection (Phase II) <\/td>\n<\/tr>\n
82<\/td>\n6.10.14.0.0.0 Construction Contract Award and 6.10.15.0.0.0 Pre-NTP Documents (Bonds, Insurance, Security, etc.) <\/td>\n<\/tr>\n
83<\/td>\n7.1.0.0.0.0 (0% to 100% Construction) <\/td>\n<\/tr>\n
84<\/td>\n7.1.1.0.0.0 Notice To Proceed <\/td>\n<\/tr>\n
85<\/td>\n6.9.0.0.0.0 Construction Documents <\/td>\n<\/tr>\n
86<\/td>\n6.9.3.0.0.0 CD Program Review Workshop (CD Start) 6.9.10.0.0.0 CD Program Review Workshop (90%) <\/td>\n<\/tr>\n
87<\/td>\n6.7.13.0.0.0 Independent OCA PBS-P100 Review 6.7.13.0.0.0 Independent OCA PBS-P100 Review <\/td>\n<\/tr>\n
88<\/td>\n6.7.12.0.0.0 CMa’s CD Review\/Estimate (100% CDs) <\/td>\n<\/tr>\n
89<\/td>\n6.10.16.0.0.0 Professional Services Task Orders (Construction) <\/td>\n<\/tr>\n
90<\/td>\n7.1.4.0.0.0 Art-in-Architecture Fabrication Task Order <\/td>\n<\/tr>\n
91<\/td>\n7.1.2.0.0.0 Construction Kick-off Meeting <\/td>\n<\/tr>\n
92<\/td>\n7.1.3.0.0.0.a Partnering Session <\/td>\n<\/tr>\n
93<\/td>\n7.1.3.0.0.0.b Partnering Session: Timing Benefits and Drawbacks <\/td>\n<\/tr>\n
94<\/td>\n7.1.5.0.0.0 Groundbreaking\/Construction Start <\/td>\n<\/tr>\n
95<\/td>\n7.1.6.0.0.0.a Construction Administration <\/td>\n<\/tr>\n
96<\/td>\n7.1.6.0.0.0.b Construction Administration (Overview) <\/td>\n<\/tr>\n
97<\/td>\n7.1.6.0.0.1.a Construction Administration: Safety <\/td>\n<\/tr>\n
98<\/td>\n7.1.6.0.0.1.b Construction Administration: Project Cost Management <\/td>\n<\/tr>\n
99<\/td>\n7.1.6.0.0.1.c Requests for Information (RFI) <\/td>\n<\/tr>\n
100<\/td>\n7.1.6.2.0.0 Construction Schedules <\/td>\n<\/tr>\n
101<\/td>\n7.1.6.4.0.0 Submittal Schedule\/Log\/Submissions <\/td>\n<\/tr>\n
102<\/td>\n7.1.2.0.1.2 Quality Assurance Quality Control Plans\/Reports (QAQC Review Process) <\/td>\n<\/tr>\n
103<\/td>\n7.1.6.5.0.0 Inspections and Testing Schedule <\/td>\n<\/tr>\n
104<\/td>\n7.1.6.6.0.0 Special Testing\/Mock-up Plans\/Reports <\/td>\n<\/tr>\n
105<\/td>\n7.1.6.1.1.1 Project Web-Cam <\/td>\n<\/tr>\n
106<\/td>\n7.1.6.8.0.0 GC\/CC Contract Modifications <\/td>\n<\/tr>\n
107<\/td>\n7.1.9.0.0.0 GC\/CC Evaluations (NIH) <\/td>\n<\/tr>\n
108<\/td>\n7.1.7.0.0.0 CII Benchmarking <\/td>\n<\/tr>\n
109<\/td>\n7.1.10.0.0.0 Follow-up Partnering Session <\/td>\n<\/tr>\n
110<\/td>\n7.1.8.0.0.0 Construction Excellence Peer Review (1st) 7.1.11.0.0.0 Construction Excellence Peer Review (2nd) <\/td>\n<\/tr>\n
111<\/td>\n7.1.12.0.0.0 Art-In-Architecture Deliverable <\/td>\n<\/tr>\n
112<\/td>\n7.1.13.0.0.0 Additional Phases Delivery (TI, Phases, Annexes) <\/td>\n<\/tr>\n
113<\/td>\n7.1.14.0.0.0 Turnover Documents <\/td>\n<\/tr>\n
114<\/td>\n7.1.14.3.0.0 O&M Manuals Submittal <\/td>\n<\/tr>\n
115<\/td>\n7.1.14.4.0.0 Warranties and Certifications <\/td>\n<\/tr>\n
116<\/td>\n7.1.14.6.0.0 Material Samples, Attic Stock and Spare Parts <\/td>\n<\/tr>\n
117<\/td>\n7.1.14.7.0.0 Contractor Record Drawings <\/td>\n<\/tr>\n
118<\/td>\n7.1.14.2.0.0 Systems Start-Up and Testing (Commissioning) <\/td>\n<\/tr>\n
119<\/td>\n7.1.14.5.0.0 Property Management Training <\/td>\n<\/tr>\n
120<\/td>\n7.1.15.0.0.0.a Substantial Completion Certification <\/td>\n<\/tr>\n
121<\/td>\n7.1.15.0.0.0.b Substantial Completion Certificate:Final Cleaning <\/td>\n<\/tr>\n
122<\/td>\n7.1.16.0.0.0 Occupancy Permit <\/td>\n<\/tr>\n
123<\/td>\n7.1.14.1.0.0.a Final Inspections <\/td>\n<\/tr>\n
124<\/td>\n7.1.14.1.0.0.b Punch Lists <\/td>\n<\/tr>\n
125<\/td>\n7.1.15.0.0.0.c Substantial Completion Certificate: Final Completion <\/td>\n<\/tr>\n
126<\/td>\n7.2.0.0.0.0 Closeout (Admin) <\/td>\n<\/tr>\n
127<\/td>\n8.3.4.0.1.2 Maintenance and Cleaning Contracts (GC\/CC Option) <\/td>\n<\/tr>\n
128<\/td>\n7.2.1.0.0.0 A\/E Record Documents <\/td>\n<\/tr>\n
129<\/td>\n7.2.2.0.0.0 Updated PBS CAD Library Submission <\/td>\n<\/tr>\n
130<\/td>\n7.2.4.0.0.0 Dedication Ceremony Documents <\/td>\n<\/tr>\n
131<\/td>\n7.2.5.0.0.0 Project Awards (LEED, EnergyStar, AiA, PM, etc.) <\/td>\n<\/tr>\n
132<\/td>\n7.2.3.1.0.0 Contract Closeout (GC\/CC) <\/td>\n<\/tr>\n
133<\/td>\n7.2.3.2.1.0 Project Management Closeout <\/td>\n<\/tr>\n
134<\/td>\n7.2.3.2.0.0 Financial Closeout <\/td>\n<\/tr>\n
135<\/td>\n8.1.3.0.1.0 Real Property Acquisition Advice (GSA Form 1011) <\/td>\n<\/tr>\n
136<\/td>\n8.0.0.0.0.0 Tenant Occupancy <\/td>\n<\/tr>\n
137<\/td>\n8.1.0.0.0.0 Occupancy Agreements and RENT (Overview) <\/td>\n<\/tr>\n
138<\/td>\n8.1.1.2.2.0.a Occupancy Agreement Planning Phase (Initial Draft) <\/td>\n<\/tr>\n
139<\/td>\n8.1.1.3.0.0 Occupancy Agreement based on PDS-(Proposed Draft)\/Updates <\/td>\n<\/tr>\n
140<\/td>\n8.1.1.4.0.0 Concept Design 8.1.1.4.1.0 Design Development 8.1.1.4.2.0 Mid-Point Construction Documents 8.1.1.4.2.0 Mid-Point Construction Documents <\/td>\n<\/tr>\n
141<\/td>\n8.1.1.2.2.0.b Occupancy Agreement (Accepted Draft): Before Construction Award <\/td>\n<\/tr>\n
142<\/td>\n8.1.1.3.1.0 Occupancy Agreement (Accepted Draft): During Construction <\/td>\n<\/tr>\n
143<\/td>\n8.1.1.5.0.1 Final Occupancy Agreement <\/td>\n<\/tr>\n
144<\/td>\n8.1.1.5.0.0 Final Occupancy Agreement (Reconciliation) <\/td>\n<\/tr>\n
145<\/td>\n8.1.2.0.0.0 National CAD\/CIFM Standards <\/td>\n<\/tr>\n
146<\/td>\n8.1.3.0.0.0 Initial RENT Start <\/td>\n<\/tr>\n
147<\/td>\n8.2.0.0.0.0 Furniture, Fixtures, and Equipment (FFE)\/Move-In (Overview) <\/td>\n<\/tr>\n
148<\/td>\n8.2.1.0.0.0 Systems Furniture <\/td>\n<\/tr>\n
149<\/td>\n8.2.2.0.0.0.a Telecommunications Installation – R& <\/td>\n<\/tr>\n
150<\/td>\n8.2.2.0.0.0.b Telecommunications Installation – New Construction <\/td>\n<\/tr>\n
151<\/td>\n8.2.3.0.0.0 Agency IT\/Data Systems <\/td>\n<\/tr>\n
152<\/td>\n8.2.4.0.0.0 Security Systems Installation <\/td>\n<\/tr>\n
153<\/td>\n8.2.5.0.0.0 USMS A\/V and Security Systems Installation <\/td>\n<\/tr>\n
154<\/td>\n8.2.6.0.0.0 Tenant Move-In <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

GSA PBS Project Management Guide<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
GSA<\/b><\/a><\/td>\nN\/A<\/td>\n154<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":125491,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2798],"product_tag":[],"class_list":{"0":"post-125490","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-gsa","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/125490","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/125491"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=125490"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=125490"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=125490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}