{"id":139775,"date":"2024-10-19T08:06:34","date_gmt":"2024-10-19T08:06:34","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/wa-washingtonstateenergycode-2012\/"},"modified":"2024-10-25T00:19:51","modified_gmt":"2024-10-25T00:19:51","slug":"wa-washingtonstateenergycode-2012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/wa\/wa-washingtonstateenergycode-2012\/","title":{"rendered":"WA WashingtonStateEnergyCode 2012"},"content":{"rendered":"

This is a fully integrated code based on the 2012 International Energy Code. Effective date: July 1, 2014<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\n2012 WASHINGTON STATE ENERGY CODE BASED ON THE 2012 INTERNATIONAL ENERGY CONSERVATION CODE\u00ae <\/td>\n<\/tr>\n
2<\/td>\nCOPYRIGHT <\/td>\n<\/tr>\n
3<\/td>\nPREFACE <\/td>\n<\/tr>\n
6<\/td>\nWASHINGTON STATE PREFACE <\/td>\n<\/tr>\n
9<\/td>\nEFFECTIVE USE OF THE INTERNATIONAL ENERGY CONSERVATION CODE <\/td>\n<\/tr>\n
11<\/td>\nLEGISLATION <\/td>\n<\/tr>\n
13<\/td>\nTABLE OF CONTENTS <\/td>\n<\/tr>\n
15<\/td>\nIECC\u2014COMMERCIAL PROVISIONS
TABLE OF CONTENTS <\/td>\n<\/tr>\n
17<\/td>\nCHAPTER 1 [CE] SCOPE AND ADMINISTRATION
SECTION C101 SCOPE AND GENERAL REQUIREMENTS <\/td>\n<\/tr>\n
18<\/td>\nTABLE C101.4.3.2 ECONOMIZER COMPLIANCE OPTIONS FOR MECHANICAL ALTERATIONS <\/td>\n<\/tr>\n
19<\/td>\nTABLE C101.4.3.2\u2014continued ECONOMIZER COMPLIANCE OPTIONS FOR MECHANICAL ALTERATIONS <\/td>\n<\/tr>\n
20<\/td>\nSECTION C102 ALTERNATE MATERIALS\u2014METHOD OF CONSTRUCTION, DESIGN OR INSULATING SYSTEMS <\/td>\n<\/tr>\n
21<\/td>\nSECTION C103 CONSTRUCTION DOCUMENTS
SECTION C104 INSPECTIONS <\/td>\n<\/tr>\n
22<\/td>\nSECTION C105 VALIDITY
SECTION C106 REFERENCED STANDARDS
SECTION C107 FEES <\/td>\n<\/tr>\n
23<\/td>\nSECTION C108 STOP WORK ORDER
SECTION C109 BOARD OF APPEALS
SECTION C110 VIOLATIONS
SECTION C111 LIABILITY <\/td>\n<\/tr>\n
25<\/td>\nCHAPTER 2 [CE] DEFINITIONS
SECTION C201 GENERAL
SECTION C202 GENERAL DEFINITIONS <\/td>\n<\/tr>\n
27<\/td>\nFIGURE C202.1 DAYLIGHT ZONE <\/td>\n<\/tr>\n
31<\/td>\nCHAPTER 3 [CE] GENERAL REQUIREMENTS
SECTION C301 CLIMATE ZONES
TABLE C301.1 CLIMATE ZONES, MOISTURE REGIMES, AND WARM-HUMID DESIGNATIONS BY STATE AND COUNTY
SECTION C302 DESIGN CONDITIONS
SECTION C303 MATERIALS, SYSTEMS AND EQUIPMENT <\/td>\n<\/tr>\n
32<\/td>\nTABLE C303.1.3(1) DEFAULT GLAZED FENESTRATION U-FACTOR
TABLE C303.1.3(2) DEFAULT DOOR U-FACTORS
TABLE C303.1.3(3) DEFAULT GLAZED FENESTRATION SHGC AND VT <\/td>\n<\/tr>\n
33<\/td>\nTABLE C303.1.3(4) DEFAULT U-FACTORS FOR SKYLIGHTSa, b, c, d <\/td>\n<\/tr>\n
34<\/td>\nTABLE C303.1.3(5) SMALL BUSINESS COMPLIANCE TABLE DEFAULT U-FACTORS FOR VERTICAL FENESTRATION <\/td>\n<\/tr>\n
35<\/td>\nCHAPTER 4 [CE] COMMERCIAL ENERGY EFFICIENCY
SECTION C401 GENERAL
SECTION C402 BUILDING ENVELOPE REQUIREMENTS <\/td>\n<\/tr>\n
36<\/td>\nTABLE C402.1.2 OPAQUE THERMAL ENVELOPE ASSEMBLY REQUIREMENTSa <\/td>\n<\/tr>\n
37<\/td>\nEQUATION C402-1 TARGET UAt <\/td>\n<\/tr>\n
38<\/td>\nEQUATION C402-1\u2014continued TARGET UAT <\/td>\n<\/tr>\n
39<\/td>\nEQUATION C402-2 PROPOSED UAP <\/td>\n<\/tr>\n
40<\/td>\nEQUATION C402-3 TARGET SHGCAt
EQUATION C402-4 PROPOSED SHGCAP
TABLE C402.2 OPAQUE THERMAL ENVELOPE REQUIREMENTSa, f <\/td>\n<\/tr>\n
41<\/td>\nTABLE C402.2 OPAQUE THERMAL ENVELOPE REQUIREMENTSa, f\u2014continued <\/td>\n<\/tr>\n
42<\/td>\nTABLE C402.2.1.1 MINIMUM ROOF REFLECTANCE AND EMITTANCE OPTIONSa <\/td>\n<\/tr>\n
43<\/td>\nTABLE C402.3 BUILDING ENVELOPE REQUIREMENTS\u2014FENESTRATION <\/td>\n<\/tr>\n
44<\/td>\nEQUATION C4-1
EQUATION C4-2
TABLE C402.3.3.1 SHGC ADJUSTMENT MULTIPLIERS <\/td>\n<\/tr>\n
46<\/td>\nTABLE C402.4.3 MAXIMUM AIR INFILTRATION RATE FOR FENESTRATION ASSEMBLIES <\/td>\n<\/tr>\n
48<\/td>\nSECTION C403 MECHANICAL SYSTEMS
EQUATION C4-3 <\/td>\n<\/tr>\n
49<\/td>\nEQUATION C4-4 <\/td>\n<\/tr>\n
50<\/td>\nTABLE C403.2.3(1)A MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS <\/td>\n<\/tr>\n
51<\/td>\nTABLE C403.2.3(1)A\u2014continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS <\/td>\n<\/tr>\n
52<\/td>\nTABLE C403.2.3(1)B MINIMUM EFFICIENCY REQUIREMENTS: AIR CONDITIONERS AND CONDENSING UNITS SERVING COMPUTER ROOMS <\/td>\n<\/tr>\n
53<\/td>\nTABLE C403.2.3(1)C MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED VARIABLE REFRIGERANT FLOW AIR CONDITIONERS
TABLE C403.2.3(1)D MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED VARIABLE REFRIGERANT FLOW AIR-TO-AIR AND APPLIED HEAT PUMPS <\/td>\n<\/tr>\n
54<\/td>\nTABLE C403.2.3(1)D\u2014continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED VARIABLE REFRIGERANT FLOW AIR-TO-AIR AND APPLIED HEAT PUMPS <\/td>\n<\/tr>\n
55<\/td>\nTABLE C403.2.3(2) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS <\/td>\n<\/tr>\n
56<\/td>\nTABLE C403.2.3(2)\u2014continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS <\/td>\n<\/tr>\n
57<\/td>\nTABLE C403.2.3(3) MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED PACKAGED TERMINAL AIR CONDITIONERS, PACKAGED TERMINAL HEAT PUMPS, SINGLE-PACKAGE VERTICAL AIR CONDITIONERS, SINGLE-PACKAGE VERTICAL HEAT PUMPS, ROOM AIR CONDITIONERS AND ROOM AIR-CONDITIONER HEAT PUMPS <\/td>\n<\/tr>\n
58<\/td>\nTABLE C403.2.3(3)\u2014continued MINIMUM EFFICIENCY REQUIREMENTS: ELECTRICALLY OPERATED PACKAGED TERMINAL AIR CONDITIONERS, PACKAGED TERMINAL HEAT PUMPS, SINGLE-PACKAGE VERTICAL AIR CONDITIONERS, SINGLE VERTICAL HEAT PUMPS, ROOM AIR CONDITIONERS AND ROOM AIR-CONDITIONER HEAT PUMPS <\/td>\n<\/tr>\n
59<\/td>\nTABLE 403.2.3(4) WARM AIR FURNACES AND COMBINATION WARM AIR FURNACES\/AIR-CONDITIONING UNITS, WARM AIR DUCT FURNACES AND UNIT HEATERS, MINIMUM EFFICIENCY REQUIREMENTS <\/td>\n<\/tr>\n
60<\/td>\nTABLE C403.2.3(5) MINIMUM EFFICIENCY REQUIREMENTS: GAS- AND OIL-FIRED BOILERS
TABLE C403.2.3(6) RESERVED <\/td>\n<\/tr>\n
61<\/td>\nTABLE C403.2.3(7) MINIMUM EFFICIENCY REQUIREMENTS: WATER CHILLING PACKAGESa <\/td>\n<\/tr>\n
62<\/td>\nTABLE C403.2.3(8) MINIMUM EFFICIENCY REQUIREMENTS: HEAT REJECTION EQUIPMENT
TABLE C403.2.3(9) HEAT TRANSFER EQUIPMENT <\/td>\n<\/tr>\n
66<\/td>\nTABLE C403.2.6 ENERGY RECOVERY REQUIREMENT <\/td>\n<\/tr>\n
67<\/td>\nEQUATION C4-5 <\/td>\n<\/tr>\n
68<\/td>\nTABLE C403.2.8 MINIMUM PIPE INSULATION THICKNESS (thickness in inches)a, c
TABLE C403.2.10.1(1) FAN POWER LIMITATION <\/td>\n<\/tr>\n
69<\/td>\nTABLE C403.2.10.1(2) FAN POWER LIMITATION PRESSURE DROP ADJUSTMENT <\/td>\n<\/tr>\n
71<\/td>\nTABLE C403.3.1(1) RESERVED
TABLE C403.3.1(2) EQUIPMENT EFFICIENCY PERFORMANCE EXCEPTION FOR ECONOMIZERS <\/td>\n<\/tr>\n
72<\/td>\nTABLE C403.3.1.1.3(1) HIGH-LIMIT SHUTOFF CONTROL OPTIONS FOR AIR ECONOMIZERS
TABLE C403.3.1.1.3(2) HIGH-LIMIT SHUTOFF CONTROL SETTING FOR AIR ECONOMIZERS <\/td>\n<\/tr>\n
73<\/td>\nEXCEPTION 5 TABLE <\/td>\n<\/tr>\n
77<\/td>\nTABLE C403.4.7 MAXIMUM HOT GAS BYPASS CAPACITY
SECTION C404 SERVICE WATER HEATING (MANDATORY) <\/td>\n<\/tr>\n
78<\/td>\nTABLE C404.2 MINIMUM PERFORMANCE OF WATER-HEATING EQUIPMENT <\/td>\n<\/tr>\n
79<\/td>\nSECTION C405 ELECTRICAL POWER AND LIGHTING SYSTEMS <\/td>\n<\/tr>\n
82<\/td>\nTABLE C405.5.2(1) INTERIOR LIGHTING POWER ALLOWANCES: BUILDING AREA METHOD <\/td>\n<\/tr>\n
83<\/td>\nTABLE C405.5.2(2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
TABLE C405.5.2(2)\u2014continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD <\/td>\n<\/tr>\n
84<\/td>\nTABLE C405.5.2(2)\u2014continued INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD
TABLE C405.6.2(1) EXTERIOR LIGHTING ZONES <\/td>\n<\/tr>\n
85<\/td>\nTABLE C405.6.2(2) INDIVIDUAL LIGHTING POWER ALLOWANCES FOR BUILDING EXTERIORS <\/td>\n<\/tr>\n
86<\/td>\nSECTION C406 ADDITIONAL EFFICIENCY PACKAGE OPTIONS
SECTION C407 TOTAL BUILDING PERFORMANCE <\/td>\n<\/tr>\n
88<\/td>\nTABLE C407.5.1(1) SPECIFICATIONS FOR THE STANDARD REFERENCE AND PROPOSED DESIGNS <\/td>\n<\/tr>\n
89<\/td>\nTABLE C407.5.1(1)\u2014continued SPECIFICATIONS FOR THE STANDARD REFERENCE AND PROPOSED DESIGNS <\/td>\n<\/tr>\n
90<\/td>\nTABLE C407.5.1(1)\u2014continued SPECIFICATIONS FOR THE STANDARD REFERENCE AND PROPOSED DESIGNS <\/td>\n<\/tr>\n
91<\/td>\nTABLE C407.5.1(2) HVAC SYSTEMS MAP <\/td>\n<\/tr>\n
92<\/td>\nTABLE C407.5.1(3) SPECIFICATIONS FOR THE STANDARD REFERENCE DESIGN HVAC SYSTEM DESCRIPTIONS <\/td>\n<\/tr>\n
93<\/td>\nTABLE C407.5.1(4) NUMBER OF CHILLERS
TABLE C407.5.1(5) WATER CHILLER TYPES <\/td>\n<\/tr>\n
94<\/td>\nSECTION C408 SYSTEM COMMISSIONING <\/td>\n<\/tr>\n
95<\/td>\nFIGURE C408.1.2.1 COMMISSIONING COMPLIANCE CHECKLIST <\/td>\n<\/tr>\n
97<\/td>\nSECTION C409 ENERGY METERING AND ENERGY CONSUMPTION MANAGEMENT <\/td>\n<\/tr>\n
101<\/td>\nCHAPTER 5 [CE] REFERENCED STANDARDS
AAMA
AHAM
AHRI <\/td>\n<\/tr>\n
102<\/td>\nAMCA
ANSI
ASHRAE
ASME <\/td>\n<\/tr>\n
103<\/td>\nASTM
CSA
CTI
DASMA <\/td>\n<\/tr>\n
104<\/td>\nDOE
IAPMO
ICC
IESNA <\/td>\n<\/tr>\n
105<\/td>\nISO
NEMA
NFRC
SMACNA
UL <\/td>\n<\/tr>\n
106<\/td>\nUS-FTC
WDMA <\/td>\n<\/tr>\n
107<\/td>\nINDEX [CE] <\/td>\n<\/tr>\n
115<\/td>\nIECC\u2014RESIDENTIAL PROVISIONS
TABLE OF CONTENTS <\/td>\n<\/tr>\n
117<\/td>\nCHAPTER 1 [RE] SCOPE AND ADMINISTRATION
PART 1\u2014SCOPE AND APPLICATION
SECTION R101 SCOPE AND GENERAL REQUIREMENTS <\/td>\n<\/tr>\n
118<\/td>\nSECTION R102 ALTERNATE MATERIALS\u2014METHOD OF CONSTRUCTION, DESIGN OR INSULATING SYSTEMS
PART 2\u2014ADMINISTRATION AND ENFORCEMENT
SECTION R103 CONSTRUCTION DOCUMENTS <\/td>\n<\/tr>\n
119<\/td>\nSECTION R104 INSPECTIONS
SECTION R105 VALIDITY
SECTION R106 REFERENCED STANDARDS <\/td>\n<\/tr>\n
120<\/td>\nSECTION R107 FEES
SECTION R108 STOP WORK ORDER
SECTION R109 BOARD OF APPEALS
SECTION R110 VIOLATIONS
SECTION R111 LIABILITY <\/td>\n<\/tr>\n
121<\/td>\nCHAPTER 2 [RE] DEFINITIONS
SECTION R201 GENERAL
SECTION R202 GENERAL DEFINITIONS <\/td>\n<\/tr>\n
125<\/td>\nCHAPTER 3 [RE] GENERAL REQUIREMENTS
SECTION R301 CLIMATE ZONES
TABLE R301.1 CLIMATE ZONES, MOISTURE REGIMES, AND WARM HUMID DESIGNATIONS BY STATE AND COUNTY
SECTION R302 DESIGN CONDITIONS
SECTION R303 MATERIALS, SYSTEMS AND EQUIPMENT <\/td>\n<\/tr>\n
126<\/td>\nTABLE R303.1.3(1) DEFAULT GLAZED FENESTRATION U-FACTOR
TABLE R303.1.3(2) DEFAULT DOOR U-FACTORS
TABLE R303.1.3(3) DEFAULT GLAZED FENESTRATION SHGC AND VT <\/td>\n<\/tr>\n
127<\/td>\nTABLE R303.1.3(4) DEFAULT U-FACTORS FOR SKYLIGHTSa, b, c, d <\/td>\n<\/tr>\n
128<\/td>\nTABLE R303.1.3(5) SMALL BUSINESS COMPLIANCE TABLE DEFAULT U-FACTORS FOR VERTICAL FENESTRATION <\/td>\n<\/tr>\n
129<\/td>\nCHAPTER 4 [RE] RESIDENTIAL ENERGY EFFICIENCY
SECTION R401 GENERAL
SECTION R402 BUILDING THERMAL ENVELOPE
TABLE R402.1.1 INSULATION AND FENESTRATION REQUIREMENTS BY COMPONENTa <\/td>\n<\/tr>\n
130<\/td>\nTABLE R402.1.3 EQUIVALENT U-FACTORSa <\/td>\n<\/tr>\n
132<\/td>\nTABLE R402.4.1.1 AIR BARRIER AND INSULATION INSTALLATION <\/td>\n<\/tr>\n
133<\/td>\nTABLE R402.4.1.1\u2014continued AIR BARRIER AND INSULATION INSTALLATION
SECTION R403 SYSTEMS <\/td>\n<\/tr>\n
135<\/td>\nTABLE R403.5.1 MECHANICAL VENTILATION SYSTEM FAN EFFICACY
SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS (MANDATORY)
SECTION R405 SIMULATED PERFORMANCE ALTERNATIVE (PERFORMANCE) <\/td>\n<\/tr>\n
137<\/td>\nTABLE R405.5.2(1) SPECIFICATIONS FOR THE STANDARD REFERENCE AND PROPOSED DESIGNS <\/td>\n<\/tr>\n
138<\/td>\nTABLE R405.5.2(1)\u2014continued SPECIFICATIONS FOR THE STANDARD REFERENCE AND PROPOSED DESIGNS <\/td>\n<\/tr>\n
139<\/td>\nTABLE R405.5.2(1)\u2014continued SPECIFICATIONS FOR THE STANDARD REFERENCE AND PROPOSED DESIGNS
TABLE R405.5.2(2) DEFAULT DISTRIBUTION SYSTEM EFFICIENCIES FOR PROPOSED DESIGNSa
SECTION R406 ADDITIONAL ENERGY EFFICIENCY REQUIREMENTS <\/td>\n<\/tr>\n
140<\/td>\nTABLE R406.2 ENERGY CREDITS (DEBITS) <\/td>\n<\/tr>\n
141<\/td>\nTABLE R406.2\u2014continued ENERGY CREDITS (DEBITS) <\/td>\n<\/tr>\n
142<\/td>\nTABLE R406.2\u2014continued ENERGY CREDITS (DEBITS) <\/td>\n<\/tr>\n
143<\/td>\nCHAPTER 5 [RE] REFERENCED STANDARDS
AAMA
ACCA
ASHRAE
ASME <\/td>\n<\/tr>\n
144<\/td>\nASTM
CSA
ICC
NEEA
NFRC <\/td>\n<\/tr>\n
145<\/td>\nUS-FTC
WDMA
WSU <\/td>\n<\/tr>\n
147<\/td>\nINDEX [RE] <\/td>\n<\/tr>\n
153<\/td>\nCHAPTER 51-11C WAC WASHINGTON STATE ENERGY CODE, APPENDIX CHAPTERS
TABLE OF CONTENTS <\/td>\n<\/tr>\n
157<\/td>\nAPPENDIX A DEFAULT HEAT LOSS COEFFICIENTS
SECTION A101 GENERAL REQUIREMENTS
A101.1 SCOPE
A101.2 DESCRIPTION
A101.3 AIR FILMS
A101.4 COMPRESSION OF INSULATION
TABLE A101.4 R-VALUE OF FIBERGLASS BATTS COMPRESSED WITHIN VARIOUS DEPTH CAVITIES
A101.5 BUILDING MATERIALS <\/td>\n<\/tr>\n
158<\/td>\nTABLE A101.5 DEFAULT R-VALUES FOR BUILDING MATERIALS <\/td>\n<\/tr>\n
159<\/td>\nSECTION A102 CEILINGS
A102.1 GENERAL
A102.1.1 METAL-FRAMED CEILINGS
A102.2 COMPONENT DESCRIPTION
A102.2.1 CEILINGS BELOW A VENTED ATTIC
A102.2.2 VAULTED CEILINGS
A102.2.3 ROOF DECKS
A102.2.4 METAL TRUSS FRAMING <\/td>\n<\/tr>\n
160<\/td>\nTABLE A102.1 DEFAULT U-FACTORS FOR CEILINGS
TABLE A102.2.4(1) STEEL TRUSSa FRAMED CEILING UO <\/td>\n<\/tr>\n
161<\/td>\nTABLE A102.2.4(2) STEEL TRUSSa FRAMED CEILING UO WITH R-3 SHEATHINGb
TABLE A102.2.4(3) STEEL TRUSSa FRAMED CEILING UO WITH R-5 SHEATHINGb
TABLE A102.2.4(4) STEEL TRUSSa FRAMED CEILING UO WITH R-10 SHEATHINGb
TABLE A102.2.4(5) STEEL TRUSSa FRAMED CEILING UO WITH R-15 SHEATHINGb <\/td>\n<\/tr>\n
162<\/td>\nA102.2.5 METAL BUILDING ROOF
A102.2.5.1 SINGLE LAYER
A102.2.5.2 DOUBLE LAYER
A102.2.5.3 CONTINUOUS INSULATION
A102.2.5.4 LINER SYSTEM (Ls)
A102.2.5.5 FILLED CAVITY
A102.2.6 ROOFS WITH INSULATION ENTIRELY ABOVE DECK (UNINTERRUPTED BY FRAMING)
SECTION A103 ABOVE-GRADE WALLS
A103.1 GENERAL
A103.2 FRAMING DESCRIPTION
A103.2.1 STANDARD
A103.2.2 INTERMEDIATE <\/td>\n<\/tr>\n
163<\/td>\nTABLE A102.2.5 DEFAULT U-FACTORS FOR METAL BUILDING ROOFS
A103.2.3 ADVANCED <\/td>\n<\/tr>\n
164<\/td>\nTABLE A102.2.6 ASSEMBLY U-FACTORS FOR ROOFS WITH INSULATION ENTIRELY ABOVE DECK (UNINTERRUPTED BY FRAMING) <\/td>\n<\/tr>\n
165<\/td>\nA103.3 COMPONENT DESCRIPTION
A103.3.1 SINGLE-STUD WALL
TABLE A103.3.1(1) 2 x 4 SINGLE WOOD STUD: R-11 BATT
TABLE A103.3.1(2) 2 x 4 SINGLE WOOD STUD: R-13 BATT <\/td>\n<\/tr>\n
166<\/td>\nTABLE A103.3.1(3) 2 x 4 SINGLE WOOD STUD: R-15 BATT
TABLE A103.3.1(4) 2 x 6 SINGLE WOOD STUD: R-19 BATT <\/td>\n<\/tr>\n
167<\/td>\nTABLE A103.3.1(5) 2 x 6 SINGLE WOOD STUD: R-21 BATT
TABLE A103.3.1(6) 2 x 6 SINGLE WOOD STUD: R-22 BATT <\/td>\n<\/tr>\n
168<\/td>\nTABLE A103.3.1(7) 2 x 6 SINGLE WOOD STUD: TWO R-11 BATTS
TABLE A103.3.1(8) 2 x 8 SINGLE STUD: R-25 BATT <\/td>\n<\/tr>\n
169<\/td>\nA103.3.2 STRAP WALL
TABLE A103.3.2 2 x 6: STRAP WALL
A103.3.3 DOUBLE STUD WALL
TABLE A103.3.3(1) 2 x 6 + 2 x 4: DOUBLE WOOD STUD
TABLE A103.3.3(2) 2 x 4 + 2 x 4: DOUBLE WOOD STUD
A103.3.4 LOG WALL
TABLE A103.3.4 LOG WALLS
A103.3.5 STRESS-SKIN PANEL
TABLE A103.3.5 STRESS SKIN PANEL <\/td>\n<\/tr>\n
170<\/td>\nA103.3.6 METAL STUD WALLS
TABLE A103.3.6.1(1) OVERALL ASSEMBLY U-FACTORS FOR METAL STUD WALLS WITH CONTINUOUS INSULATION
A103.3.6.1 METAL STUD WALL, OVERALL ASSEMBLY U-FACTORS <\/td>\n<\/tr>\n
171<\/td>\nTABLE A103.3.6.1(2) OVERALL ASSEMBLY U-FACTORS FOR METAL STUD WALLS WITH INSULATION SUPPORTED BY Z-FURRING <\/td>\n<\/tr>\n
172<\/td>\nA103.3.6.2 METAL STUD WALL, EFFECTICE R-VALUES FOR METAL FRAMING AND CAVITY ONLY
TABLE A103.3.6.2 EFFECTIVE R-VALUES FOR METAL FRAMING AND CAVITY ONLY
A103.3.6.3 METAL BUILDING WALL
TABLE A103.3.6.3 DEFAULT METAL BUILDING WALL U-FACTORS
A103.3.7 CONCRETE AND MASONRY WALLS
A103.3.7.1 CONCRETE MASONRY WALLS
A103.3.7.2 PERIPHERAL EDGES OF INTERMEDIATE CONCRETE FLOORS <\/td>\n<\/tr>\n
173<\/td>\nTABLE A103.3.7.1(1) DEFAULT U-FACTORS FOR CONCRETE AND MASONRY WALLS <\/td>\n<\/tr>\n
174<\/td>\nTABLE A103.3.7.1(1)\u2014continued DEFAULT U-FACTORS FOR CONCRETE AND MASONRY WALLSa, b, c, d, e <\/td>\n<\/tr>\n
175<\/td>\nTABLE A103.3.7.1(2) DEFAULT U-FACTORS FOR CONCRETE AND MASONRY WALLSa, b, c, d <\/td>\n<\/tr>\n
176<\/td>\nTABLE A103.3.7.1(2)\u2014continued DEFAULT U-FACTORS FOR CONCRETE AND MASONRY WALLSa, b, c, d <\/td>\n<\/tr>\n
177<\/td>\nTABLE A103.3.7.1(2)\u2014continued DEFAULT U-FACTORS FOR CONCRETE AND MASONRY WALLSa, b, c, d <\/td>\n<\/tr>\n
178<\/td>\nTABLE A103.3.7.1(2)\u2014continued DEFAULT U-FACTORS FOR CONCRETE AND MASONRY WALLSa, b, c, d
TABLE A103.3.7.2 DEFAULT U-FACTORS FOR PERIPHERAL EDGES OF INTERMEDIATE CONCRETE FLOORSa, b, c <\/td>\n<\/tr>\n
179<\/td>\nSECTION A104 BELOW-GRADE WALLS AND SLABS
TABLE A104.1 DEFAULT WALL U-FACTORS AND SLAB F-FACTORS FOR BASEMENTS
A104.1 GENERAL
A104.2 COMPONENT DESCRIPTION
A104.3 INSULATION DESCRIPTION <\/td>\n<\/tr>\n
180<\/td>\nSECTION A105 FLOORS OVER UNCONDITIONED SPACE
A105.1 GENERAL
TABLE A105.1(1) DEFAULT U-FACTORS FOR FLOORS OVER VENTED CRAWLSPACE OR UNHEATED BASEMENT
TABLE A105.1(2) DEFAULT U-FACTORS FOR FLOORS OVER HEATED PLENUM CRAWLSPACES
TABLE A105.1(3) DEFAULT U-FACTORS FOR EXPOSED FLOORS
A105.2 CRAWLSPACE DESCRIPTION
A105.2.1 NATURALLY VENTILATED CRAWLSPACES
A105.2.2 MECHANICALLY VENTILATED CRAWLSPACES
A105.2.3 HEATED PLENUM CRAWLSPACES
A105.2.4 EXPOSED FLOORS
A105.3 CONSTRUCTION DESCRIPTION <\/td>\n<\/tr>\n
181<\/td>\nSECTION A106 ON-GRADE SLAB FLOORS
A106.1 GENERAL
TABLE A106.1 DEFAULT F-FACTORS FOR ON-GRADE SLABS
A106.2 COMPONENT DESCRIPTION
A106.3 INSULATION DESCRIPTION
SECTION A107 DEFAULT U-FACTORS FOR DOORS
A107.1 DOORS WITHOUT NFRC CERTIFICATION <\/td>\n<\/tr>\n
182<\/td>\nTABLE A107.1(1) DEFAULT U-FACTORS FOR DOORS <\/td>\n<\/tr>\n
183<\/td>\nTABLE A107.1(2) DEFAULT U-FACTORS FOR REVOLVING DOORS
TABLE A107.1(3) DEFAULT U-FACTORS FOR STEEL EMERGENCY DOORS
TABLE A107.1(4) DEFAULT U-FACTORS FOR STEEL GARAGE AND HANGAR DOORS <\/td>\n<\/tr>\n
184<\/td>\nSECTION A108 AIR INFILTRATION
A108.1 GENERAL
TABLE A108.1(1) ASSUMED EFFECTIVE AIR CHANGES PER HOUR
TABLE A108.1(2) DEFAULT HEAT CAPACITY\/DENSITY PRODUCT FOR AIR <\/td>\n<\/tr>\n
185<\/td>\nAPPENDIX B DEFAULT INTERNAL LOAD VALUES AND SCHEDULES
SECTION B101 GENERAL
B101.1 SCOPE
SECTION B102 DEFAULT TABLES OF INTERNAL LOADS
B102.1 DEFAULT TABLES OF INTERNAL LOADS
TABLE B102 ACCEPTABLE OCCUPANCY DENSITIES, RECEPTACLE POWER DENSITIES AND SERVICE HOT WATER CONSUMPTIONa
SECTION B103 DEFAULT SCHEDULES
B103.1 DEFAULT SCHEDULES <\/td>\n<\/tr>\n
186<\/td>\nTABLE B103(1) ASSEMBLY OCCUPANCYa <\/td>\n<\/tr>\n
187<\/td>\nTABLE B103(2) HEALTH OCCUPANCYa <\/td>\n<\/tr>\n
188<\/td>\nTABLE B103(3) HOTEL\/MOTEL OCCUPANCYa <\/td>\n<\/tr>\n
189<\/td>\nTABLE B103(4) LIGHT MANUFACTURING OCCUPANCYa <\/td>\n<\/tr>\n
190<\/td>\nTABLE B103(5) OFFICE OCCUPANCYa <\/td>\n<\/tr>\n
191<\/td>\nTABLE B103(6) PARKING GARAGE OCCUPANCYa <\/td>\n<\/tr>\n
192<\/td>\nTABLE B103(7) RESTAURANT OCCUPANCYa <\/td>\n<\/tr>\n
193<\/td>\nTABLE B103(8) RETAIL OCCUPANCYa <\/td>\n<\/tr>\n
194<\/td>\nTABLE B103(9) SCHOOL OCCUPANCYa <\/td>\n<\/tr>\n
195<\/td>\nTABLE B103(10) WAREHOUSE OCCUPANCYa <\/td>\n<\/tr>\n
197<\/td>\nAPPENDIX C EXTERIOR DESIGN CONDITIONS
TABLE C-1 OUTDOOR DESIGN TEMPERATURES
TABLE C-1 OUTDOOR DESIGN TEMPERATURES\u2014continued <\/td>\n<\/tr>\n
198<\/td>\nTABLE C-1 OUTDOOR DESIGN TEMPERATURES\u2014continued <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Washington State Energy Code<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
WA<\/b><\/a><\/td>\n2012<\/td>\n198<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":139778,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2738],"product_tag":[],"class_list":{"0":"post-139775","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-wa","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/139775","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/139778"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=139775"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=139775"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=139775"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}